The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > Other ISO and International Standards and European Regulations


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 1 votes, 4.00 average. Display Modes
  #1  
Old 12th June 2002, 03:44 PM
Jim Biz's Avatar
Jim Biz Jim Biz is offline
Forum Moderator

Registration Date: Mar 2000
Location: MID-WEST USA
 
Posts: 486
Thanks Given to Others: 0
Thanked 4 Times in 3 Posts
Karma Power: 51
Karma: 114
Jim Biz is appreciated, and has over 100 Karma points.Jim Biz is appreciated, and has over 100 Karma points.
Default Quality Plan Details??

I'm building on ISO2000 5.4
Quality Planning

AND have found a number of differing opinions on what is & what isn't contained in a (per se) "Quality Plan".

Typicals are
Process Map
Control Plan
Dimensional Layout
Capability Reports for Criticals
Materials certifications
ETC. ETC.

After searching here I didn't really find a clear definition of an acceptable set of inputs.... (maybe its just the keywords I'm using ???


Anyway if anyone has a list?? or clear set of details as-to what they consider an acceptable quality plan please let me know .....

Thanks in advance

Jim
__________________
Regards
Jim

"Chance is a word void of sense; nothing can exist without a cause."
Voltaire
Reply With Quote
Thank You to Jim Biz for your informative Post and/or Attachment!

Sponsored Links
  #2  
Old 12th June 2002, 04:14 PM
HFowler's Avatar
HFowler HFowler is offline
Involved - Posts

Registration Date: Aug 2001
Location: Rutherfordton, NC
 
Posts: 131
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 36
Karma: 15
HFowler has less than 100 Karma points so far.
Jim,

I've been questioning the same thing. Last week I purchased a copy of ISO 10005:1995 Quality Management - Guidelines for Quality Plans. It's almost a mirror image of ISO 9001:1994. Except for a couple of charts in the back, I didn't find it helpful at all.

I can share a little of what I've learned in my quest so far.

"A Quality Plan is a document specifying the quality management system elements and the resources to be applied in a specific case".

Activities to be considered are:
* Product specifications, quantity and delivery requirements,
* How the product/service is created and resources required,
* How the product/service is going to be verified,
* The criteria against which the verification is to be assessed,
* What records will be kept to demonstrate conformity.

I'm very interested in seeing additional comments on this topic.

Hank
__________________
Insanity - believing results can be changed without changing the processes that create them.
Reply With Quote
Thanks to HFowler for your informative Post and/or Attachment!
Sponsored Links

  #3  
Old 12th June 2002, 04:51 PM
energy
Unregistered Guest

 
Posts: n/a
Hehehe... Not the greatest

This is similar to what I'm going to use. This one reflects the 1994 version, but I intend to upgrade it to ISO9001:2000. This was uploaded to Marc's member files, but here it is again. It doesn't refer to inputs and outputs (Process map) as it is a standard flow chart. Maybe there is something you can use from it. I'm not going to get too anal with the Quality Plan because we will have procedures where we need them and training to cover the rest. It can make you crazy.
Attached Files: 1. Scan for viruses before using, 2. Please report any 'bad' files by Reporting the post it is in, 3. Use at your Own Risk.
File Type: pdf qap-fc-202-01.pdf (393.8 KB, 1163 views)
Reply With Quote
  #4  
Old 12th June 2002, 06:53 PM
JodiB's Avatar
JodiB JodiB is offline
Still plugging along

Registration Date: Nov 2001
Location: Texas
 
Posts: 502
Thanks Given to Others: 4
Thanked 9 Times in 7 Posts
Karma Power: 44
JodiB has disabled his/her Karma.
Default

We do a Project Quality Plan (PQP) for every job and they cover those items that Hank listed.

We don't have any other QPs that I know of.
Reply With Quote
  #5  
Old 12th June 2002, 09:26 PM
energy
Unregistered Guest

 
Posts: n/a
Default We call it........

Quote:
Lucinda said:

We do a Project Quality Plan (PQP) for every job and they cover those items that Hank listed.

We don't have any other QPs that I know of.
Every job? That's Product Realization. Your Qual Plan should be created 10,000 ft above your business and cover all processes, in general. Particularly if you have multiple divisions or Business Units. The Auditor has a road map of your business and can proceed with his audit, rather than be shown 200/300 Qual Plans for every job that comes down the pike. Contract review, old version, was not a Qual Plan then, either. I worked at a place that called their Process Traveler their Qual Plan. Customers didn't seem to have a problem with it. Whatever floats your boat. .
Reply With Quote
  #6  
Old 13th June 2002, 09:13 AM
HFowler's Avatar
HFowler HFowler is offline
Involved - Posts

Registration Date: Aug 2001
Location: Rutherfordton, NC
 
Posts: 131
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 36
Karma: 15
HFowler has less than 100 Karma points so far.
energy,

I think your QP is excellent. You have so many QAPs. What about companies that aren't so document intensive. We have only the procedures required by ISO 9001:2000, several documented processes and and a few work instructions.

We are looking at developing Quality Plans when we get a Request for Quote. We build custom systems of computer hardware and software. My thoughts are to provide evidence that we have thoroughly reviewed the customers requirements and have a plan for how the product will be developed and produced with stages and methods identified for verification, etc.

If a company was starting from scratch, would you have any advise in this regard?

Best Regards,
Hank Fowler
__________________
Insanity - believing results can be changed without changing the processes that create them.
Reply With Quote
  #7  
Old 13th June 2002, 09:36 AM
energy
Unregistered Guest

 
Posts: n/a
Hehehe... We're like you, kind of

Quote:
HFowler said:

energy,

I think your QP is excellent. You have so many QAPs. What about companies that aren't so document intensive. We have only the procedures required by ISO 9001:2000, several documented processes and and a few work instructions.

We are looking at developing Quality Plans when we get a Request for Quote. We build custom systems of computer hardware and software. My thoughts are to provide evidence that we have thoroughly reviewed the customers requirements and have a plan for how the product will be developed and produced with stages and methods identified for verification, etc.

If a company was starting from scratch, would you have any advise in this regard?

Best Regards,
Hank Fowler
Hank,

Those QAP's are what I intended to have. With the new standard's mandated 6 QAP's, those references would dwindle to as few as I can get away with. Good job training, skills requirements, OJT are another avenue to use to avoid becoming procedure choked.
You need to map out your quote process from inception to completion, in general. The common steps you do for all your projects. As Lucinda has stated, she calls each job steps a Qual Plan. I guess if I were asked a question about Quality Planning, I could explain the we do a new Qual Plan for each job. Or, if I were doing a plan for each job, I could answer, "Sure we have Qual Plans. Which would you like to see? Yesterday's, today's or tomorrow's?
And, we are starting from scratch, just like you. I just sling more s***!

Last edited by energy; 13th June 2002 at 09:38 AM.
Reply With Quote
  #8  
Old 13th June 2002, 01:43 PM
JodiB's Avatar
JodiB JodiB is offline
Still plugging along

Registration Date: Nov 2001
Location: Texas
 
Posts: 502
Thanks Given to Others: 4
Thanked 9 Times in 7 Posts
Karma Power: 44
JodiB has disabled his/her Karma.
Default

Energy, I think you may misunderstand what I'm calling a project quality plan . It is a document that outlines what job we are doing for the customer (such as a pipeline inspection or suction pile setting or survey equipment laying, or cable burial, etc.- but in much greater detail than these titles of course), what equipment will be needed, what personnel will be used, what reporting will be provided, what job procedures are to be followed (we have to write job specific procedures for some jobs for installation, etc.), who the various levels of contacts are for the project on customer's side as well as ours (for establishing authorities and responsibilities), and other details for the project. It is a written document, not a flowchart. And yes, this is used for the product realization phase - although created by the planning team - and it is done for every job. An exception to this "every" rule is what is called a "fly by" where we do a short job for someone on the way to another client's job. Typcially it is done as a last-minute thing just because we happen to be in the area.

I've looked at your Quality Plan and I can see that your document is for a different purpose. It looks like it is showing which procedures apply to each stage of your business flow. It is very nice. I tried at one time to do that sort of thing but my boss said to scrap it because we don't have a single thread of tasks. Everything just ends up in a wadded mess with arrows going here there and everywhere.
Reply With Quote
Thanks to JodiB for your informative Post and/or Attachment!
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > Other ISO and International Standards and European Regulations

Bookmarks

Tags
quality plan


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Renault Quality plan - Quality Plan in Development Phase for Renault customer AntPer Design and Development - Process and Product 3 10th November 2009 07:41 AM
Linking Quality Plan Objectives to the Business Plan? Buford ISO/TS 16949 - International Automotive Quality Systems Standard 7 28th January 2008 10:02 PM
Differences between quality plan and control plan in TS 16949:2002 lokeky1 FMEA and Control Plans 1 18th March 2006 01:59 AM
FDA Quality Plan - What kind of quality plan is required for FDA QSR? Quality Queen ISO 13485 - Medical Devices - Quality Management Systems 2 11th January 2006 02:01 PM
What are the main differences between the Control Plan and the Quality Plan? Sanda ISO/TS 16949 - International Automotive Quality Systems Standard 2 18th November 2005 10:28 AM



The time now is 09:40 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts