Elsmar Cove Forum Sidebar
|
|
|
|
Monitor the Elsmar Forum
|
| Monitor New Forum Posts
|
|
Follow Marc & Elsmar
|
|
|
Elsmar Cove Groups
|
|
|
Sponsor Links
|
|
|
|
|
|
Donate and $ Contributor Forum Access
|
 |
|
Sponsored Links
|
|
|
|
Courtesy Quick Links
|
 Links that Elsmar Cove visitors will find useful in your quest for knowledge:
Howard's International Quality Services
Atul's Symphony Technologies
Marcelo Antunes' SQR Consulting
Bob Doering's Correct SPC - Precision Machining
NIST's Engineering Statistics Handbook
IRCA - International Register of Certified Auditors
SAE - Society of Automotive Engineers
Quality Digest Portal
IEST - Institute of Environmental Sciences and Technology
ASQ - American Society for Quality
|
|
 |
|

2nd September 2011, 01:28 PM
|
|
Appreciated Member
Registration Date: Oct 2007
Location: United States, connecticut
|
|
Posts: 526
Thanks Given to Others: 130
Thanked 217 Times in 144 Posts
Karma Power: 78
|
|
Exclusion of AS9100C Clause 7.1.1 and Clause 7.1.3 for a Small Shop
We just had our upgrade to AS9100 Rev C and the auditors told us that because we are a small shop (12 individuals) and all we do is cut large pieces to small shape (per print) that we could invoke the exclusion requirements of 7.1.1 Project Management and 7.1.3 Configuration Management.
Just wanted to know if any small shops have a different take on this requirements.
|

2nd September 2011, 01:52 PM
|
|
Appreciated Information Resource
Registration Date: Jul 2003
Location: CANADA
|
|
Posts: 549
Thanks Given to Others: 60
Thanked 227 Times in 171 Posts
Karma Power: 100
|
|
|
Re: Exclusion of AS9100C 7.1.1 and 71.3 for a small shop
Quote:
In Reply to Parent Post by dsanabria
We just had our upgrade to AS9100 Rev C and the auditors told us that because we are a small shop (12 individuals) and all we do is cut large pieces to small shape (per print) that we could invoke the exclusion requirements of 7.1.1 Project Management and 7.1.3 Configuration Management.
Just wanted to know if any small shops have a different take on this requirements.
|
I totally disagree with excluding Project Management & Configuration Management.
When the small shop gets an order, isn't there any configuration information provided?
Does anyone in the shop plan the production to ensure that the required resources are available and the schedule is being met?
|

2nd September 2011, 02:35 PM
|
 |
Post Responsibly
Registration Date: Oct 2001
Location: Long Beach, CA - USofA
|
|
Posts: 7,691
Thanks Given to Others: 1,590
Thanked 4,622 Times in 2,425 Posts
Karma Power: 879
|
|
|
Re: Exclusion of AS9100C 7.1.1 and 7.1.3 for a small shop
Quote:
In Reply to Parent Post by dsanabria
We just had our upgrade to AS9100 Rev C and the auditors told us that because we are a small shop (12 individuals) and all we do is cut large pieces to small shape (per print) that we could invoke the exclusion requirements of 7.1.1 Project Management and 7.1.3 Configuration Management.
Just wanted to know if any small shops have a different take on this requirements.
|
Personally, I do agree with the exclusions in that scenario. However, the "authors" of AS9100 seem to think that PM and CM must apply to ALL AS&D organizations, irrespective of size, product, etc... At least, that is what I conclude after reading the IAQG 9100 Change & Rationale document, which stipulates:
Quote:
|
Project management is an important new topic introduced at this update- important because every type and size of organization carries out ‘project management’ in some form or other. Project management is included in clause 7.1 because its requirements apply to all phases of the lifecycle
|
and
Quote:
|
Configuration management is included now in clause 7.1 because its requirements apply to all phases of the lifecycle of products realization and use
|
I have repeatedly voiced my request for guidance on the scalability of PM, RM & CM for AS9100/9110 users that fit the Small & Medium size category. So far, nobody has listened.
It will be interesting to see if your CB will be able to identify PM and CM as non-applicable when they are entering the organization's data into OASIS.
__________________
Sustainable conformity assessment must add value to all stakeholders
|
|
Thank You to Sidney Vianna for your informative Post and/or Attachment!
|
|

2nd September 2011, 02:37 PM
|
 |
Post Responsibly
Registration Date: Oct 2001
Location: Long Beach, CA - USofA
|
|
Posts: 7,691
Thanks Given to Others: 1,590
Thanked 4,622 Times in 2,425 Posts
Karma Power: 879
|
|
|
Re: Exclusion of AS9100C 7.1.1 and 71.3 for a small shop
Quote:
In Reply to Parent Post by DannyK
Does anyone in the shop plan the production to ensure that the required resources are available and the schedule is being met?
|
Wouldn't an ISO 9001-compliant machine shop have to do that, as well? ISO 9001 has no requirements for CM nor PM.
__________________
Sustainable conformity assessment must add value to all stakeholders
|

2nd September 2011, 03:39 PM
|
|
Appreciated Member
Registration Date: Oct 2007
Location: United States, connecticut
|
|
Posts: 526
Thanks Given to Others: 130
Thanked 217 Times in 144 Posts
Karma Power: 78
|
|
|
Re: Exclusion of AS9100C 7.1.1 and 71.3 for a small shop
Quote:
In Reply to Parent Post by DannyK
I totally disagree with excluding Project Management & Configuration Management.
When the small shop gets an order, isn't there any configuration information provided?
Does anyone in the shop plan the production to ensure that the required resources are available and the schedule is being met?
|
Section 7.1 covers that point completely in a small shop
And I quote
"The organization shall plan and develop the processes needed for product realization. Planning of product realization shall be consistent with the requirements of the other processes of the quality management system (see 4.1).
In planning product realization, the organization shall determine the following, as appropriate:
a) quality objectives and requirements for the product;
NOTE Quality objectives and requirements for the product include
consideration of aspects such as
- product and personal safety,
- reliability, availability and maintainability,
- producibility and inspectability,
- suitability of parts and materials used in the product,
- selection and development of embedded software, and
- recycling or final disposal of the product at the end of its life.
b) the need to establish processes and documents, and to provide resources specific to the product;
c) required verification, validation, monitoring, measurement, inspection and test activities specific to the product and the criteria for product acceptance;
d) records needed to provide evidence that the realization processes and resulting product meet requirements (see 4.2.4);
e"end of Quote) configuration management appropriate to the product;
Furthermore, if you read the note on 7.1.3 - it makes a reference to ISO 10007. After reading that spec, you will realize that an exclusion is justifiable.
This is what the 3rd party was pointing out - and we are taking it.
|

3rd September 2011, 11:59 AM
|
 |
Appreciated Member
Registration Date: Jul 2008
Location: Phoenix, Arizona, U.S.A.
Age: 42
|
|
Posts: 264
Thanks Given to Others: 611
Thanked 232 Times in 139 Posts
Karma Power: 53
|
|
|
Re: Exclusion of AS9100C Clause 7.1.1 and Clause 7.1.3 for a Small Shop
Quote:
In Reply to Parent Post by dsanabria
We just had our upgrade to AS9100 Rev C and the auditors told us that because we are a small shop (12 individuals) and all we do is cut large pieces to small shape (per print) that we could invoke the exclusion requirements of 7.1.1 Project Management and 7.1.3 Configuration Management.
Just wanted to know if any small shops have a different take on this requirements.
|
As far as configuration management goes, the small shop making items to print is using the configuration defined by the customer. The product designer is maintaining/managing the configuration and the small shop is using it.
You may say this small company is exempt from this requirement but in reality, they still care about it. If there is a B/P change to work in progress and the change is flowed down, your company will make a change to the configuration of the part. If parts in WIP have already been completed and cannot be altered to match the new configuration, you will use the customer's configuration designations to communicate any issues to the customer. The supplier is not at fault when a change is made halfway through. “Sorry, 15 pieces were already completed to Rev A, the remaining 15 can be made to the new Rev B print but the cost will be an additional $XX.XX.”
The small company in this example does not need to document the configuration management process; it will be easily understood and easy to prove. The idea of claiming exemption from the requirement seems more difficult than proving use of the customer's preexisting configuration management.
__________________
None of the secrets of success will work unless you do. - Fortune Cookie
|
|
Thanks to Hodgepodge for your informative Post and/or Attachment!
|
|

3rd September 2011, 12:20 PM
|
|
Appreciated Member
Registration Date: Oct 2007
Location: United States, connecticut
|
|
Posts: 526
Thanks Given to Others: 130
Thanked 217 Times in 144 Posts
Karma Power: 78
|
|
|
Re: Exclusion of AS9100C Clause 7.1.1 and Clause 7.1.3 for a Small Shop
Quote:
In Reply to Parent Post by Hodgepodge
As far as configuration management goes, the small shop making items to print is using the configuration defined by the customer. The product designer is maintaining/managing the configuration and the small shop is using it.
You may say this small company is exempt from this requirement but in reality, they still care about it. If there is a B/P change to work in progress and the change is flowed down, your company will make a change to the configuration of the part. If parts in WIP have already been completed and cannot be altered to match the new configuration, you will use the customer's configuration designations to communicate any issues to the customer. The supplier is not at fault when a change is made halfway through. “Sorry, 15 pieces were already completed to Rev A, the remaining 15 can be made to the new Rev B print but the cost will be an additional $XX.XX.”
The small company in this example does not need to document the configuration management process; it will be easily understood and easy to prove. The idea of claiming exemption from the requirement seems more difficult than proving use of the customer's preexisting configuration management.
|
Agree, this is why the auditor didn't want us to ignore the configuration management in section
7.1 e) configuration management appropriate to the product.
Companies that have design and development clause:
7.3.6.1 c) the correct configuration is submitted to the test
must incorporate clause 7.1.3 and use ISO 10007 for guidance.
Thanks for the feedback
|
|
Thanks to dsanabria for your informative Post and/or Attachment!
|
|

3rd September 2011, 12:21 PM
|
 |
Post Responsibly
Registration Date: Oct 2001
Location: Long Beach, CA - USofA
|
|
Posts: 7,691
Thanks Given to Others: 1,590
Thanked 4,622 Times in 2,425 Posts
Karma Power: 879
|
|
|
Re: Exclusion of AS9100C Clause 7.1.1 and Clause 7.1.3 for a Small Shop
Quote:
In Reply to Parent Post by Hodgepodge
As far as configuration management goes, the small shop making items to print is using the configuration defined by the customer. The product designer is maintaining/managing the configuration and the small shop is using it.
You may say this small company is exempt from this requirement but in reality, they still care about it. If there is a B/P change to work in progress and the change is flowed down, your company will make a change to the configuration of the part. If parts in WIP have already been completed and cannot be altered to match the new configuration, you will use the customer's configuration designations to communicate any issues to the customer. The supplier is not at fault when a change is made halfway through. “Sorry, 15 pieces were already completed to Rev A, the remaining 15 can be made to the new Rev B print but the cost will be an additional $XX.XX.”
The small company in this example does not need to document the configuration management process; it will be easily understood and easy to prove. The idea of claiming exemption from the requirement seems more difficult than proving use of the customer's preexisting configuration management.
|
I still don't buy this. What you refer to as configuration management in , to me, is nothing more than product conformity to requirements. As I said before an ISO 9001 compliant machine shop would be required to do the same thing without having to comply with CM. Yesterday I emailed the AS9100 SDR asking for clarification on this subject since this very question about the possibility of excluding PM, RM and CM has been already asked and the answer in the 9100:2009 clarifications document is inconclusive: the first half of the answer says that the exclusions would be possible while the second half of the answer states that all organizations in the ASD sector would be expected to demonstrate some form of CM, PM & RM.  . I think it is time for people offering interpretations clarifications to come off the fence.
__________________
Sustainable conformity assessment must add value to all stakeholders
|
|
Thank You to Sidney Vianna for your informative Post and/or Attachment!
|
|
Lower Navigation Bar
|
|
|
Do you find this discussion thread helpful and informational?
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Forum Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|