The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 23rd July 2002, 07:27 AM
Stuart Andrews's Avatar
Stuart Andrews Stuart Andrews is offline
Involved - Posts

Registration Date: Sep 2000
Location: Denbigh, Wales, "Great" Britain.
Age: 36
 
Posts: 44
Thanks Given to Others: 6
Thanked 0 Times in 0 Posts
Karma Power: 38
Karma: 20
Stuart Andrews has less than 100 Karma points so far.
Question Changing Inspection Frequency on the Control Plan

During a recent surveillance audit, our auditor gave us a minor nonconformance because I stated on our control plan that we performed an "hourly" SPC check for certain dimensions. Unfortunately, because of work load and only having 1 SPC measuring station and five machines, the SPC checks were being done slightly over 1 hour. This meant that eventually one hourly check may be missed eg 6 hourly checks performed in 7 hours.

Now I don't want to change the wording on the control plan because I'll have to notify my customers of a change in inspection frequency. So where do I stand on this issue.

Any thoughts peeps!?!
__________________
With is a stupid word to end a sentence with.

Never say Never.
Reply With Quote

Sponsored Links
  #2  
Old 23rd July 2002, 07:58 AM
M Greenaway's Avatar
M Greenaway M Greenaway is offline
Courtesy Access

Registration Date: Dec 2001
Location: England
 
Posts: 1,643
Thanks Given to Others: 10
Thanked 63 Times in 44 Posts
Karma Power: 80
Karma: 794
M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.
Default

You could define in your quality manual that an 'hour' is a period of duration of 120 minutes ! tee hee

Seriously you can either get the necessary resource to fulfill your intent for hourly SPC checks, or try to redefine your time period. COuld you get away with saying it means an hour of production time and not an hour of real time ?
Reply With Quote
Sponsored Links

  #3  
Old 23rd July 2002, 08:13 AM
Stuart Andrews's Avatar
Stuart Andrews Stuart Andrews is offline
Involved - Posts

Registration Date: Sep 2000
Location: Denbigh, Wales, "Great" Britain.
Age: 36
 
Posts: 44
Thanks Given to Others: 6
Thanked 0 Times in 0 Posts
Karma Power: 38
Karma: 20
Stuart Andrews has less than 100 Karma points so far.
Default

At the moment we don't have the funding to cover the resource issue. But sometimes we'll meet the hour frequency and sometimes we won't eg if the operator is busy changing over a machine.

At what point does an hourly check not become an hourly check. If we did a check at 1 hour 5 mins I would imagine that would be acceptable. What about 1h 10m? Or 1 h 20m?

Any further thoughts?
__________________
With is a stupid word to end a sentence with.

Never say Never.
Reply With Quote
  #4  
Old 23rd July 2002, 08:27 AM
M Greenaway's Avatar
M Greenaway M Greenaway is offline
Courtesy Access

Registration Date: Dec 2001
Location: England
 
Posts: 1,643
Thanks Given to Others: 10
Thanked 63 Times in 44 Posts
Karma Power: 80
Karma: 794
M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.
Default

Could the machines stop after one hours production to await the SPC checks ?

Just thinking your hourly check could mean 'an hours worth of production' and you wont produce any more until the SPC is done.
Reply With Quote
  #5  
Old 23rd July 2002, 08:34 AM
Stuart Andrews's Avatar
Stuart Andrews Stuart Andrews is offline
Involved - Posts

Registration Date: Sep 2000
Location: Denbigh, Wales, "Great" Britain.
Age: 36
 
Posts: 44
Thanks Given to Others: 6
Thanked 0 Times in 0 Posts
Karma Power: 38
Karma: 20
Stuart Andrews has less than 100 Karma points so far.
Default

I wouldn't really want to stop the machines, it isn't critical that the checks are performed on the dot. What do other people do when their SPC checks aren't carried out in the allotted time? I can't imagine people would stop their production unless it was critical for them to do so.

FYI It isn't critical, as such, because we manufacture such high volumes and the process is so stable. The checks would be performed every hour if we didn't have a resource issue.
__________________
With is a stupid word to end a sentence with.

Never say Never.
Reply With Quote
  #6  
Old 23rd July 2002, 08:40 AM
M Greenaway's Avatar
M Greenaway M Greenaway is offline
Courtesy Access

Registration Date: Dec 2001
Location: England
 
Posts: 1,643
Thanks Given to Others: 10
Thanked 63 Times in 44 Posts
Karma Power: 80
Karma: 794
M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.
Default

Stuart

If it isnt critical, and the process is very stable why not wind out the frequency of checks, or do away with them altogether ?

Our SPC is done on production count, and is therefore not time dependant - could you change yours to being based on production count ?
Reply With Quote
  #7  
Old 23rd July 2002, 09:16 AM
D.Scott's Avatar
D.Scott D.Scott is offline
Super Moderator

Registration Date: Feb 2001
Location: Wellington, OH USA
Age: 69
 
Posts: 1,604
Thanks Given to Others: 80
Thanked 289 Times in 172 Posts
Karma Power: 149
Karma: 4082
D.Scott is appreciated, and has over 1700 Karma points.
D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.
Send a message via Yahoo to D.Scott
Default

I am with Martin. If the check isn't critical and the process is so stable, cut back on the number of checks. It seems to me you are getting "busted" on the 1 hour issue rather than on not controling the process. We have a similar issue although we have not had a nonconformance because of it yet.

If you want to keep the hourly check, you will need to do as we have to - add the word "approximately". If you define the inspection frequency in your procedure as "although not critical nor mandatory, inspections should be done approximately every hour" - you have not changed the inspection interval so you won't need to notify the customer of a change in the CP. If the auditor questions the interval, you can show him the procedure defining the acceptable interval deviation.

Dave
__________________
"Time you enjoyed wasting is not wasted time"
Reply With Quote
  #8  
Old 23rd July 2002, 06:18 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Hehehe...

As an extreme (and to confuse the heck out of the auditor) - put a tolerance on your time. +/- 15 minutes or something. I'm assuming this is a QS-9000 or TS 16949 audit.

I suspect very few people (reality here) checks a clock and does the check to the minute and second.

Anal auditor?
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Control Plan vs. Inspection Plan - What exactly is the difference limeho FMEA and Control Plans 5 19th August 2009 11:11 AM
Process Control Plan and Inspection Plans - Receiving and final inspection required? krishkaar Inspection and Test, Sampling and Related Topics 8 3rd November 2004 07:46 AM
Is a Control Plan Required for Receiving Inspection? Sam Inspection and Test, Sampling and Related Topics 9 11th February 2003 09:53 AM
Determining Sample Size and Frequency for the Control Plan George Trybulski FMEA and Control Plans 4 11th June 2000 10:19 AM
Guidelines for in-process inspection of PCB repairs:Changing from end-item inspection The Fixer Inspection and Test, Sampling and Related Topics 7 29th February 2000 09:47 PM



The time now is 09:02 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts