The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Aerospace and Aviation Standards and Requirements > AS9100, Nadcap and related Aerospace Standards and Requirements
Forum Username


Elsmar Cove Forum Sidebar
Custom Search
Monitor the Elsmar Forum
Monitor New Forum Posts
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Sponsor Links







Donate and $ Contributor Forum Access
Sponsored Links
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's
International Quality Services

Atul's
Symphony Technologies

Marcelo Antunes'
SQR Consulting

Bob Doering's
Correct SPC - Precision Machining


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


Related Topic Tags
flowcharts, procedure examples, as9100 - aerospace quality management systems, 7.1.2 - acceptance criteria (ts 16949), procedures (general), risk management and analysis
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 12th January 2011, 09:24 AM
Doug's Avatar
Doug Doug is offline
Life Balance

 
Registration Date: Nov 2007
Location: New Kensington, Pa.
 
Posts: 77
Thanks Given to Others: 255
Thanked 15 Times in 12 Posts
Karma Power: 30
Karma: 160
Doug is appreciated, and has over 100 Karma points.Doug is appreciated, and has over 100 Karma points.
Thank You! AS9100C Risk Management Procedure Example wanted

Hello Folks,
I am interested in a generic example of an AS9100C Level 2 procedure or flowchart for Risk Management (7.1.2). I have some ideas but would appreciate your input. I am especially fond of flowcharts.

I tried a search but came up short.

Thanks in advance for your help!

Sponsored Links
  #2  
Old 13th January 2011, 02:45 AM
Stijloor's Avatar
Stijloor Stijloor is offline
Cross Forum Moderator

 
Registration Date: May 2003
Location: Charlotte, North Carolina.
 
Posts: 13,432
Thanks Given to Others: 2,950
Thanked 4,270 Times in 3,026 Posts
Karma Power: 1431
Karma: 23897
Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.
Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.
Re: AS9100C Risk Management Procedure Example wanted

Quote:
In Reply to Parent Post by Doug View Post

Hello Folks,
I am interested in a generic example of an AS9100C Level 2 procedure or flowchart for Risk Management (7.1.2). I have some ideas but would appreciate your input. I am especially fond of flowcharts.

I tried a search but came up short.

Thanks in advance for your help!
Can someone help Doug?

Thank you!!

Stijloor.
Thanks to Stijloor for your informative Post and/or Attachment!
Sponsored Links

  #3  
Old 13th January 2011, 10:02 AM
Big Jim Big Jim is offline
Appreciated Information Resource

 
Registration Date: Feb 2008
Location: USA, Southern California
 
Posts: 1,919
Thanks Given to Others: 847
Thanked 829 Times in 568 Posts
Karma Power: 224
Karma: 5724
Big Jim is appreciated, and has over 1700 Karma points.
Big Jim is appreciated, and has over 1700 Karma points.Big Jim is appreciated, and has over 1700 Karma points.Big Jim is appreciated, and has over 1700 Karma points.Big Jim is appreciated, and has over 1700 Karma points.Big Jim is appreciated, and has over 1700 Karma points.Big Jim is appreciated, and has over 1700 Karma points.Big Jim is appreciated, and has over 1700 Karma points.Big Jim is appreciated, and has over 1700 Karma points.Big Jim is appreciated, and has over 1700 Karma points.Big Jim is appreciated, and has over 1700 Karma points.Big Jim is appreciated, and has over 1700 Karma points.Big Jim is appreciated, and has over 1700 Karma points.Big Jim is appreciated, and has over 1700 Karma points.Big Jim is appreciated, and has over 1700 Karma points.Big Jim is appreciated, and has over 1700 Karma points.
Re: AS9100C Risk Management Procedure Example wanted

Private Message Sent
Thank You to Big Jim for your informative Post and/or Attachment!
  #4  
Old 19th January 2011, 12:56 PM
Jamien Jamien is offline
Getting Involved (6 to 9 Posts)

 
Registration Date: Jan 2011
 
Posts: 8
Thanks Given to Others: 6
Thanked 0 Times in 0 Posts
Karma Power: 10
Karma: 10
Jamien has less than 100 Karma points so far.
Re: AS9100C Risk Management Procedure Example wanted

I was so excited to see someone had the same question I did about a Risk Management procedure - but deflated when I did not have access to the reply. I just had my Stage 1 audit for AS9100 Rev C and that was one of the areas I fell short (and Configuration Management but there is a lot of info I have obtained in my search). Can someone help me with a generic procedure or flowchart for Risk Management?
  #5  
Old 19th January 2011, 01:35 PM
Doug's Avatar
Doug Doug is offline
Life Balance

 
Registration Date: Nov 2007
Location: New Kensington, Pa.
 
Posts: 77
Thanks Given to Others: 255
Thanked 15 Times in 12 Posts
Karma Power: 30
Karma: 160
Doug is appreciated, and has over 100 Karma points.Doug is appreciated, and has over 100 Karma points.
Re: AS9100C Risk Management Procedure Example wanted

Quote:
In Reply to Parent Post by Jamien View Post

I was so excited to see someone had the same question I did about a Risk Management procedure - but deflated when I did not have access to the reply. I just had my Stage 1 audit for AS9100 Rev C and that was one of the areas I fell short (and Configuration Management but there is a lot of info I have obtained in my search). Can someone help me with a generic procedure or flowchart for Risk Management?
If you send me a private message with an e-mail address, I will forward to you what I received. I found it helpful.
Thank You to Doug for your informative Post and/or Attachment!
  #6  
Old 19th January 2011, 04:21 PM
documan documan is offline
Shy Poster (1 to 5 Posts)

 
Registration Date: Jan 2011
Location: Mundelein, Illinois
 
Posts: 3
Thanks Given to Others: 0
Thanked 2 Times in 2 Posts
Karma Power: 10
Karma: 20
documan has less than 100 Karma points so far.
Re: AS9100C Risk Management Procedure Example wanted

Quote:
In Reply to Parent Post by Doug View Post

Hello Folks,
I am interested in a generic example of an AS9100C Level 2 procedure or flowchart for Risk Management (7.1.2). I have some ideas but would appreciate your input. I am especially fond of flowcharts.

I tried a search but came up short.

Thanks in advance for your help!
Doug,
Our company is scheduled for a AS9100C audit in the spring. We are a high volumn producer of components for the aerospace industry. We are not design responsible and manufacture product to all customer drawing requirements.
We addressed the Risk Management requirement (7.1.2) as follows:
"The processes are all mature. Risk levels have been determined by numerous FMEA's including gage capability studies. Posted Control Plans incorporate risk levels and action plans if the risk factor actually becomes a problem".
Related operational procedures are Contract Review, Document Control, Process Control and Quality Records. All comments on the above will be greatly appreciated.
Regards,
documan
Thanks to documan for your informative Post and/or Attachment!
  #7  
Old 20th January 2011, 09:36 AM
Doug's Avatar
Doug Doug is offline
Life Balance

 
Registration Date: Nov 2007
Location: New Kensington, Pa.
 
Posts: 77
Thanks Given to Others: 255
Thanked 15 Times in 12 Posts
Karma Power: 30
Karma: 160
Doug is appreciated, and has over 100 Karma points.Doug is appreciated, and has over 100 Karma points.
Re: AS9100C Risk Management Procedure Example wanted

Thanks to Big Jim for his help. There have been additional request!!!
  #8  
Old 20th January 2011, 09:37 AM
Doug's Avatar
Doug Doug is offline
Life Balance

 
Registration Date: Nov 2007
Location: New Kensington, Pa.
 
Posts: 77
Thanks Given to Others: 255
Thanked 15 Times in 12 Posts
Karma Power: 30
Karma: 160
Doug is appreciated, and has over 100 Karma points.Doug is appreciated, and has over 100 Karma points.
Re: AS9100C Risk Management Procedure Example wanted

Quote:
In Reply to Parent Post by documan View Post

Doug,
Our company is scheduled for a AS9100C audit in the spring. We are a high volumn producer of components for the aerospace industry. We are not design responsible and manufacture product to all customer drawing requirements.
We addressed the Risk Management requirement (7.1.2) as follows:
"The processes are all mature. Risk levels have been determined by numerous FMEA's including gage capability studies. Posted Control Plans incorporate risk levels and action plans if the risk factor actually becomes a problem".
Related operational procedures are Contract Review, Document Control, Process Control and Quality Records. All comments on the above will be greatly appreciated.
Regards,
documan
All good information. Thanks for your help!
Thanks to Doug for your informative Post and/or Attachment!
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Aerospace and Aviation Standards and Requirements > AS9100, Nadcap and related Aerospace Standards and Requirements

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 2 (1 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
stbernard
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Risk Management Statement for our Quality Manual help wanted savvylady AS9100, Nadcap and related Aerospace Standards and Requirements 6 21st September 2011 09:03 AM
AS9100C Special Process Procedure - Work Instruction for AS9100 Clause 7.5.2 wanted Rockanna AS9100, Nadcap and related Aerospace Standards and Requirements 3 26th July 2011 10:27 PM
Risk Management (ISO 31000) and AS9100C - Gap Analysis Template Needed kim bennett guinn AS9100, Nadcap and related Aerospace Standards and Requirements 2 11th November 2010 01:09 AM
Risk Management Policy example and advice wanted KAMay ISO 14971 - Medical Device Risk Management 3 19th August 2010 12:23 PM
Risk Management Procedure - Please review Koivisto - 2009 AS9100, Nadcap and related Aerospace Standards and Requirements 5 25th November 2008 08:55 AM



The time now is 11:31 AM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, Olde West Chester, Ohio 45069-1929
513 341-6272