|
Elsmar Cove Forum Sidebar
|
|
|
|
Monitor the Elsmar Forum
|
| Monitor New Forum Posts
|
|
Follow Marc & Elsmar
|
|
|
Elsmar Cove Groups
|
|
|
Sponsor Links
|
|
|
|
|
|
Donate and $ Contributor Forum Access
|
 |
|
Sponsored Links
|
|
|
|
Courtesy Quick Links
|
 Links that Elsmar Cove visitors will find useful in your quest for knowledge:
Howard's International Quality Services
Atul's Symphony Technologies
Marcelo Antunes' SQR Consulting
Bob Doering's Correct SPC - Precision Machining
NIST's Engineering Statistics Handbook
IRCA - International Register of Certified Auditors
SAE - Society of Automotive Engineers
Quality Digest Portal
IEST - Institute of Environmental Sciences and Technology
ASQ - American Society for Quality
|
|
 |

24th November 2010, 10:37 PM
|
|
Involved in Discussions
Registration Date: May 2010
Location: UAE
|
|
Posts: 13
Thanks Given to Others: 11
Thanked 0 Times in 0 Posts
Karma Power: 14 Karma: 10 
|
|
Design & Development Input Records Requirements - ISO 9001 Clause 7.3.2
Hi Forum users,
Can someone help me to solve the below query?
1. Is there any separate formats to be maintained to records design inputs? Is it enough that if we maintain a copy of the product data sheets, specificaitons & docs. which are from customers/clients?
But as per ISO 7.3.2 is saying that the design inputs are shall be maintained as per Cl. 4.2.4.
Regards,
Kumar D.
|

25th November 2010, 12:07 AM
|
|
Super Moderator
Registration Date: Sep 2005
Location: Johore/Malaysia
|
|
Posts: 5,955
Thanks Given to Others: 1,406
Thanked 2,748 Times in 1,909 Posts
Karma Power: 662
|
|
|
Re: Design & Development Input Records Requirements - ISO 9001 Clause 7.3.2
Quote:
In Reply to Parent Post by DK2327
................. But as per ISO 7.3.2 is saying that the design inputs are shall be maintained as per Cl. 4.2.4. ................
|
You missed the key part. It says: Inputs relating to product requirements shall be determined and records maintained (4.2.4)
You identify and determine (justify if necessary) what the inputs are and keep records.
Last edited by harry; 25th November 2010 at 12:28 AM.
|
|
Thanks to harry for your informative Post and/or Attachment!
|
|

25th November 2010, 02:43 AM
|
 |
Cross Forum Moderator
Registration Date: Mar 2008
Location: Bangalore city, INDIA
|
|
Posts: 3,835
Thanks Given to Others: 1,203
Thanked 1,928 Times in 1,365 Posts
Karma Power: 430
|
|
|
Re: Design & Development Input Records Requirements - ISO 9001 Clause 7.3.2
Quote:
In Reply to Parent Post by DK2327
Hi Forum users,
Can someone help me to solve the below query?
1. Is there any separate formats to be maintained to records design inputs? Is it enough that if we maintain a copy of the product data sheets, specificaitons & docs. which are from customers/clients?
But as per ISO 7.3.2 is saying that the design inputs are shall be maintained as per Cl. 4.2.4.
Regards,
Kumar D.
|
Hi Kumar ...
In 4.2.4. procedure you state that design input is an identified record.
7.3.2 says that records of design and development inputs shall be maintained.
Now maintain all your design and development inputs. (Identify, store, protect, plan for easy and quick retrieval, hold for a defined time)
These will form the required records. Do not think about any format to complicate your task.
__________________
Best Regards...
Somashekar BV, INDIA
|

25th November 2010, 05:49 AM
|
|
Involved in Discussions
Registration Date: May 2010
Location: UAE
|
|
Posts: 13
Thanks Given to Others: 11
Thanked 0 Times in 0 Posts
Karma Power: 14 Karma: 10 
|
|
|
Re: Design & Development Input Records Requirements - ISO 9001 Clause 7.3.2
Thanks a lot Mr.Somashekar, but one more query.
Is it required to state the name of input records to be maintained in our QA procedure (Design procedure), for eg. if our input records are Data sheets, project docs. & specs. the same to be addressed in our QAP?
Regards,
Kumar D.
|

25th November 2010, 05:58 AM
|
|
Appreciated Member
Registration Date: Jan 2002
Location: United Kingdom
Age: 52
|
|
Posts: 1,705
Thanks Given to Others: 457
Thanked 552 Times in 355 Posts
Karma Power: 226
|
|
|
Re: Design & Development Input Records Requirements - ISO 9001 Clause 7.3.2
Quote:
In Reply to Parent Post by DK2327
Hi Forum users,
Can someone help me to solve the below query?
1. Is there any separate formats to be maintained to records design inputs? Is it enough that if we maintain a copy of the product data sheets, specificaitons & docs. which are from customers/clients?
|
No requirement to use any particular format - it's up to you. Some organizations do use a proforma in particular to capture their review of the design inputs and any decisions that come out of that. Again it is personal preference.
Quote:
In Reply to Parent Post by DK2327
But as per ISO 7.3.2 is saying that the design inputs are shall be maintained as per Cl. 4.2.4.
Regards,
Kumar D.
|
The idea is that the organization maintains records that show what requirements the product was designed to meet. The record could be in a number of different formats including hard copy, eectronic, physical product etc.
__________________
Rgds, Paul Simpson
There has to be a better way .... surely?
|
|
Thanks to Paul Simpson for your informative Post and/or Attachment!
|
|

25th November 2010, 08:32 AM
|
 |
Cross Forum Moderator
Registration Date: Mar 2008
Location: Bangalore city, INDIA
|
|
Posts: 3,835
Thanks Given to Others: 1,203
Thanked 1,928 Times in 1,365 Posts
Karma Power: 430
|
|
|
Re: Design & Development Input Records Requirements - ISO 9001 Clause 7.3.2
Quote:
In Reply to Parent Post by DK2327
Thanks a lot Mr.Somashekar, but one more query.
Is it required to state the name of input records to be maintained in our QA procedure (Design procedure), for eg. if our input records are Data sheets, project docs. & specs. the same to be addressed in our QAP?
Regards,
Kumar D.
|
Typical design inputs may be stated in your procedure, however inputs to design and development will be sought from many informations, discussions, articles, etc etc., as one gets involved in the design process. One of the best inputs is perhaps learnings from previous typical design experiences.
Again the ISO 9001:2008 does not demand a documented procedure. However, in case you go ahead and make one, feel free to keep these aspects open and do not tie down yourself.
__________________
Best Regards...
Somashekar BV, INDIA
|
|
Thanks to somashekar for your informative Post and/or Attachment!
|
|

29th November 2012, 01:47 PM
|
|
Shy Poster (1 to 5 Posts)
Registration Date: Feb 2012
|
|
Posts: 1
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 6 Karma: 10 
|
|
|
Re: Design & Development Input Records Requirements - ISO 9001 Clause 7.3.2

Hello
I am new at this so not quite sure how to post a new topic I am hoping someone will be able to answer my question.
Are we required to keep the same level of documentation on small project (?) changes to design as we would with a larger project. I work in a medical device environment but we do not fall under the FDA guidelines yet. We currently create a project, and complete all documentation IDR, PDC, PMP and FDR that is required but it seems excessive with small projects or changes. For Example; Increase the size of a holes diameter for smoother movement, change of color, screen prints. If the change does not affect the quality or workings of the instrument would all of the necessary documentation that would be completed on a full instrument or components development be required? Could these types of things go through and ECN instead? Can the changes be added to the original full instrument project that was created previously?
Thanks
Rebecca
|

5th December 2012, 12:45 AM
|
 |
Involved in Discussions
Registration Date: Jun 2009
Location: Australia
|
|
Posts: 37
Thanks Given to Others: 39
Thanked 8 Times in 6 Posts
Karma Power: 19 Karma: 179  
|
|
|
Re: Design & Development Input Records Requirements - ISO 9001 Clause 7.3.2
7.3.7 Control of Design and Development Changes "shall be identified and records maintained", this requirement would usually be satisfied by an ECN type change process. So long as the ECN is able to be traced to the original project/component (via a designated part or project number), I would think this would cover it.
|
Lower Navigation Bar
|
|
|
Do you find this discussion thread helpful and informational?
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Forum Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|