The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 13th March 2002, 12:10 PM
anrappa
Unregistered Guest

 
Posts: n/a
Question Process Standard deviations and equivalence of Cp & Cpk

Hello Ladies & Gentlemen

By principle of natural tolerancing, the product tolerances are to be so selected that they lie within +/- 3SIGMA of the mfg process

My questions are :

1. Is a table / database giving the standard deviations of various processes(specifically machining processes)available.If yes, could somebody give me the reference/links.

If no, do we have to arrive at the standard deviation of various processes only thro analysis of past data.Could sombody clarify.

2. It is said that cpk = 1.67 implies cp = 2.00. How is this arrived at.

Regards:
Reply With Quote

Sponsored Links
  #2  
Old 13th March 2002, 01:48 PM
Dave Strouse's Avatar
Dave Strouse Dave Strouse is offline
Involved - Posts

Registration Date: Oct 2001
Location: Rochester,NY
Age: 59
 
Posts: 88
Thanks Given to Others: 0
Thanked 14 Times in 7 Posts
Karma Power: 46
Karma: 597
Dave Strouse is appreciated, and has over 500 Karma points.Dave Strouse is appreciated, and has over 500 Karma points.Dave Strouse is appreciated, and has over 500 Karma points.Dave Strouse is appreciated, and has over 500 Karma points.Dave Strouse is appreciated, and has over 500 Karma points.Dave Strouse is appreciated, and has over 500 Karma points.
Default Don't believe it exists

Thoughts on your questions-

(1) I don't think you will be successfull in finding any tables for process standard deviations. There are so many factors, I can't imagine they would be tabulated.

How are you going to use it anyway? I believe you will need to develop this data yourself.

(2) WHO says.
I don't understand what in the world is meant.
Cp is (USL-LSL)/6s.
Cpk is closest or minimum of (USL- xbar/3s, Xbar-LSL/3s). The relationship of Cp to Cpk is Cpk =Cp(1-k) where k (|m-u|/(USL-LSL)/2 and m = (USL+LSL)/2 or the midpoint. But 0 to 1 is the range for k. So Cpk can be almost any value in relation to Cp.
The statement as I read it says that a Cpk of 1.67 always has Cp of 2. One counter example should disprove this.
Consider where LSL is 0 , USL is 10 sigma . Midpoint of spec is at 5 sigma. Cp is 10/6 or 1.67. Since a distribution could be centered on the mean i.e. k=0, we also have Cpk of 1.67.
Let's approach it another way. When will cp of 2 equal cpk 1.67?
From the formula above 1.67 = 2(1-k) or k =0.165.
So only at the k=0.165 value will the statement be true. Don't see how it implies anything remarkable.
Reply With Quote
Sponsored Links

  #3  
Old 13th March 2002, 02:33 PM
Atul Khandekar's Avatar
Atul Khandekar Atul Khandekar is offline
Forum Administrator

Registration Date: Mar 2000
Location: Pune, India
Age: 47
 
Posts: 1,073
Thanks Given to Others: 83
Thanked 84 Times in 55 Posts
Karma Power: 90
Atul Khandekar has disabled his/her Karma.
Send a message via Skype™ to Atul Khandekar
Default

anrappa,

There are no 'standard' values for process std. deviations for manufacturing processes. In any case if you set the tolerance limits 'within' your +/- 3 Sigma limits what would be the process capability? Tolerance represents Customer's voice and process spread is the voice of the process. You will have to study your individual process variation and review tolerances only when it is just not possible for the process to produce within tolerance. I will quote from Grant:

"..specification limit is, of course, the service need of the part. This is not primarily a statistical matter....It often happens that the service needs can be judged more accurately with the aid of statistical methods....There is no use specifying desired tolerances on any quality characteristic without some prospect that these can be met...."

You could determine the variaton by conducting experiments and probably tell the designers what you can achieve. If you best effort does not meet the service requirement, I suppose you'll have to look for a better process.

Cpk=1.67 DOES NOT automatically imply Cp=2. This should be apparent from the formulas used to compute these indices as well as from a simple diagram that explains Cp/Cpk. Look at :
http://www.symphonytech.com/articles...capability.htm

Cp is (Spec width/process width).This does not take into account the centering of the precess. Cpk does that. (As Dave has already explained)

I think you are confusing this with something else -like a six-sigma process has Cp=2 etc?

-Atul.
Reply With Quote
  #4  
Old 14th March 2002, 03:25 AM
Claes Gefvenberg's Avatar
Claes Gefvenberg Claes Gefvenberg is offline
Forum Administrator

Registration Date: May 2000
Location: Eskilstuna, Sweden
Age: 49
 
Posts: 3,771
Thanks Given to Others: 246
Thanked 244 Times in 172 Posts
Blog Entries: 13
Karma Power: 213
Karma: 4951
Claes Gefvenberg is appreciated, and has over 1700 Karma points.
Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.
Lightbulb That's it..

Yep that's it
Quote:
Cp is (Spec width/process width).This does not take into account the centering of the precess. Cpk does that. (As Dave has already explained)
So, simply put you can have a process that is centered way outside tolerance limits and still get a good Cp value, because the spread is good. The Cpk value, on the other hand would be very poor indeed.

/Claes
__________________
Hanlon's Razor.
Never attribute to malice that which can be adequately explained by stupidity.
User Groups: Elsmar Cove Cycling Enthusiasts Formula 1 fanatics Photo freaks Readers Corner
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Are Process Behavior Charts the only way to Analyze Deviations from Targets? D.Salman SPC Monitoring and Statistical Analysis Techniques 6 31st January 2008 10:59 AM
How do you handle process deviations? ScottK ISO 9001 - Quality Management Systems Standard 9 9th October 2006 03:30 PM
Gage R&R - Anova Method - Standard Deviations vs. Variances rderoeck Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 6 21st October 2005 04:03 PM
Cp & Cpk - How are you calculating the standard deviation? MSHELLEY Capability, Accuracy and Stability - Process, Machine, etc. 3 19th February 2001 07:35 AM
Process monitoring of portable & stationary oxygen units: Can we use Cpk, Ppk, SPC ? G.Hester Capability, Accuracy and Stability - Process, Machine, etc. 3 29th March 2000 10:59 AM



The time now is 12:18 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts