The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Information Resources - Papers - Articles - Etc. > Definitions, Acronyms, Abbreviations and Interpretations

Elsmar Cove Forum Visitor Notices


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 18th August 2002, 07:39 AM
felixgh felixgh is offline
Inactive Registered Visitor

Registration Date: Apr 2001
Location: Zaragoza, España
 
Posts: 5
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 36
Karma: 10
felixgh has less than 100 Karma points so far.
Let Me Help You Process Capacity and Over Adjustment - Definitions

Hi!

I need some good definitions for "process capacity" and "overadjustment".

Thank you in advance.

FG
Reply With Quote

Sponsored Links
  #2  
Old 18th August 2002, 12:06 PM
M Greenaway's Avatar
M Greenaway M Greenaway is offline
Courtesy Access

Registration Date: Dec 2001
Location: England
 
Posts: 1,643
Thanks Given to Others: 10
Thanked 63 Times in 44 Posts
Karma Power: 80
Karma: 794
M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.
Default

Felix

I have not heard the term 'process capacity', do you mean 'process capability' ?

'Overadjustment' could be defined as adjusting a process to correct an 'out of specification' reading such that the process is then 'out of specification' at the other end of the specification range. i.e. if I am turning down a diameter on a shaft, and I monitor my process my measuring the shaft od I might measure 9.5mm against a spec of 10mm +/- 0.1mm and therefore adjust my machine offsets such that the next piece produced is 10.5mm - again out of spec.

This can occur more subtely where a decision is taken to adjust a process based on a process reading that is actually indicative of the capability of the process, and doesnt actually require the process to be adjusted. Correct use of run charts should eliminate such problems.
Reply With Quote
Sponsored Links

  #3  
Old 18th August 2002, 03:32 PM
felixgh felixgh is offline
Inactive Registered Visitor

Registration Date: Apr 2001
Location: Zaragoza, España
 
Posts: 5
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 36
Karma: 10
felixgh has less than 100 Karma points so far.
Default

M Greenaway,

Thanks for your reply. You are right, I mean 'process capability'.
¿Any definition?...

Felix
Reply With Quote
  #4  
Old 18th August 2002, 04:14 PM
Atul Khandekar's Avatar
Atul Khandekar Atul Khandekar is offline
Forum Administrator

Registration Date: Mar 2000
Location: Pune, India
Age: 47
 
Posts: 1,073
Thanks Given to Others: 83
Thanked 84 Times in 55 Posts
Karma Power: 90
Atul Khandekar has disabled his/her Karma.
Send a message via Skype™ to Atul Khandekar
Default

Process Capability: Definition and more:
http://www.symphonytech.com/articles...capability.htm
__________________
You are never given a wish without also being given the power to make it true. You may have to work for it, however. ~Richard Bach
Reply With Quote
  #5  
Old 19th August 2002, 05:14 AM
M Greenaway's Avatar
M Greenaway M Greenaway is offline
Courtesy Access

Registration Date: Dec 2001
Location: England
 
Posts: 1,643
Thanks Given to Others: 10
Thanked 63 Times in 44 Posts
Karma Power: 80
Karma: 794
M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.
Default

Jim

Yes, this statement is so wooly I am sure it will be poorly implemented. I think it should be a statistical measure of process capability - this is what I believe is key to the 'process approach' loosely defined in ISO9001, i.e. not drawing pretty pictures of process models, but understanding process performance, variation and causes of variation, and utilising statistical methods for this.

Just my opinion though......
Reply With Quote
  #6  
Old 19th August 2002, 10:15 AM
db's Avatar
db db is offline
Where's the shall?

Registration Date: Jul 2001
Location: Plymouth, MI
Age: 53
 
Posts: 2,202
Thanks Given to Others: 208
Thanked 166 Times in 128 Posts
Karma Power: 129
Karma: 2579
db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.
Default Process Capability

Quote:
When in 8..2.3, ISO 9001 talks about demonstrating "the ability of the processes to achieve planned results" is it talking, do you think, of process capability as commonly understood?
Living in the shadow of the B3, this has always seemed to mean CpK and such. However, not all processes are suitable for this type of study. TS, goes as far as calling them “process studies” (8.2.3.1) which supports CpKs. On an ISO system, as you say Jim we need to think beyond process capability studies. The key, IMNSHO is to determine if your processes meet plans. Also, don’t just think production…consider all your processes that can affect customer satisfaction.
__________________
Dave B (the other Dave)
Reply With Quote
  #7  
Old 19th August 2002, 10:20 AM
M Greenaway's Avatar
M Greenaway M Greenaway is offline
Courtesy Access

Registration Date: Dec 2001
Location: England
 
Posts: 1,643
Thanks Given to Others: 10
Thanked 63 Times in 44 Posts
Karma Power: 80
Karma: 794
M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.
Default

db

What sorts of processes would not be suitable for such a study ??
Reply With Quote
  #8  
Old 19th August 2002, 10:55 AM
Sam's Avatar
Sam Sam is offline

Registration Date: Sep 1999
Location: Oklahoma
Age: 67
 
Posts: 1,437
Thanks Given to Others: 1
Thanked 29 Times in 17 Posts
Karma Power: 90
Karma: 1020
Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.
Default

MG,
Processes that require only visual inspection as a means of acceptance.
__________________
Sam Goody
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Information Resources - Papers - Articles - Etc. > Definitions, Acronyms, Abbreviations and Interpretations

Bookmarks

Tags
capacity analysis, definition, process capacity

Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Pre-Control Chart to guide in-process inspection / adjustment decisions Don Watt Inspection and Test, Sampling and Related Topics 43 28th November 2008 01:45 PM
Capacity Utilization - How to do a capacity utilization project Andy_80 Six Sigma 2 4th June 2007 06:24 PM
Availability - Measurability - Manufacturing Process Capability - Definitions xxxmanxxx Definitions, Acronyms, Abbreviations and Interpretations 1 6th March 2006 11:25 PM
Process Capability (Cp and Cpk) - Definitions Marc Definitions, Acronyms, Abbreviations and Interpretations 0 25th July 2005 03:01 AM
Parallel Process - I found two Definitions - Which is correct? MarkJoel Definitions, Acronyms, Abbreviations and Interpretations 6 24th November 2004 10:08 AM



The time now is 12:41 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts