The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 1 votes, 5.00 average. Display Modes
  #1  
Old 15th September 2000, 04:52 AM
Don Watt
Unregistered Guest

 
Posts: n/a
Hehehe... Pre-Control Chart to guide in-process inspection / adjustment decisions

Hi'all,
I've just inherited a new department and in order to try to start to move forward, I'm interested in trying to apply pre-control charting to guide in-process inspection / adjustment decisions.

I think it would suit an application where an operator is running a bank of 5 machines.
I'm told that we tried SPC ("didn't work - batch sizes too small / "Quality" depends on how good the set-up is")There also seems to be a mindset of if it's in tolerance it must be OK (reduction in variation is not viewed as continuous improvement - unfortunately)

Current inspection ssems to be a "finger in the air job" i.e. no data to support when to inspect / when to adjust.

To get to the point, does anybody know of a sampling plan to use a starting point, rather than trying to invent my own.

Cheers,
Don

Reply With Quote

Sponsored Links
  #2  
Old 15th September 2000, 10:19 AM
Rick Goodson's Avatar
Rick Goodson Rick Goodson is offline
Inactive Registered Visitor

Registration Date: Aug 2000
Location: Waukesha, Wisconsin, USA
 
Posts: 229
Thanks Given to Others: 0
Thanked 3 Times in 3 Posts
Karma Power: 42
Karma: 20
Rick Goodson has less than 100 Karma points so far.
Don,

There are pre-control plans available but I would caution you that they all start with a caveat that the process first has to be in statistical control before you use the pre-control techniques. If you have not been able to implement SPC successfully it will be difficult to move to pre-control. A Cpk greater than 2.0 is not unusual as a minimum pre-control requirement.

Most plans are based on three zones. The green zone is 50% of tolerance and centered around the nominal dimension, the yellow zone adds another 25%, the balance is the red zone. There is a text, 'Modern Methods for Control and Involvement', ISBN 0-471-87696-X, with a brief discription of the technique or you might try papers by Dorian Shainin (1965) or N. R. Brown (1966). I also highly recommend you look at 'Statistical Quality Control' by Grant and Leavenworth, ISBN 0-07-024162-7. The authors present a number of reason why you should not use pre-control and in fact go so far as to state "The best advice we can give is to recommend almost any technique discussed in this book in preference to precontrol. The pattern of variation is a characteristic of the process and should never be confused with design tolerances."
Reply With Quote
Sponsored Links

  #3  
Old 15th September 2000, 04:31 PM
Don Watt
Unregistered Guest

 
Posts: n/a
BIG Smile

Hi Rick,
Many thanks for the information, I'll certainly be having a look at the Grant & Leavenworth book.

I was under the impression that pre-control may be ok with Cp between 1 & 1.33 (the limited studies that I've done so far indicate that we have this basic capability)
If Cp of 2 or greater is required, I need to think again :-<

Reply With Quote
  #4  
Old 10th October 2000, 12:42 PM
Jan Ketelaar
Unregistered Guest

 
Posts: n/a
BIG Smile

Hi Don,

I know what you are looking at. I also had the beauty of walking into a new department and it is still difficult to teach an old dog new tricks. I do work with a cp of 1-1.33 and it works okay. Soon I will start to introduce a system simular as the 50% / 25% zone. Only, I will use 1, 2 and 3 sigma. 2 Sigma being a yellow zone. If I have not been killed by then I will post the results....

Reply With Quote
  #5  
Old 7th December 2001, 10:09 AM
Jim Jakosh Jim Jakosh is offline
Inactive Registered Visitor

Registration Date: Nov 2001
Location: Grand Rapids, Mi
Age: 63
 
Posts: 4
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 33
Karma: 10
Jim Jakosh has less than 100 Karma points so far.
Question Pre Control Charts

What conditions have to to be in place to define "when" you can use a pre-control chart on an ongoing process?
Jim Jakosh_ Grand Rapids, Mi
Reply With Quote
  #6  
Old 7th December 2001, 11:39 AM
Al Dyer
Unregistered Guest

 
Posts: n/a
Default

Jim,

Can I assume that your currect process is in control?

Ifso, what would be the need or benefit of adding a pre-control chart?

Maybe some more details will help us!
Reply With Quote
  #7  
Old 23rd December 2001, 04:51 AM
Ravi Khare's Avatar
Ravi Khare Ravi Khare is offline
Involved - Posts

Registration Date: Dec 2001
Location: Pune, India
Age: 48
 
Posts: 70
Thanks Given to Others: 0
Thanked 3 Times in 3 Posts
Karma Power: 35
Karma: 58
Ravi Khare has less than 100 Karma points so far.
Cool

PreControl will work well only when you already have a good Process Capability. To qualify a process, you will need five points in a row in the Green zone ( middle 50% of specs) on the precontrol chart. This would happen only if you have a good process capability with the process centered.

A precontrol chart would monitor whether your process maintains the low variation and holds on to the centre as you sample out of it.
Reply With Quote
  #8  
Old 23rd August 2002, 11:58 AM
gpainter gpainter is offline
Courtesy Access

Registration Date: Sep 2001
Location: Southern Indiana
Age: 47
 
Posts: 941
Thanks Given to Others: 3
Thanked 29 Times in 25 Posts
Karma Power: 65
Karma: 696
gpainter is appreciated, and has over 500 Karma points.gpainter is appreciated, and has over 500 Karma points.gpainter is appreciated, and has over 500 Karma points.gpainter is appreciated, and has over 500 Karma points.gpainter is appreciated, and has over 500 Karma points.gpainter is appreciated, and has over 500 Karma points.
Default PRE-Control

I had seen a short article on this and was wondering if anyone could point me in a direction for some good resources on this? Thanks in advance!!
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics

Bookmarks

Tags
in-process inspection, inspection, pre-control chart


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Minitab Pareto Chart Text Adjustment Michaelk Using Minitab Software 10 5th August 2008 09:42 AM
New(?) kind of control Chart? Pre-Control Chart António Vieira SPC Monitoring and Statistical Analysis Techniques 13 9th March 2007 07:05 AM
Defining Pre-Control Zones - Statistical Process Control (SPC) llemouse SPC Monitoring and Statistical Analysis Techniques 1 15th March 2004 03:08 AM
Pre-Control Chart - Limits are set at 2/3 of the specification Fluidfont SPC Monitoring and Statistical Analysis Techniques 6 13th November 2003 12:06 PM
Customer Audit of Guide 25 Calibration - Full pre and post adjustment data? Marc ISO 17025 - Calibration, Measurement Gages and Test Laboratories 1 5th November 1999 08:52 PM



The time now is 09:42 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts