Control Plans and Process Flow Diagrams
I need some more education
What is the difference between a Control Plan and a Process Flow Diagram?
I think I am on the right track, but I need some assurance.
A Process Flow Diagram is like a flow chart showing all the manufacturing steps required to make a part.
A Control Plan provides detail on how each of these steps will be monitored and controled.
Am I on the right track here?
Thanks all.
Regards,
CarolX
__________________
CarolX
Theater is life, film is art, and television is furniture.
|

30th July 2002, 02:13 PM
|
 |
Dogs rule
Registration Date: Jul 2002
Location: Madison, WI
Age: 56
|
|
Posts: 980
Thanks Given to Others: 15
Thanked 23 Times in 16 Posts
Karma Power: 69
|
|
Hi Carol,
The "natural" order of the PPAP documents is:
a) Process Flow Diagram which lists (and numerates) each
processing step in the production sequence;
b) PFMEA which investigates all POTENTIAL Failure modes,
Causes, and Controls at each step;
c) The Control Plan which goes into detail concerning the Product
and Process Controls listed in each processing step of the
PFMEA.
Hope this helps some?
__________________
There is no psychiatrist in the world like a puppy licking your face. - Ben Williams
|

30th July 2002, 06:06 PM
|
|
|
Bill,
It sure should! Great explanation
|

31st July 2002, 10:23 AM
|
 |
Send Martini's !!!!!!!
Registration Date: Feb 2002
Location: Wine Country, NY
Age: 38
|
|
Posts: 201
Thanks Given to Others: 1
Thanked 23 Times in 19 Posts
Karma Power: 42
|
|
Cooking School
Here’s the quirky way I think of it. Let’s bake a cake. A Control Plan is the recipe card. It tells you all the ingredients, measurements, time and cooking temperatures, etc, that if followed will give you a good cake every time (not like the ones mom used to make that were a bit flat). Process Flow is simply a visual representation of that process from start to finish, without much detail and IMHO is 100 % worthless. If you do the FMEA right, you walk the process from start to finish anyway. Then you generate the CP from the good FMEA,,,……… Just another worthless AIAG document that again confirms to me that they get kickbacks from the paper companies.
__________________
Operator Error cannot be the Root Cause. Oh, unless you're a Pilot.
|

31st July 2002, 11:25 AM
|
 |
Super Moderator
Registration Date: Jun 2000
Location: North of Chicago,Illinois, USA
Age: 49
|
|
Posts: 2,087
Thanks Given to Others: 419
Thanked 314 Times in 234 Posts
Karma Power: 176
|
|
a better understanding now
Bill, Al and noboxwine
Thanks for you great explanations. Certainly makes more sense now. Especially yours, noboxwine...great anaology. And as a real outsider to all this, it does seem a bit repetative, but.....gotta give the customer what they want.
Regards,
CarolX
__________________
CarolX
Theater is life, film is art, and television is furniture.
|

31st July 2002, 11:31 AM
|
 |
Where's the shall?
Registration Date: Jul 2001
Location: Plymouth, MI
Age: 53
|
|
Posts: 2,202
Thanks Given to Others: 208
Thanked 166 Times in 128 Posts
Karma Power: 129
|
|
Outsider????
Quote:
|
as a real outsider to all this
|
Come on Carol, you've been hanging around the Cove (and participating) long enough to be as much of an insider as any of us. It is just no one knows it all, but together we come close!!!
__________________
Dave B (the other Dave)
|

31st July 2002, 11:35 AM
|
 |
Super Moderator
Registration Date: Jun 2000
Location: North of Chicago,Illinois, USA
Age: 49
|
|
Posts: 2,087
Thanks Given to Others: 419
Thanked 314 Times in 234 Posts
Karma Power: 176
|
|
LOL
db,
I guess your right..I've been hanging out here for a while...but this is my first foray into PPAP...hence the outsider comment. Thanks for the uplift!
CarolX
__________________
CarolX
Theater is life, film is art, and television is furniture.
|

14th August 2002, 12:57 PM
|
|
Forum Moderator
Registration Date: Jun 2002
Location: Silvassa,Near Mumbai in INDIA
Age: 43
|
|
Posts: 316
Thanks Given to Others: 5
Thanked 43 Times in 10 Posts
Karma Power: 50
|
|
Besides the above points A Control plan (In my Company we call as Process Control Standards) essentialy contain the following:
a) General data
- control plan number,
- issue date, and revision date, if any,
- customer information (see customer requirements),
- organization's name/site designation,
- part number(s),
- part name/description,
- engineering change level,
- phase covered (prototype, pre-launch, production),
- key contact,
- part/process step number,
- process name/operation description.
b) Product control
- product-related special characteristics,
- other characteristics for control (number, product or process),
- specification/tolerance.
c) Process control
- process parameters,
- process-related special characteristics,
- machines, jigs, fixtures, tools for manufacturing.
d) Methods
- evaluation measurement technique., -error-proofing.,
- sample size and frequency, -control method.
b) Reaction plan and corrective actions
- reaction plan (include or reference),
- corrective action.
|
Lower Navigation Bar
|
|
|
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|