The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO/TS 16949 - International Automotive Quality Systems Standard > QS-9000 - American Automotive Manufacturers Standard


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 11th December 1998, 04:59 PM
BILL MAYNARD
Unregistered Guest

 
Posts: n/a
Default QS 9000 Issues

I recently wrote the Quality Manual & Quality Procedures manual for a Company in Blanchester. We were awarded the QS flag within 1 year of starting to implement the QS 9000 system.
My Question: My manuals (2) are over 300 pages - 100000 plus words & Visio flowcharts.
I am now implementing ISO/QS here in Florida
(Caught a 28 in Red Fish Last Week & Grilled him/her right on the boat.) and just rec'd the 2nd printing of 3rd. addition plus the T.& E. supplement which I have added to the Quality Manual (WHEW). What is the best method of tracking the quality end of mold making (Plastic Injection) Due to the complicated processes it would cause our Co. to fold if we tracked all. I will be audited by Entela around Feb 1999. So quick way - because If I did it the way It should be done It would be yr. 2199 to complete.
Thanks,
First one to aquire Q1 at Ford, Sharonville OH.
Bill (Going Shrimping to night)

[This message has been edited by BILL MAYNARD (edited 12-14-98).]
Reply With Quote

Sponsored Links
  #2  
Old 12th December 1998, 11:27 PM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,859
Thanks Given to Others: 1,895
Thanked 1,568 Times in 1,020 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11569
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Default

Howard? Are you there?

Howard Atkins may be able to help you. He's into injection molding and may be able to fill you in on how his suppliers systems work. If he doesn't respond here, his e-mail is quality@raviv.com
Reply With Quote
Sponsored Links

  #3  
Old 15th December 1998, 01:11 AM
Howard Atkins's Avatar
Howard Atkins Howard Atkins is offline
Forum Administrator

Registration Date: Jul 1997
Location: Revivim, Israel
 
Posts: 2,412
Thanks Given to Others: 100
Thanked 448 Times in 253 Posts
Blog Entries: 8
Karma Power: 195
Karma: 4817
Howard Atkins is appreciated, and has over 1700 Karma points.
Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.
Send a message via Skype™ to Howard Atkins
Default

We are not certified for Mold Making but we treat the mold building side as follows:
We have a written description of the standards to which we expect our molds to be built, including all the various parts down to the standardised couplings that we expect. We then receive a concept from the mold builder which we have a team meeting to approve the concept with a check list of the technical sides, such as cooling, gates, runners, material , hardness etc, etc. Whilst we do this procedure we also do a DFMEA on the mold in relation to the part that will be produced. We then approve the part with the exceptions and additions that we have added. Ther supplier has supllied us with a timetable and we expect him to update this every 2 weeks, this also answers the side of "technical leadership" of sub contractors.
When the mold is finished we inspect and test inject it at the supplier in the presence of an injection specialist and mold builder. We inspect the part make a layout and then instruct the builder to correct, depending on the complexity of the mold we might check agin, after we have approved the mold we give permission to ship and then have an incoming inspection against a checklist.
We also build molds and I intend to registar the mold shop by mid 99. We are QS for injection only.
I hope this helps, if not ask again.
Reply With Quote
  #4  
Old 20th December 1998, 12:45 PM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,859
Thanks Given to Others: 1,895
Thanked 1,568 Times in 1,020 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11569
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Default

Thanks for the feedback, Howard!
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO/TS 16949 - International Automotive Quality Systems Standard > QS-9000 - American Automotive Manufacturers Standard

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
QS-9000 - R.I.P. (aka QS-9000 is Dead Meat and a 'Failure') Roger Eastin QS-9000 - American Automotive Manufacturers Standard 182 7th March 2007 08:38 AM
ISO Issues ISO 9000 - ISO 14000 Publicity Guidelines Marc ISO 9001 - Quality Management Systems Standard 0 8th February 2004 06:46 PM
QS 9000 based ISO 9000:2000 or ISO 9000:1994 Internet-101 QS-9000 - American Automotive Manufacturers Standard 9 31st October 2002 05:21 PM
How does the ISO 9000 revision affect QS 9000 and VDA 6.1 mercon@global.co.za VDA Standards - Germany's Automotive Standards 2 22nd December 2000 07:17 AM
How JIT (Just In Time) fits in with ISO 9000 and QS-9000 Quality Systems KHAN786 ISO 9001:1994 2 17th March 2000 10:29 PM



The time now is 09:14 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts