The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page
Miner's MSA (Measurement Systems Analysis) Blog   Elsmar.com Forum Home Page
Go Back   The Elsmar Cove Forum > Aerospace and Aviation Standards and Requirements > AS9100, Nadcap and related Aerospace Standards and Requirements
Forum Username

Search the Elsmar Cove
Custom Search
Monitor the Elsmar Forum
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page  Elsmar Cove Twitter Feed
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Donate and $ Contributor Forum Access

Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:

Howard's
International Quality Services
Marcelo Antunes'
SQR Consulting
Bob Doering's
Correct SPC - Precision Machining

NIST's Engineering Statistics Handbook
IRCA - International Register of Certified Auditors
SAE - Society of Automotive Engineers
Quality Digest Portal
IEST - Institute of Environmental Sciences and Technology
ASQ - American Society for Quality

Related Topic Tags
flowcharts, procedure examples, as9100 - aerospace quality management systems, 7.1.2 - acceptance criteria (ts 16949), procedures (general), risk management and analysis
Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 2 votes, 5.00 average. Display Modes
  #1  
Old 12th January 2011, 09:24 AM
Doug's Avatar
Doug

 
 
Posts: 86
Thank You! AS9100C Risk Management Procedure Example

Hello Folks,
I am interested in a generic example of an AS9100C Level 2 procedure or flowchart for Risk Management (7.1.2). I have some ideas but would appreciate your input. I am especially fond of flowcharts.

I tried a search but came up short.

Thanks in advance for your help!

Sponsored Links
  #2  
Old 13th January 2011, 02:45 AM
Stijloor's Avatar
Stijloor

 
 
Posts: 14,598
Re: AS9100C Risk Management Procedure Example wanted

Can someone help Doug?

Thank you!!

Stijloor.
Thanks to Stijloor for your informative Post and/or Attachment!
Sponsored Links

  #3  
Old 13th January 2011, 10:02 AM
Big Jim

 
 
Posts: 2,397
Re: AS9100C Risk Management Procedure Example wanted

Private Message Sent
Thank You to Big Jim for your informative Post and/or Attachment!
  #4  
Old 19th January 2011, 12:56 PM
Jamien

 
 
Posts: 8
Re: AS9100C Risk Management Procedure Example wanted

I was so excited to see someone had the same question I did about a Risk Management procedure - but deflated when I did not have access to the reply. I just had my Stage 1 audit for AS9100 Rev C and that was one of the areas I fell short (and Configuration Management but there is a lot of info I have obtained in my search). Can someone help me with a generic procedure or flowchart for Risk Management?
  #5  
Old 19th January 2011, 01:35 PM
Doug's Avatar
Doug

 
 
Posts: 86
Re: AS9100C Risk Management Procedure Example wanted

If you send me a private message with an e-mail address, I will forward to you what I received. I found it helpful.
Thank You to Doug for your informative Post and/or Attachment!
  #6  
Old 19th January 2011, 04:21 PM
documan - 2011

 
 
Posts: 3
Re: AS9100C Risk Management Procedure Example wanted

Quote:
In Reply to Parent Post by Doug View Post

Hello Folks,
I am interested in a generic example of an AS9100C Level 2 procedure or flowchart for Risk Management (7.1.2). I have some ideas but would appreciate your input. I am especially fond of flowcharts.

I tried a search but came up short.

Thanks in advance for your help!
Doug,
Our company is scheduled for a AS9100C audit in the spring. We are a high volumn producer of components for the aerospace industry. We are not design responsible and manufacture product to all customer drawing requirements.
We addressed the Risk Management requirement (7.1.2) as follows:
"The processes are all mature. Risk levels have been determined by numerous FMEA's including gage capability studies. Posted Control Plans incorporate risk levels and action plans if the risk factor actually becomes a problem".
Related operational procedures are Contract Review, Document Control, Process Control and Quality Records. All comments on the above will be greatly appreciated.
Regards,
documan
Thank You to documan - 2011 for your informative Post and/or Attachment!
  #7  
Old 20th January 2011, 09:36 AM
Doug's Avatar
Doug

 
 
Posts: 86
Re: AS9100C Risk Management Procedure Example wanted

Thanks to Big Jim for his help. There have been additional request!!!
  #8  
Old 20th January 2011, 09:37 AM
Doug's Avatar
Doug

 
 
Posts: 86
Re: AS9100C Risk Management Procedure Example wanted

Quote:
In Reply to Parent Post by documan View Post

Doug,
Our company is scheduled for a AS9100C audit in the spring. We are a high volumn producer of components for the aerospace industry. We are not design responsible and manufacture product to all customer drawing requirements.
We addressed the Risk Management requirement (7.1.2) as follows:
"The processes are all mature. Risk levels have been determined by numerous FMEA's including gage capability studies. Posted Control Plans incorporate risk levels and action plans if the risk factor actually becomes a problem".
Related operational procedures are Contract Review, Document Control, Process Control and Quality Records. All comments on the above will be greatly appreciated.
Regards,
documan
All good information. Thanks for your help!
Thanks to Doug for your informative Post and/or Attachment!
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Aerospace and Aviation Standards and Requirements > AS9100, Nadcap and related Aerospace Standards and Requirements

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Risk Identification Methods and Risk Management Procedure Uriel Alejandro AS9100, Nadcap and related Aerospace Standards and Requirements 23 13th March 2014 06:58 PM
Risk Management Procedure - Please review Koivisto - 2009 AS9100, Nadcap and related Aerospace Standards and Requirements 8 22nd December 2013 05:43 AM
Risk Management - Planning Stage (AS9100C Section 7.1.2(d)) Eloy Gomez AS9100, Nadcap and related Aerospace Standards and Requirements 1 8th June 2012 01:40 PM
Risk Management Procedure Mandatory in ISO 13485 Tiffany ISO 13485 and ISO 14969 - Medical Devices - Quality Management Systems 21 28th December 2010 02:13 AM
Risk Management (ISO 31000) and AS9100C - Gap Analysis Template Needed kim bennett guinn ISO 31000 - Risk Management Principles and Generic Guidelines 2 11th November 2010 01:09 AM



The time now is 04:22 AM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, Olde West Chester, Ohio 45069-1929
513 341-6272
NOTE: This forum uses "cookies".