The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Aerospace and Aviation Standards and Requirements > AS9100, Nadcap and related Aerospace Standards and Requirements
Forum Username


Elsmar Cove Forum Sidebar
Custom Search
Monitor the Elsmar Forum
Monitor New Forum Posts
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Sponsor Links







Donate and $ Contributor Forum Access
Sponsored Links
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's
International Quality Services

Atul's
Symphony Technologies

Marcelo Antunes'
SQR Consulting

Bob Doering's
Correct SPC - Precision Machining


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


Related Topic Tags
7.1.1 - project management (as9100), 7.1.3 - configuration management (as9100), as9100 - aerospace quality management systems, small companies (small businesses)
Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 1 votes, 5.00 average. Display Modes
  #1  
Old 2nd September 2011, 01:28 PM
dsanabria dsanabria is offline
Appreciated Member

 
Registration Date: Oct 2007
Location: United States, connecticut
 
Posts: 526
Thanks Given to Others: 130
Thanked 217 Times in 144 Posts
Karma Power: 78
Karma: 1828
dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.
Please Help! Exclusion of AS9100C Clause 7.1.1 and Clause 7.1.3 for a Small Shop

We just had our upgrade to AS9100 Rev C and the auditors told us that because we are a small shop (12 individuals) and all we do is cut large pieces to small shape (per print) that we could invoke the exclusion requirements of 7.1.1 Project Management and 7.1.3 Configuration Management.

Just wanted to know if any small shops have a different take on this requirements.

Sponsored Links
  #2  
Old 2nd September 2011, 01:52 PM
DannyK DannyK is offline
Appreciated Information Resource

 
Registration Date: Jul 2003
Location: CANADA
 
Posts: 549
Thanks Given to Others: 60
Thanked 227 Times in 171 Posts
Karma Power: 100
Karma: 3296
DannyK is appreciated, and has over 1700 Karma points.
DannyK is appreciated, and has over 1700 Karma points.DannyK is appreciated, and has over 1700 Karma points.DannyK is appreciated, and has over 1700 Karma points.
Re: Exclusion of AS9100C 7.1.1 and 71.3 for a small shop

Quote:
In Reply to Parent Post by dsanabria View Post

We just had our upgrade to AS9100 Rev C and the auditors told us that because we are a small shop (12 individuals) and all we do is cut large pieces to small shape (per print) that we could invoke the exclusion requirements of 7.1.1 Project Management and 7.1.3 Configuration Management.

Just wanted to know if any small shops have a different take on this requirements.
I totally disagree with excluding Project Management & Configuration Management.
When the small shop gets an order, isn't there any configuration information provided?
Does anyone in the shop plan the production to ensure that the required resources are available and the schedule is being met?
Sponsored Links

  #3  
Old 2nd September 2011, 02:35 PM
Sidney Vianna's Avatar
Sidney Vianna Sidney Vianna is offline
Post Responsibly

 
Registration Date: Oct 2001
Location: Long Beach, CA - USofA
 
Posts: 7,691
Thanks Given to Others: 1,590
Thanked 4,622 Times in 2,425 Posts
Karma Power: 879
Karma: 31536
Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.
Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.
Re: Exclusion of AS9100C 7.1.1 and 7.1.3 for a small shop

Quote:
In Reply to Parent Post by dsanabria View Post

We just had our upgrade to AS9100 Rev C and the auditors told us that because we are a small shop (12 individuals) and all we do is cut large pieces to small shape (per print) that we could invoke the exclusion requirements of 7.1.1 Project Management and 7.1.3 Configuration Management.

Just wanted to know if any small shops have a different take on this requirements.
Personally, I do agree with the exclusions in that scenario. However, the "authors" of AS9100 seem to think that PM and CM must apply to ALL AS&D organizations, irrespective of size, product, etc... At least, that is what I conclude after reading the IAQG 9100 Change & Rationale document, which stipulates:
Quote:
Project management is an important new topic introduced at this update- important because every type and size of organization carries out ‘project management’ in some form or other. Project management is included in clause 7.1 because its requirements apply to all phases of the lifecycle
and
Quote:
Configuration management is included now in clause 7.1 because its requirements apply to all phases of the lifecycle of products realization and use
I have repeatedly voiced my request for guidance on the scalability of PM, RM & CM for AS9100/9110 users that fit the Small & Medium size category. So far, nobody has listened.

It will be interesting to see if your CB will be able to identify PM and CM as non-applicable when they are entering the organization's data into OASIS.
__________________
Sustainable conformity assessment must add value to all stakeholders
Thank You to Sidney Vianna for your informative Post and/or Attachment!
  #4  
Old 2nd September 2011, 02:37 PM
Sidney Vianna's Avatar
Sidney Vianna Sidney Vianna is offline
Post Responsibly

 
Registration Date: Oct 2001
Location: Long Beach, CA - USofA
 
Posts: 7,691
Thanks Given to Others: 1,590
Thanked 4,622 Times in 2,425 Posts
Karma Power: 879
Karma: 31536
Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.
Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.
Re: Exclusion of AS9100C 7.1.1 and 71.3 for a small shop

Quote:
In Reply to Parent Post by DannyK View Post

Does anyone in the shop plan the production to ensure that the required resources are available and the schedule is being met?
Wouldn't an ISO 9001-compliant machine shop have to do that, as well? ISO 9001 has no requirements for CM nor PM.
__________________
Sustainable conformity assessment must add value to all stakeholders
  #5  
Old 2nd September 2011, 03:39 PM
dsanabria dsanabria is offline
Appreciated Member

 
Registration Date: Oct 2007
Location: United States, connecticut
 
Posts: 526
Thanks Given to Others: 130
Thanked 217 Times in 144 Posts
Karma Power: 78
Karma: 1828
dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.
Re: Exclusion of AS9100C 7.1.1 and 71.3 for a small shop

Quote:
In Reply to Parent Post by DannyK View Post

I totally disagree with excluding Project Management & Configuration Management.
When the small shop gets an order, isn't there any configuration information provided?
Does anyone in the shop plan the production to ensure that the required resources are available and the schedule is being met?
Section 7.1 covers that point completely in a small shop

And I quote
"The organization shall plan and develop the processes needed for product realization. Planning of product realization shall be consistent with the requirements of the other processes of the quality management system (see 4.1).
In planning product realization, the organization shall determine the following, as appropriate:

a) quality objectives and requirements for the product;
NOTE Quality objectives and requirements for the product include

consideration of aspects such as
- product and personal safety,
- reliability, availability and maintainability,
- producibility and inspectability,
- suitability of parts and materials used in the product,
- selection and development of embedded software, and
- recycling or final disposal of the product at the end of its life.
b) the need to establish processes and documents, and to provide resources specific to the product;
c) required verification, validation, monitoring, measurement, inspection and test activities specific to the product and the criteria for product acceptance;
d) records needed to provide evidence that the realization processes and resulting product meet requirements (see 4.2.4);
e"end of Quote) configuration management appropriate to the product;

Furthermore, if you read the note on 7.1.3 - it makes a reference to ISO 10007. After reading that spec, you will realize that an exclusion is justifiable.

This is what the 3rd party was pointing out - and we are taking it.
  #6  
Old 3rd September 2011, 11:59 AM
Hodgepodge's Avatar
Hodgepodge Hodgepodge is offline
Appreciated Member

 
Registration Date: Jul 2008
Location: Phoenix, Arizona, U.S.A.
Age: 42
 
Posts: 264
Thanks Given to Others: 611
Thanked 232 Times in 139 Posts
Karma Power: 53
Karma: 3710
Hodgepodge is appreciated, and has over 1700 Karma points.
Hodgepodge is appreciated, and has over 1700 Karma points.Hodgepodge is appreciated, and has over 1700 Karma points.Hodgepodge is appreciated, and has over 1700 Karma points.Hodgepodge is appreciated, and has over 1700 Karma points.Hodgepodge is appreciated, and has over 1700 Karma points.Hodgepodge is appreciated, and has over 1700 Karma points.Hodgepodge is appreciated, and has over 1700 Karma points.
Re: Exclusion of AS9100C Clause 7.1.1 and Clause 7.1.3 for a Small Shop

Quote:
In Reply to Parent Post by dsanabria View Post

We just had our upgrade to AS9100 Rev C and the auditors told us that because we are a small shop (12 individuals) and all we do is cut large pieces to small shape (per print) that we could invoke the exclusion requirements of 7.1.1 Project Management and 7.1.3 Configuration Management.

Just wanted to know if any small shops have a different take on this requirements.
As far as configuration management goes, the small shop making items to print is using the configuration defined by the customer. The product designer is maintaining/managing the configuration and the small shop is using it.

You may say this small company is exempt from this requirement but in reality, they still care about it. If there is a B/P change to work in progress and the change is flowed down, your company will make a change to the configuration of the part. If parts in WIP have already been completed and cannot be altered to match the new configuration, you will use the customer's configuration designations to communicate any issues to the customer. The supplier is not at fault when a change is made halfway through. “Sorry, 15 pieces were already completed to Rev A, the remaining 15 can be made to the new Rev B print but the cost will be an additional $XX.XX.”

The small company in this example does not need to document the configuration management process; it will be easily understood and easy to prove. The idea of claiming exemption from the requirement seems more difficult than proving use of the customer's preexisting configuration management.
__________________
None of the secrets of success will work unless you do. - Fortune Cookie
Thanks to Hodgepodge for your informative Post and/or Attachment!
  #7  
Old 3rd September 2011, 12:20 PM
dsanabria dsanabria is offline
Appreciated Member

 
Registration Date: Oct 2007
Location: United States, connecticut
 
Posts: 526
Thanks Given to Others: 130
Thanked 217 Times in 144 Posts
Karma Power: 78
Karma: 1828
dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.
Re: Exclusion of AS9100C Clause 7.1.1 and Clause 7.1.3 for a Small Shop

Quote:
In Reply to Parent Post by Hodgepodge View Post

As far as configuration management goes, the small shop making items to print is using the configuration defined by the customer. The product designer is maintaining/managing the configuration and the small shop is using it.

You may say this small company is exempt from this requirement but in reality, they still care about it. If there is a B/P change to work in progress and the change is flowed down, your company will make a change to the configuration of the part. If parts in WIP have already been completed and cannot be altered to match the new configuration, you will use the customer's configuration designations to communicate any issues to the customer. The supplier is not at fault when a change is made halfway through. “Sorry, 15 pieces were already completed to Rev A, the remaining 15 can be made to the new Rev B print but the cost will be an additional $XX.XX.”

The small company in this example does not need to document the configuration management process; it will be easily understood and easy to prove. The idea of claiming exemption from the requirement seems more difficult than proving use of the customer's preexisting configuration management.
Agree, this is why the auditor didn't want us to ignore the configuration management in section

7.1 e) configuration management appropriate to the product.

Companies that have design and development clause:

7.3.6.1 c) the correct configuration is submitted to the test

must incorporate clause 7.1.3 and use ISO 10007 for guidance.

Thanks for the feedback
Thanks to dsanabria for your informative Post and/or Attachment!
  #8  
Old 3rd September 2011, 12:21 PM
Sidney Vianna's Avatar
Sidney Vianna Sidney Vianna is offline
Post Responsibly

 
Registration Date: Oct 2001
Location: Long Beach, CA - USofA
 
Posts: 7,691
Thanks Given to Others: 1,590
Thanked 4,622 Times in 2,425 Posts
Karma Power: 879
Karma: 31536
Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.
Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.
Re: Exclusion of AS9100C Clause 7.1.1 and Clause 7.1.3 for a Small Shop

Quote:
In Reply to Parent Post by Hodgepodge View Post

As far as configuration management goes, the small shop making items to print is using the configuration defined by the customer. The product designer is maintaining/managing the configuration and the small shop is using it.

You may say this small company is exempt from this requirement but in reality, they still care about it. If there is a B/P change to work in progress and the change is flowed down, your company will make a change to the configuration of the part. If parts in WIP have already been completed and cannot be altered to match the new configuration, you will use the customer's configuration designations to communicate any issues to the customer. The supplier is not at fault when a change is made halfway through. “Sorry, 15 pieces were already completed to Rev A, the remaining 15 can be made to the new Rev B print but the cost will be an additional $XX.XX.”

The small company in this example does not need to document the configuration management process; it will be easily understood and easy to prove. The idea of claiming exemption from the requirement seems more difficult than proving use of the customer's preexisting configuration management.
I still don't buy this. What you refer to as configuration management in , to me, is nothing more than product conformity to requirements. As I said before an ISO 9001 compliant machine shop would be required to do the same thing without having to comply with CM. Yesterday I emailed the AS9100 SDR asking for clarification on this subject since this very question about the possibility of excluding PM, RM and CM has been already asked and the answer in the 9100:2009 clarifications document is inconclusive: the first half of the answer says that the exclusions would be possible while the second half of the answer states that all organizations in the ASD sector would be expected to demonstrate some form of CM, PM & RM. . I think it is time for people offering interpretations clarifications to come off the fence.
__________________
Sustainable conformity assessment must add value to all stakeholders
Thank You to Sidney Vianna for your informative Post and/or Attachment!
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Aerospace and Aviation Standards and Requirements > AS9100, Nadcap and related Aerospace Standards and Requirements

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Different types of Design and Development - AS9100C Clause 7.3 Rockanna AS9100, Nadcap and related Aerospace Standards and Requirements 2 5th June 2011 03:50 PM
AS9100C Clause 7.4 - Supplier Delegation - Audit Nonconformance Jamien AS9100, Nadcap and related Aerospace Standards and Requirements 14 24th May 2011 03:42 PM
Personal Data as it pertains to clause 7.5.4 of AS9100C - Definition alsaidla AS9100, Nadcap and related Aerospace Standards and Requirements 3 25th February 2011 05:11 AM
AS9100B vs AS9100C - Clause 4.2.2 - Relationships between requirements Jarawho AS9100, Nadcap and related Aerospace Standards and Requirements 11 29th June 2009 02:45 PM
What would be the justification for exclusion of ISO9001 clause 7.5.1? Joy ISO 9000, ISO 9001, and ISO 9004 - Questions and Discussions 13 21st March 2006 02:33 PM



The time now is 06:20 PM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, Olde West Chester, Ohio 45069-1929
513 341-6272