Elsmar Cove Forum Sidebar
|
|
|
|
Monitor the Elsmar Forum
|
| Monitor New Forum Posts
|
|
Follow Marc & Elsmar
|
|
|
Elsmar Cove Groups
|
|
|
Sponsor Links
|
|
|
|
|
|
Donate and $ Contributor Forum Access
|
 |
|
Sponsored Links
|
|
|
|
Courtesy Quick Links
|
 Links that Elsmar Cove visitors will find useful in your quest for knowledge:
Howard's International Quality Services
Atul's Symphony Technologies
Marcelo Antunes' SQR Consulting
Bob Doering's Correct SPC - Precision Machining
NIST's Engineering Statistics Handbook
IRCA - International Register of Certified Auditors
SAE - Society of Automotive Engineers
Quality Digest Portal
IEST - Institute of Environmental Sciences and Technology
ASQ - American Society for Quality
|
|
 |
|

28th February 2011, 11:12 AM
|
|
Shy Poster (1 to 5 Posts)
Registration Date: Oct 2010
Location: Rhode Island
|
|
Posts: 3
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 11 Karma: 10 
|
|
Does C = 0 have a expanded twist for problem vendors (suppliers)?
My company currently uses a C = 0 Sampling Plan. However because of the reduced sampling plan it isn't working for problem vendors. Is there some kind of expanded version of C = 0 that can be used? I used to use the standard ANSI sampling plan using reduced, normal and expanded charts.
Can anyone offer any guidance??
Thanks,
Tammy
|

28th February 2011, 11:30 AM
|
|
Involved in Discussions
Registration Date: May 2010
Location: Ann Arbor Michigan
|
|
Posts: 87
Thanks Given to Others: 23
Thanked 37 Times in 29 Posts
Karma Power: 21
|
|
|
Re: Does C = 0 have a expanded twist for problem vendors
We use a one colum shift to the left if we start experiencing supplier issues.
|

28th February 2011, 11:48 AM
|
 |
Statistician
Registration Date: May 2005
Location: New Jersey
Age: 48
|
|
Posts: 932
Thanks Given to Others: 206
Thanked 328 Times in 230 Posts
Karma Power: 134
|
|
|
Re: Does C = 0 have a expanded twist for problem vendors
Increasing the sample size will reduce the AQL and LTPD levels. But that does not solve the problem. If a vendor consistently fails the current sampling plans, any increase in scrutiny will only increase the number of lots rejected. Need to improve the quality coming in from the vendor.
__________________
Steven Walfish
When in doubt, ask your company statistician!
|
|
Thank You to Statistical Steven for your informative Post and/or Attachment!
|
|

28th February 2011, 04:15 PM
|
 |
Heretical Statistician
Registration Date: Jan 2003
Location: New England
|
|
Posts: 2,532
Thanks Given to Others: 991
Thanked 1,661 Times in 1,014 Posts
Karma Power: 320
|
|
|
Re: Does C = 0 have a expanded twist for problem vendors (suppliers)?
The straight forward answer to your question is to simply go to a 'tightened' sample plan and the sample size that allows a c=0 accept number (If you are comfortabel with ANSI plans)
However, there are a lot of other approaches out there, so it might be helpful if you told us a bit more about your situation.
What type of 'problem' are you expereincing with your problem suppliers? high rejection rate at incoming? low rejection rate at incoming but high fallout in manufacturing?
Also remember that the AQL is the rate at which 95% of the lots will b accepted. The LTPD is the rate at which 90% of the lots will be rejected. Often people misinterpret the AQL...
__________________
Statistics without physics is gambling; Physics without statistics is psychics
|
|
Thanks to Bev D for your informative Post and/or Attachment!
|
|

28th February 2011, 08:08 PM
|
 |
Registered Visitor
Registration Date: Jun 2006
Location: Nunya bizness
|
|
Posts: 79
Thanks Given to Others: 11
Thanked 26 Times in 19 Posts
Karma Power: 37
|
|
|
Re: Does C = 0 have a expanded twist for problem vendors (suppliers)?
It's obvious that the sampling plan alone cannot ensure that incoming lots are accepted at your facility (i.e., cannot inspect quality into a product). For example, these same lots are often sorted at the vendor site before shipment if found to violate the c=0 sampling plan to identify nonconforming items and ensure that the shipped lot is in compliance with customer requirements. Therefore, ensure that your vendor partner is measuring these critical attributes the same way they are measured at your site. Also, ensure that these specifications are well defined and understood at the vendor site. As Statistical Steven indicated, the failure of the sampling plan may be a symptom and the root cause for these failures needs to be identified. My experience is that measurement systems analysis (MSA) is one issue that often needs to be addressed so that lots released by the vendor are measured the same way as they are evaluated at the customer site.
|

1st March 2011, 09:14 AM
|
 |
People: The Vital Few
Registration Date: Dec 2006
Location: Fort Wayne, IN
|
|
Posts: 785
Thanks Given to Others: 108
Thanked 425 Times in 289 Posts
Karma Power: 112
|
|
|
Re: Does C = 0 have a expanded twist for problem vendors (suppliers)?
Quote:
In Reply to Parent Post by RI_Tammy
My company currently uses a C = 0 Sampling Plan. However because of the reduced sampling plan it isn't working for problem vendors. Is there some kind of expanded version of C = 0 that can be used? I used to use the standard ANSI sampling plan using reduced, normal and expanded charts.
Can anyone offer any guidance??
Thanks,
Tammy
|
Let me ask you this: Why would you keep accepting "NG" product? (You are expecting zero defects, right?)
This supplier needs supplier development support, containment actions in place, a visit from your Supplier Quality group or Purchasing, a corrective action request.
More inspection does not solve the problem.
__________________
Kees de Wit
Auditor/Consultant
People: The vital few
|

18th March 2011, 10:16 AM
|
|
Shy Poster (1 to 5 Posts)
Registration Date: Oct 2010
Location: Rhode Island
|
|
Posts: 3
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 11 Karma: 10 
|
|
|
Re: Does C = 0 have a expanded twist for problem vendors (suppliers)?
We generally have no problems. There are some instances where a product has passed inspection at C = 0 sampling rates yet non conformances have been found down the line. Of course CAPAs were originated and implemented. But when this instance occurs once I would want the next incoming inspection to be more stringent than the standard sampling rate of C = 0 to look at I larger sampling rate. My question is how to write this in to the procedure. Maybe if a non conformance occurs a shift two columns to the left will be implemented for the next run or two. Also is the C = 0 sampling plan a good plan to use for validations and auditing? What level would you use for that - 1.0??
|

18th March 2011, 10:44 AM
|
 |
Involved in Discussions
Registration Date: Jun 2009
Location: Sterling Heights, MI
|
|
Posts: 268
Thanks Given to Others: 147
Thanked 163 Times in 114 Posts
Karma Power: 44
|
|
|
Re: Does C = 0 have a expanded twist for problem vendors (suppliers)?
Hi, RI Tammy!
I agree with Kales and related comments that direct effort at the supplier's facility may yield immediate results in the reduction of the probability of them shipping non-conforming product to you.
If the non-conformity causes disruption downstream, then consideration of sampling by variables could detect shifts within the supplier process or they could sample themselves and send the results with each shipment.
With either Attribute or Variable sampling plans the plan to draw as random a sample as possible is paramount though I have rarely seen that assumption carried out in actual practice.
The concept of switching 1 or 2 columns to the left on the C=0 plans makes perfect sense. Switching rules were deliberately omitted by Squeglia; from N. Squeglia, 3rd ed. C=0 page 16 "Considerable thought was given to 'tightened' and 'reduced' inspection...different operating characteristic curves are involved...Tightened inspection was viewed as a means to force corrective action by increasing the chance of lot rejection."
So, to modify your procedures for a leftward switch for 'x' number of lots should work and a switch of 1 column left for standard characteristics and 2 for significant characteristics may be practical.
__________________
"Try not to become a man of success but rather to become a man of value." Albert Einstein
|
Lower Navigation Bar
|
|
|
Do you find this discussion thread helpful and informational?
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Forum Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|