Elsmar Cove Forum Sidebar
|
|
|
|
Monitor the Elsmar Forum
|
| Monitor New Forum Posts
|
|
Follow Marc & Elsmar
|
|
|
Elsmar Cove Groups
|
|
|
Sponsor Links
|
|
|
|
|
|
Donate and $ Contributor Forum Access
|
 |
|
Sponsored Links
|
|
|
|
Courtesy Quick Links
|
 Links that Elsmar Cove visitors will find useful in your quest for knowledge:
Howard's International Quality Services
Atul's Symphony Technologies
Marcelo Antunes' SQR Consulting
Bob Doering's Correct SPC - Precision Machining
NIST's Engineering Statistics Handbook
IRCA - International Register of Certified Auditors
SAE - Society of Automotive Engineers
Quality Digest Portal
IEST - Institute of Environmental Sciences and Technology
ASQ - American Society for Quality
|
|
 |
|

8th April 2002, 09:35 AM
|
|
Inactive Registered Visitor
Registration Date: Sep 2001
Location: New York
|
|
Posts: 68
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 54 Karma: 10 
|
|
Does every Nonconformance Require a Corrective Action?
As part of the implementation of a Quality System in a multi million dollar company that has none, I set up a database on the Intranet to record in process discrepancies. The database is accessable by all employees and is configured to accept input from any point in the manufacturing process, from material receipt to product shipment. The operator has the ability to check a box on the input form to automatically generate a Corrective Action for review/distribution by QA. An example of an entry may be a jumper missing when trouble shooting an electrical rack. The technician will want a CAR if this is something he/she has seen before. Periodically I use Excel to review the data and identify additional entries needing CARs. In addition, this review is used to identify areas requiring training of personnel. As a result we have generated over fifty CARs and SCARs in the few months the system has been in operation.
The problem is the amount of entries, currently 497. The VP Quality (Corporate) questioned why all entries do not have a corrective action. I explained that the system was not only a Corrective Action system, but was gathering data for continuous improvement in many areas. I thought we had cleared this, but he questioned it again today, as "an ISO requirement", the result of a procedure I wrote for using the database.
My question - where does it say every discrepancy must have a written/documented corrective action?
|

8th April 2002, 10:33 AM
|
 |
VINI, VIDI, DORMIVI
Registration Date: Feb 2002
Location: Walled Lake, Michigan
|
|
Posts: 1,153
Thanks Given to Others: 20
Thanked 89 Times in 58 Posts
Karma Power: 164
|
|
|
It doesn't Ken. It is up to you/your system to determine when it is appropriate. If you documented it in your procedure that all will have corrective action then there may be a problem. I would question the system if the amount of entries haven't generated any CARs.
IMO I would be looking at how the entries are addressed by QA etc. When they are reviewed what criteria generates the CA, is the established criteria consistently used and understood, etc. If CA isn't required is there any feedback to the operator?
It would seem you have buy in from the operators, and that isn't always easy.
__________________
"What this country needs is more unemployed politicians." Edward Langley
|

8th April 2002, 10:56 AM
|
 |
Forum Administrator
Registration Date: May 2000
Location: Eskilstuna, Sweden
Age: 53
|
|
Posts: 4,560
Thanks Given to Others: 927
Thanked 640 Times in 444 Posts
Karma Power: 400
|
|
Definitions...
First of all, that seems like a good way to get a grip on things. I'd say you have a very potent tool there. It's obvious that you have your sights set for continual improvement.
Quote:
|
My question - where does it say every discrepancy must have a written/documented corrective action?
|
Interesting... Let's reason a bit:
So let's say a missing jumper is detected. I don't think I'm far off in guessing that some of these things are quite common, and are detected in the normal inspection in your process? That would mean that the situation is under control and just maybe it doesn't warrant a CAR, but rather continual improvement as you point out yourself. If you suddely detect a dramatic increase in some area... Now that's a different story: That should initiate a CAR, and that CAR could adress a number of entries...
"requiring training of personnel" That could be a very suitable corrective action, too...
The definition of a Corrective action is that it shall eliminate the cause of a detected nonconformity, right? And the definition of a nonconformity is that a requirements is not fulfilled. Then we come to your procedure. What does it say?
/Claes
|

8th April 2002, 11:08 AM
|
|
Inactive Registered Visitor
Registration Date: Sep 2001
Location: New York
|
|
Posts: 68
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 54 Karma: 10 
|
|
|
I'm partially venting with this topic, and partially looking for input. My greatest fear is that the system will be overloaded with CARs which will defeat the value of the responses, or the techs will not see a clear result and will back off. I'm trying to find a balance and ammunition to sell it. 497 CARs in 4 months is to my mind ridiculous.
Initial operator buy in was not a problem, they were tired of complaining about the same things over and over. Once they saw one problem addressed and corrected they bought in big time.
The system collects a wide range of information on each discrepancy (drop down lists make it easy). The preliminary procedure lists criteria for a CAR, including things like time lost, repetition, input by the tech and, during the review, cost similarity to other instances.
As an example of the area of disagreement consider an electrical rack with over 1000 connecting wires. One is missing. The tech spent less than 15 minutes finding and repairing it. No damage was caused by the missing wire. On nine other tools this was not a problem. I do not consider this a candidate for a CAR, and it does not meet the criteria in the preliminary procedure. This is actually the first of several discrepancies brought to my attention by the powers above, and the first we disagreed on.
Incidentally, the procedure addresses discrepancies that are similar in nature (i.e. different jumpers missing in each of several racks) which get identified during review and addressed with a kind of global CAR, workmanship oriented.
|

8th April 2002, 11:31 AM
|
 |
Forum Administrator
Registration Date: May 2000
Location: Eskilstuna, Sweden
Age: 53
|
|
Posts: 4,560
Thanks Given to Others: 927
Thanked 640 Times in 444 Posts
Karma Power: 400
|
|
I'm with you
Quote:
|
I'm partially venting with this topic, and partially looking for input. My greatest fear is that the system will be overloaded with CARs which will defeat the value of the responses, or the techs will not see a clear result and will back off. I'm trying to find a balance and ammunition to sell it. 497 CARs in 4 months is to my mind ridiculous.
|
Yes it is. I think you have come up with a winner tool, as long as you can keep your number of CAR's on a reasonable level.
Good luck, and do let us know how it's going.
/Claes
|

7th May 2011, 11:53 AM
|
|
Appreciated Member
Registration Date: Jan 2008
Location: India
|
|
Posts: 114
Thanks Given to Others: 23
Thanked 45 Times in 38 Posts
Karma Power: 33
|
|
|
Re: Does every Nonconformance Require a Corrective Action?
In my opinion, corrective actions are applicable when the correction is possible, feasible and necessary.This does not apply for all cases.
However a preventive action for all failures is a must! As you already mentioned that your focus is Continual Improvement, I think you have a good tool ..may be you can add a logic tab where it says types of NC and on selection prompts for CAR ( The criteria can be defined by you) .............. But I must appreciate with the idea of collecting all failure reports, great!
|

7th May 2011, 03:36 PM
|
|
Appreciated Information Resource
Registration Date: Oct 2009
|
|
Posts: 840
Thanks Given to Others: 356
Thanked 272 Times in 198 Posts
Karma Power: 102
|
|
|
Re: Does every Nonconformance Require a Corrective Action?
Hi Amit,
I apologize for replying to your post, but you shall change your view.
Quote:
|
However a preventive action for all failures is a must!
|
Preventive action can defined in order to avoid the occurance of potential non conformity, so when we are talking about preventive action, the source of such action can NOT be a non conformity.
The source for preventive action is reaching a threshold level BELOW the non conformity, warning us, in case we do not act, potentially the non conformity likely to happen.
br
Sz.
|
|
Thanks to sagai for your informative Post and/or Attachment!
|
|

20th May 2011, 12:49 AM
|
|
Appreciated Member
Registration Date: Jan 2008
Location: India
|
|
Posts: 114
Thanks Given to Others: 23
Thanked 45 Times in 38 Posts
Karma Power: 33
|
|
|
Re: Does every Nonconformance Require a Corrective Action?
I fully agree with you, I missed the word potential before failure
|
Lower Navigation Bar
|
|
|
Do you find this discussion thread helpful and informational?
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Forum Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|