The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 25th June 2002, 04:50 AM
AllenLee
Unregistered Guest

 
Posts: n/a
Question Cpk for Individual Chart

I try to use Individual & MR chart to control our test yield. We tested all of the units and then calculate the yield lost for each lot. But the lot size is different.

So, how can i calculate Cpk?

Thanks for your help!!!
Reply With Quote

Sponsored Links
  #2  
Old 25th June 2002, 12:43 PM
Darius's Avatar
Darius Darius is offline
Courtesy Access

Registration Date: Mar 2002
Location: Monterrey Mexico
Age: 47
 
Posts: 338
Thanks Given to Others: 21
Thanked 84 Times in 59 Posts
Karma Power: 65
Karma: 1399
Darius is appreciated, and has over 1300 Karma points.Darius is appreciated, and has over 1300 Karma points.Darius is appreciated, and has over 1300 Karma points.Darius is appreciated, and has over 1300 Karma points.Darius is appreciated, and has over 1300 Karma points.Darius is appreciated, and has over 1300 Karma points.Darius is appreciated, and has over 1300 Karma points.Darius is appreciated, and has over 1300 Karma points.Darius is appreciated, and has over 1300 Karma points.Darius is appreciated, and has over 1300 Karma points.
Default

The capability index doesn´t depend on the lot size, of course the estimates of mean and standard deviation could be better when more data is added to the study but the calculus is just the same.

I tink your cuestion is about the confidence of the index calculus.

http://www.qualitydigest.com/may00/html/lastword.html

and the calculus of the index is just the same as with subgrouped data.

Cpk is the minimum of (USL- Mean, Mean - LSL)/(3 sigma)

Where sigma in individual control charts is calculated

Sigma = sum(MR)/(lot_size - 1) /1.128

that is the same sigma used to calculate the control limits

http://www.qualitymag.com/articles/jan98/0198wh.html

The problem that I found is that when there is autocorrelation is the data, you have to add the autocorrelation factor to the Sigma (multiply by the factor), this happends most frecuently when there is automatic data sampling or in batch processing.

I hope this may help.

Reply With Quote
Sponsored Links

Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Individual/Moving Range Chart (IMR Chart) in Excel amroczek Excel .xls Spreadsheet Templates and Tools 4 23rd September 2009 02:13 PM
Individual & MR chart - Ppk or Cpk? pagnonig Capability, Accuracy and Stability - Process, Machine, etc. 9 20th November 2008 08:34 PM
Introducing individual chart to accountants D.Salman SPC Monitoring and Statistical Analysis Techniques 22 28th January 2008 05:38 PM
What is the minimum number of values to develop individual chart? D.Salman SPC Monitoring and Statistical Analysis Techniques 14 23rd November 2006 04:40 AM
Individual or Moving Range Chart? Parts run in lots of 7 with 4 key wall thicknesses MikeG SPC Monitoring and Statistical Analysis Techniques 5 24th October 2005 10:04 AM



The time now is 05:31 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts