The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 2nd August 2002, 09:28 AM
JRKH's Avatar
JRKH JRKH is offline
Involved - Posts

Registration Date: Apr 2001
Location: Cincinnati, Ohio
Age: 54
 
Posts: 618
Thanks Given to Others: 57
Thanked 59 Times in 31 Posts
Karma Power: 95
Karma: 2397
JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.
Unhappy Lab Scope

OK. Had our document audit yesterday. Everything is going fairly well. Nothing major. Then we reach 4.10.6.1.

The Auditor informs me that the lab scope must include any inspection station out on the shop floor. That this was the way it was explained to him by the AIAG trainers.

We do have an open area in the shop where inspections are performed. This area is not controlled for temp, or humidity, nor do we do anything but dimensional inspection there.

The definition of Laboratory in Section I of the manual does not include inspection, plus the note at the head of 4.10.6 states that 4.10.6 does not apply to inspection or testing performed outside of a laboratory. The QS-9000 Glossary definition for Labaoratory does include dimensional inspection, but also defines it as a "test facility". To me, a facility indicates an area seperate and controlled.

So to the question: Do I need to create a scope for this or is my auditor off his rocker.

James
__________________
Low tech is better than no tech.

The only constant is those who declare, "Things around here will never change!!"
Reply With Quote

Sponsored Links
  #2  
Old 2nd August 2002, 09:39 AM
Sam's Avatar
Sam Sam is offline

Registration Date: Sep 1999
Location: Oklahoma
Age: 67
 
Posts: 1,437
Thanks Given to Others: 1
Thanked 29 Times in 17 Posts
Karma Power: 90
Karma: 1020
Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.
Default

The standard is quite clear, Lab requirements do not apply to inspection stations.
If I remember correctly, that subject is also addressed in the earlier interpretations.
__________________
Sam Goody
Reply With Quote
Sponsored Links

  #3  
Old 2nd August 2002, 10:21 AM
Ken K's Avatar
Ken K Ken K is offline
!

Registration Date: Jun 2000
Location: USA
Age: 56
 
Posts: 406
Thanks Given to Others: 0
Thanked 14 Times in 13 Posts
Karma Power: 57
Karma: 515
Ken K is appreciated, and has over 500 Karma points.Ken K is appreciated, and has over 500 Karma points.Ken K is appreciated, and has over 500 Karma points.Ken K is appreciated, and has over 500 Karma points.Ken K is appreciated, and has over 500 Karma points.Ken K is appreciated, and has over 500 Karma points.
Default

I agree with Sam. If no testing or calibration is performed in the area, it should not need to be included.
Reply With Quote
  #4  
Old 2nd August 2002, 01:21 PM
JRKH's Avatar
JRKH JRKH is offline
Involved - Posts

Registration Date: Apr 2001
Location: Cincinnati, Ohio
Age: 54
 
Posts: 618
Thanks Given to Others: 57
Thanked 59 Times in 31 Posts
Karma Power: 95
Karma: 2397
JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.
Default

Quote:
Sam said:

The standard is quite clear, Lab requirements do not apply to inspection stations.
If I remember correctly, that subject is also addressed in the earlier interpretations.

Thanks for your input. I did a search and found this:

http://www.aiag.org - DEAD LINK --> /quality/4.10.6.html

this seems to support my auditor since it includes an "area" in the definition of a laboratory. Any comments?
__________________
Low tech is better than no tech.

The only constant is those who declare, "Things around here will never change!!"
Reply With Quote
  #5  
Old 2nd August 2002, 02:44 PM
Al Dyer
Unregistered Guest

 
Posts: n/a
Default

Ask the registrar to assign an auditor that knows what he/she is doing. After that find a new registrar, find a new Management Rep. that can explain the system
Reply With Quote
  #6  
Old 2nd August 2002, 02:53 PM
D.Scott's Avatar
D.Scott D.Scott is offline
Super Moderator

Registration Date: Feb 2001
Location: Wellington, OH USA
Age: 69
 
Posts: 1,604
Thanks Given to Others: 80
Thanked 289 Times in 172 Posts
Karma Power: 149
Karma: 4082
D.Scott is appreciated, and has over 1700 Karma points.
D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.
Send a message via Yahoo to D.Scott
Default

The same document goes on to say -

What isn't a lab? Places where testing occurs as a part of a process, which are within the parameters of that process. In other words, if testing is adequately controlled by in-process testing and inspection, and the items to be tested are not taken out of the process to a "facility," the in-house laboratory requirement does not apply.

I am really not sure where this is going and maybe I am confused but what does the location of a floor inspection area have to do with the lab scope? The scope should cover the intent of the lab, the tests performed, the equipment available etc. I don't know of a requirement to specifically define the location of the lab elements. If your scope includes dimensional inspection, why does it matter?

Dave
__________________
"Time you enjoyed wasting is not wasted time"
Reply With Quote
  #7  
Old 2nd August 2002, 04:09 PM
JRKH's Avatar
JRKH JRKH is offline
Involved - Posts

Registration Date: Apr 2001
Location: Cincinnati, Ohio
Age: 54
 
Posts: 618
Thanks Given to Others: 57
Thanked 59 Times in 31 Posts
Karma Power: 95
Karma: 2397
JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.
Default

Quote:
D.Scott said:

The same document goes on to say -

What isn't a lab? Places where testing occurs as a part of a process, which are within the parameters of that process. In other words, if testing is adequately controlled by in-process testing and inspection, and the items to be tested are not taken out of the process to a "facility," the in-house laboratory requirement does not apply.

I am really not sure where this is going and maybe I am confused but what does the location of a floor inspection area have to do with the lab scope? The scope should cover the intent of the lab, the tests performed, the equipment available etc. I don't know of a requirement to specifically define the location of the lab elements. If your scope includes dimensional inspection, why does it matter?

Dave
Dave,
I guess I'm on kind of a fishing expedition here, and maybe I'm the one who is confused. I have a lab scope for my calibration lab but didn't think I needed one for "inspection".

As defined, a lab is the: "(suppliers testing facility - chemical, metallurgical, reliability, test validation, e.g. fastener labs)". Since what we do is dimensional inspection, and almost all of this is done during the normal production process, (though not "right at the machine"). I don't equate this "inspection" as "Testing at a Facility".

Maybe I'm wrong, but I always thought of inspection and testing as two different things.
Inspection: Checking dimensions, visual inspections of surfaces etc,
Testing: Destructive ( tensile, shear, fatique etc) and Non-destructive: (hardness testing etc.)

Like I said, maybe I'm the one who is confused.

James
__________________
Low tech is better than no tech.

The only constant is those who declare, "Things around here will never change!!"

Last edited by JRKH; 2nd August 2002 at 04:14 PM.
Reply With Quote
  #8  
Old 5th August 2002, 12:49 PM
Ken K's Avatar
Ken K Ken K is offline
!

Registration Date: Jun 2000
Location: USA
Age: 56
 
Posts: 406
Thanks Given to Others: 0
Thanked 14 Times in 13 Posts
Karma Power: 57
Karma: 515
Ken K is appreciated, and has over 500 Karma points.Ken K is appreciated, and has over 500 Karma points.Ken K is appreciated, and has over 500 Karma points.Ken K is appreciated, and has over 500 Karma points.Ken K is appreciated, and has over 500 Karma points.Ken K is appreciated, and has over 500 Karma points.
Default

James, who exactly is doing the inspection? Production people, QA, lab personnel?

Is the inspection a function of your lab?

I guess my point is if someone from quality comes through and grabs a part, sets it aside and inspects it, does that area also become part of the lab scope.



Quote:
That this was the way it was explained to him by the AIAG trainers.
I would really ask your auditor to show you evidence of this "interpretation" from AIAG.

Was this area questioned before? New auditor?

Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Calibration Process QC Laboratory vs. Calibration of Shop Floor Tools thallecnc ISO 9001 - Quality Management Systems Standard 17 27th May 2009 11:42 AM
SPC on the shop floor - We are a job shop CMfgT SPC Monitoring and Statistical Analysis Techniques 5 1st October 2008 02:28 PM
Internal Laboratory - Defining the Laboratory Scope - Inspection, Test, Calibration DJN Inspection and Test, Sampling and Related Topics 18 7th March 2005 12:20 PM
Is it necessary to document a shop floor system? sheryljuco Documentation Control Systems, Procedures, Forms and Templates 7 23rd February 2004 02:29 PM
Where can I find Safety Pamphlets for Laboratory Stations? Lynn Various Other Specifications, Standards, and related Requirements 3 2nd October 2001 07:53 PM



The time now is 11:30 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts