The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Design and Development - Process and Product


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 13th March 2002, 12:29 PM
RCW's Avatar
RCW RCW is offline
Involved - Posts

Registration Date: Oct 2001
Location: IL
 
Posts: 261
Thanks Given to Others: 11
Thanked 11 Times in 10 Posts
Karma Power: 41
Karma: 157
RCW is appreciated, and has over 100 Karma points.RCW is appreciated, and has over 100 Karma points.
Angry Design Control - Validation and Verification Dilemma

There has been much heated debate at my company regarding implementing Design Control. Someone here brought up that during a conversation with our registrar, the registrar mentioned that for small engineering jobs, some items like validation and verification did not even have to be performed. To me this seems incorrect. Even for small jobs, there should be some kind of minimalistic record to support that verification and validation has been performed. Also I'm wondering if the registrar actually made such a comment or if it was totally misconstrued.

Another topic mentioned was that the customer could waive the requirements of certain elements (ex. validation or verification). Somebody came up with the idea to present an "ala carte" menu to the customer so he could pick and choose what he wanted done, after seeing the prices associated with each task. To me, this doesn't sound entirely "ISO legal". I would compare this to going to buy a car and the car dealer offers to add a "differential torque converter" for another $2000. Not knowing what a "differential torque converter" is and being asked to pay another $2000, I would probably say no, don't add it. It's the same way with an engineering quote. The customer most likely will not have an idea of what design input is from design output. Also assuming he doesn't want to pay more than necessary, when he sees the extra charge he will most likely say no to it.

I feel the Design Control program is being warped in such a way as to make it less expensive for my company while at the same time watering down the intent of the ISO clause, that is to improve quality of the product and to protect the customer.

Does anybody have any comments on these scenarios?
Reply With Quote

Sponsored Links
  #2  
Old 13th March 2002, 12:50 PM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
I Say...

Verification is always performed. Validation is a different animal and a different issue. Every company and their product has their own scheme.

> Another topic mentioned was that the customer could waive
> the requirements of certain elements (ex. validation or
> verification). Somebody came up with the idea to present
> an "ala carte" menu to the customer so he could pick and
> choose what he wanted done, after seeing the prices
> associated with each task. To me, this doesn't sound
> entirely "ISO legal".

Why not "ala carte"? That's what was behind the brouhaha of US$500 toilet seats and hammers in military procurement a few years back. If you only want a few and you want them tested (validated) out the yazoo you're gonna pay me more to do it. If you want it off the shelf with minimal or no validation I'll sell them to you cheap. ISO says nothing about this in so far as for your specific product with consideration to customer requirements. For some products validation is not done until its actually in use. Keep an open mind, look at your company and your product and your customer requiremetns and don't over do validation for the sake of ISO.

I suggest you go over your (and your fellow engineers) definitions of verification and validation.
__________________
A Search is a terrible thing to waste!
One Test is Worth 1000 Expert Opinions - The plural of anecdote is not data.
We can't solve problems by using the same kind of thinking we used when we created them. - Unknown
Reply With Quote
Sponsored Links

  #3  
Old 13th March 2002, 01:14 PM
RCW's Avatar
RCW RCW is offline
Involved - Posts

Registration Date: Oct 2001
Location: IL
 
Posts: 261
Thanks Given to Others: 11
Thanked 11 Times in 10 Posts
Karma Power: 41
Karma: 157
RCW is appreciated, and has over 100 Karma points.RCW is appreciated, and has over 100 Karma points.
Default

Okay, then for the sake of argument can it be safely said that any or all of the requirements for Design Control can be waived by the customer?

This should make auditing real fun or at least real short. When looking for design inputs or design outputs or design review Mr. Engineer whips out his customer waiver and that gives him diplomatic immunity.

What's going on in my corner of the world is that Engineering is going full blown on every requirement. For design planning or design review, they are looking to have formal meetings in the conference room including multiple people from multiple functions. This is totally impractical for "quickie - get it out the door in a day or two" jobs and I agree that this is a waste of money.

I told them that the 10 or 15 minutes they spend at someones desk discussing the project consitutes review and/or planning and to just jot down a few notes from the conversation to show evidence of review. Keep it simple, make it as quick and painless as possible.

OBTW, my company was heavily into military sales. It still does some mil work but also a lot of industrial and commercial work. It's difficult to get people out of the mil job mindset when you don't have multiple months and huge bugets to get product out the door.
Reply With Quote
  #4  
Old 13th March 2002, 02:06 PM
CarolX's Avatar
CarolX CarolX is offline
Super Moderator

Registration Date: Jun 2000
Location: North of Chicago,Illinois, USA
Age: 49
 
Posts: 2,087
Thanks Given to Others: 419
Thanked 314 Times in 234 Posts
Karma Power: 176
Karma: 4810
CarolX is appreciated, and has over 1700 Karma points.
CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.
Default another spin

Hello RCW,

Quote:
OBTW, my company was heavily into military sales.
Is it safe to assume that you do not have design authority over the product, that you are manufacturing to customer drawings/specifications? If so, then design review really doesn't apply to what you do.

Let me share whith you what we do. Everything we do is mad to customer drawings and specifications. We have no input in the "design" phase of the products, we are just a job shop making one, two or three parts of a larger piece. We do engineering work in the way of developing machine programs to make the parts, we perform first article inspections to verify parts are to print, and we make recommendations to the customer on how to make parts better, or more effectively.

I don't know how musch this may help, but there it is.

I agree whith Marc's statement - "Why not a-la catre?" - ISO is all about giving the customer what they want.

Regards,

CarolX

P.S. - Marc, I like the new avatar! Just watch out for those guys from Wisconsin!!! LOL
__________________
CarolX

Theater is life, film is art, and television is furniture.
Reply With Quote
  #5  
Old 13th March 2002, 05:26 PM
RCW's Avatar
RCW RCW is offline
Involved - Posts

Registration Date: Oct 2001
Location: IL
 
Posts: 261
Thanks Given to Others: 11
Thanked 11 Times in 10 Posts
Karma Power: 41
Karma: 157
RCW is appreciated, and has over 100 Karma points.RCW is appreciated, and has over 100 Karma points.
Default

Sorry CarolX,

My company has their feet in both worlds. While we have some jobs that are just "build to print" which envolve only manufacturing, we also do engineering design for products which we later build.

I don't really have anything against the "ala carte" method. The only thing that sticks in my mind is clause 7.2.1 b) "The organization shall determine requirements not stated by the customer but necessary for specified or intended use, where known." To me this means to use your own personal insight into the job and be aware of things that the customer might not be aware of or have no knowledge in.

It gets back to my car example. The customer will usually want the quickest and cheapest route to get his product (unless it's a military job ). Does quick and cheap delivery a quality product? Sometimes yes, probably most of the time, no.

I guess it's up to me to instill in the Engineering staff to not get bogged down to the letter of the ISO spec, just try to meet the spirit of it

OBTW, while my current title is Quality Manager, I used to work as a designer in the Engineering department. Talk about straddling a fence!
Reply With Quote
  #6  
Old 14th March 2002, 06:32 AM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Yin Yang

> I don't really have anything against the "ala carte"
> method. The only thing that sticks in my mind is clause
> 7.2.1 b) "The organization shall determine requirements
> not stated by the customer but necessary for specified or
> intended use, where known." To me this means to use your
> own personal insight into the job and be aware of things
> that the customer might not be aware of or have no
> knowledge in.

95 times out of 100 a company has already identified items which are a liability to it. The "ala carte" is just above and beyond your internal requirements. For example, if you made car seats for toddlers and babies I would hope that even though customers may not specify it, your company would go through a rigorous validation process so that any failure could be addressed in court through evidence of 'due dilligence' on the part of your company.
__________________
A Search is a terrible thing to waste!
One Test is Worth 1000 Expert Opinions - The plural of anecdote is not data.
We can't solve problems by using the same kind of thinking we used when we created them. - Unknown
Reply With Quote
  #7  
Old 14th March 2002, 08:07 AM
M Greenaway's Avatar
M Greenaway M Greenaway is offline
Courtesy Access

Registration Date: Dec 2001
Location: England
 
Posts: 1,643
Thanks Given to Others: 10
Thanked 63 Times in 44 Posts
Karma Power: 80
Karma: 794
M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.
Default

Well said Marc.

Safety is probably the paramount issue when considering design validation.

A good design FMEA should highlight the need for validation.
Reply With Quote
  #8  
Old 14th March 2002, 04:03 PM
Rockanna Rockanna is offline
Rockanna Star

Registration Date: Jan 2002
Location: SC
Age: 53
 
Posts: 48
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 32
Karma: 10
Rockanna has less than 100 Karma points so far.
Our company produces parts for the government as well as design parts. We have tried to get out of the thought process of what does ISO require and make a turn around to what does our business require us to have in place. Design review is an important element in the success of our company (not to mention legal matters). Documenting the entire process under one set of rules, whether the design is large or small, makes sense to us.
I hope this helps.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Design and Development - Process and Product

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Can Process Validation actually be Design Verification? Wicker Design and Development - Process and Product 4 11th September 2008 05:36 PM
Clause 7.3 Design and Development - Verification and Validation Randy Design and Development - Process and Product 3 18th August 2008 01:58 PM
Design Verification vs. Validation - What is YOUR definition? Marc Design and Development - Process and Product 17 15th July 2005 04:21 AM
Design: Major distinction between 7.3.5 Verification and 7.3.6 Validation? Rich Shippy Design and Development - Process and Product 5 19th March 2005 01:02 PM
Design and Process - Validation vs. Verification - What is the difference? dbzman Design and Development - Process and Product 20 13th June 2003 03:36 PM



The time now is 06:26 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts