The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Design and Development - Process and Product


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 1 votes, 2.00 average. Display Modes
  #1  
Old 23rd April 2002, 10:31 AM
Fire Girl's Avatar
Fire Girl Fire Girl is offline
Inactive Registered Visitor

Registration Date: Apr 2001
Location: Orillia, Ontario, Canada
Age: 34
 
Posts: 112
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 37
Karma: 20
Fire Girl has less than 100 Karma points so far.
Lurker Design Control Issues - Toolroom says the system is too complicated

Hello

Ok. There seems to be some issues with my design control issues. My design guy in the toolroom says the system is too complicated. Perhaps that's why he wears velcro shoes....

Anyway, I need a very simple procedure to perhaps explain this better. I was pretty proud of my procedure/form. I have a form that he can follow the process along and fill in as he completes steps. I have attached it for you guys to take a look at. (Design Data Sheet). Any advice would be most appreciated.

Thanks guys!

FG
Attached Files: 1. Scan for viruses before using, 2. Please report any 'bad' files by Reporting the post it is in, 3. Use at your Own Risk.
File Type: doc design data sheet.doc (28.0 KB, 718 views)
Reply With Quote

Sponsored Links
  #2  
Old 23rd April 2002, 01:08 PM
barb butrym barb butrym is offline
Courtesy Access

Registration Date: Dec 1998
Location: South Central Massachusetts
 
Posts: 788
Thanks Given to Others: 0
Thanked 15 Times in 12 Posts
Karma Power: 63
Karma: 151
barb butrym is appreciated, and has over 100 Karma points.barb butrym is appreciated, and has over 100 Karma points.
Default

who does design control? What does he do it now ? How does HE want to meet the requirement? Does he know and understand the requirement for evidence? Does he understand verification and validation? The procedure and form should reflect his thoughts, not yours. I personally like the form, but leads me to many questions on the V&V stuff.

Does he think it ties his hands...I would guess yes. How about a basic MS project chart template he can change?
Reply With Quote
Sponsored Links

  #3  
Old 24th April 2002, 09:03 AM
Fire Girl's Avatar
Fire Girl Fire Girl is offline
Inactive Registered Visitor

Registration Date: Apr 2001
Location: Orillia, Ontario, Canada
Age: 34
 
Posts: 112
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 37
Karma: 20
Fire Girl has less than 100 Karma points so far.
Screw Perhaps I'm just screwed...

Barb

The procedure is his! I am huge on letting the employees draft their own procedures and I always have them review them before I issues them. He has approved this. There is a flow chart (I have attached it to this message) for his operations manual. It's starting to look more and more like he is lazy and stupid. Bad combination. I kind of think he just doesn't understand it. Although, he says that he does. There are some underlying employee issues here too but I won't go into those.

Thanks BArb!!

FG
Attached Files: 1. Scan for viruses before using, 2. Please report any 'bad' files by Reporting the post it is in, 3. Use at your Own Risk.
File Type: doc design control flow chart.doc (23.5 KB, 1003 views)
Reply With Quote
  #4  
Old 25th April 2002, 09:36 AM
barb butrym barb butrym is offline
Courtesy Access

Registration Date: Dec 1998
Location: South Central Massachusetts
 
Posts: 788
Thanks Given to Others: 0
Thanked 15 Times in 12 Posts
Karma Power: 63
Karma: 151
barb butrym is appreciated, and has over 100 Karma points.barb butrym is appreciated, and has over 100 Karma points.
Default design engineers....urrrrrrgh

design, for me, is one of the toughest nuts to crack...not because of the requirements, but because of the nature of the beast. Engineers are "mathematical, creative and visual" people to various degrees and to a fault...by nature...thats what makes them good at what they do......and what works here today may not tomorrow. This is by no means a hit on engineers........ Just my opinion looking in. SO that in mind...how can we help? Well as I said my favorite is a project management tool template with all the shalls required and the extras as optional...it keeps them in control, but lets them be creative. Their understanding of teh standard is probably not the same as yours...it never is....the key is to somehow get buy in by making it a tool that helps them.......
Reply With Quote
  #5  
Old 25th April 2002, 03:32 PM
Fire Girl's Avatar
Fire Girl Fire Girl is offline
Inactive Registered Visitor

Registration Date: Apr 2001
Location: Orillia, Ontario, Canada
Age: 34
 
Posts: 112
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 37
Karma: 20
Fire Girl has less than 100 Karma points so far.
Question

Hi

Project Management Tool huh? Do you use something like that in your workplace? If so I would like to see sample please. Is it kind of like my Design Data Sheet that I attached a few messages up? That tells them what they need to do and then sign off and date when the step is copmplete. They are expected to attach copies of meeting minutes, drawings etc as evidence all these things really did happen. I don't know how to make this any easier.

Engineers got nothin' on toolmakers!!!!

FG
Reply With Quote
  #6  
Old 25th April 2002, 09:44 PM
barb butrym barb butrym is offline
Courtesy Access

Registration Date: Dec 1998
Location: South Central Massachusetts
 
Posts: 788
Thanks Given to Others: 0
Thanked 15 Times in 12 Posts
Karma Power: 63
Karma: 151
barb butrym is appreciated, and has over 100 Karma points.barb butrym is appreciated, and has over 100 Karma points.
Default you are right

toolmakers.......hmmmm forgot about them, they fit the same mold, I agree

I use MS Project. I am a consultant so i don't have one that is mine...I helped to develop many..... but usually let the engineer do it (it helps the buy in!!!!!) i will look around my archieves for a draft. Basically We take a completed complex design and work backward....listing what was required, what one would expect to see in the file as a minimum and a wish list. The chief project engineer takes the template and adds or deletes steps as he plans the design, he puts in the details, milestones etc as it applies to each design....and assigns responsibility...once the task is completed on the chart, the record is placed in the file. Updates to the plan are automatically tracked and visable on the network. Each project is a notebook and the table of contents is updated with each entry into the folders. Each company has its own set of criteria and review requirements based on product complexity....so I never bothered to keep one.
Reply With Quote
  #7  
Old 25th April 2002, 10:59 PM
David Mullins's Avatar
David Mullins David Mullins is offline
Aussie Bloke

Registration Date: Nov 1999
Location: Adelaide, South Australia, Australia
Age: 47
 
Posts: 495
Thanks Given to Others: 0
Thanked 13 Times in 8 Posts
Karma Power: 51
Karma: 84
David Mullins has less than 100 Karma points so far.
Default horses for courses?

FG,
Do you need to have design development requirements which are scaled to the size of the job?
You don't have to apply all the design control requirements of a $25 million job to a $100 job.

I'll email you some procedures and a form that might give you some ideas - unfortunately I haven't got one that'll fly for you straight of the bat.

PS - that flow chart...was...(how do I say ugly in a nice way?)...um...perhaps needs to be better customised to the needs of the user.
__________________
Aussie Bloke
Reply With Quote
  #8  
Old 26th April 2002, 09:59 AM
barb butrym barb butrym is offline
Courtesy Access

Registration Date: Dec 1998
Location: South Central Massachusetts
 
Posts: 788
Thanks Given to Others: 0
Thanked 15 Times in 12 Posts
Karma Power: 63
Karma: 151
barb butrym is appreciated, and has over 100 Karma points.barb butrym is appreciated, and has over 100 Karma points.
Default flow chart

I agree its quite lean, but is presented with a detailed procedure...so it appears to be an overview/summary to show the shalls are covered.....Or that is what i read into it....LOL

I just had a brain storm........perhaps that is where all the discussion of flow charts not being allowed as procedures comes from......????????????
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Design and Development - Process and Product

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Creating a system to capture Quality related issues for design department sushant Design and Development - Process and Product 10 9th June 2008 02:13 PM
Control Of Documents - Document Control System Design Critique Wanted - TS16949 mazura Documentation Control Systems, Procedures, Forms and Templates 12 28th July 2006 10:44 AM
Design Laboratory Notebook Procedure in your design control or quality system? sardonyx Design and Development - Process and Product 3 3rd August 2005 02:43 PM
Standards of how quickly to design a quality control system? amroeg Design and Development - Process and Product 3 26th May 2005 10:51 AM
Design and Development: 7.1.4 - Change Control - What is a good change control system TownDawg Design and Development - Process and Product 6 10th January 2005 05:04 PM



The time now is 12:38 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts