The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Supplier Quality Assurance and other Supplier Issues


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 4th September 2002, 09:27 AM
tracey's Avatar
tracey tracey is offline
$ Contributor

Registration Date: May 2002
Location: Canada
 
Posts: 35
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 33
Karma: 133
tracey is appreciated, and has over 100 Karma points.tracey is appreciated, and has over 100 Karma points.
Question Our Approved Vendor / Supplier list contains EVERY supplier we currently have

Our company has an approved vendors list which contains EVERY supplier we currently have. Our procedures state that we are able to use a supplier once (in an emergency) without them being place on the list. We want to change our procedures to state that " suppliers that affect our product" will be on the approved vendors list. We find ourselfs spending alot of time trying to get suppliers who have very little impact on our final product to fill out our questionairre. An example of these suppliers would be the gas station we may buy fuel from for our trucks while on the road or Tim Hortons where we buy our employees donuts on Saturdays. I know that every supplier does effect the final product wether the affect was cheering up the employees Saturday which in turn they produce a better product. Where is the line drawn? Do we decide?
Reply With Quote

Sponsored Links
  #2  
Old 4th September 2002, 09:31 AM
M Greenaway's Avatar
M Greenaway M Greenaway is offline
Courtesy Access

Registration Date: Dec 2001
Location: England
 
Posts: 1,643
Thanks Given to Others: 10
Thanked 63 Times in 44 Posts
Karma Power: 80
Karma: 794
M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.
Default

Tracey

Absolutely YOU decide.

Suppliers of raw material, and sub-contractors are a good place to start, and yes focus on the product !
Reply With Quote
Sponsored Links

  #3  
Old 4th September 2002, 10:30 AM
tracey's Avatar
tracey tracey is offline
$ Contributor

Registration Date: May 2002
Location: Canada
 
Posts: 35
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 33
Karma: 133
tracey is appreciated, and has over 100 Karma points.tracey is appreciated, and has over 100 Karma points.
Default

Thank you M Greenway. Up until last November we had a consultant who really made things more confusing than they had to be. She told us that EVERY company/person that we purchase anything from must be on the list. We have had to write Corrective action after corrective action on this issue. I think there has been one open since I took over in November.
Reply With Quote
  #4  
Old 4th September 2002, 10:44 AM
M Greenaway's Avatar
M Greenaway M Greenaway is offline
Courtesy Access

Registration Date: Dec 2001
Location: England
 
Posts: 1,643
Thanks Given to Others: 10
Thanked 63 Times in 44 Posts
Karma Power: 80
Karma: 794
M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.
Default

My advice is never use consultants !

Too many have a vested interest in making things far more complicated and beurocratic than they need be.

Any system of control should be based on an analysis of the risks involved, and appropriate action taken based on that analysis.
Reply With Quote
  #5  
Old 4th September 2002, 11:08 AM
Mike S. Mike S. is offline
An Early 'Cover'

Registration Date: Mar 2002
Location: East Coast US
 
Posts: 1,773
Thanks Given to Others: 24
Thanked 51 Times in 39 Posts
Karma Power: 103
Karma: 1849
Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.
Default

Tracey,

IMO your consultant was a nut!

I agree with Martin (again -- twice in one day so far!). The phrase "where is the shall" comes to mind. The standard says you must determine the "type and extent of control" and the "criteria for selection, evaluation, and re-evaluation". It does not say what your consultant is saying. Do what works for you. We excluded by policy suppliers of stuff like office supplies, general hand tools, and food/drink from needing formal evaluation. For the balance of suppliers of product-related stuff, depending on the criticality of the product/service, we use either a mailed survey, on-site visit, previously demonstrated performance, or "emergency approval" by one of the "top dogs".
__________________
Mike S. ("Gun Nut")
And they ask me why I drink....
Reply With Quote
  #6  
Old 4th September 2002, 11:55 AM
E Wall's Avatar
E Wall E Wall is offline
Just Me!

Registration Date: Jun 2001
Location: Southeast USA
 
Posts: 482
Thanks Given to Others: 67
Thanked 26 Times in 21 Posts
Karma Power: 63
Karma: 977
E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.
Thumbs up You set Criteria & Requirements

Tracey - Looks like this one is answered already.

I can tell you how we approached this:
* Set classifications regarding the quality impact on product (or equipment, etc...based on your needs)
* Establish supplier criteria on classifications
* Only those suppliers providing parts/services/equip/etc.. within established classifications must be evaluated to the criteria defined.

Hope it helps,
Eileen
Reply With Quote
  #7  
Old 4th September 2002, 12:12 PM
tracey's Avatar
tracey tracey is offline
$ Contributor

Registration Date: May 2002
Location: Canada
 
Posts: 35
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 33
Karma: 133
tracey is appreciated, and has over 100 Karma points.tracey is appreciated, and has over 100 Karma points.
Default


Thanks again, cove members, for your help. I now feel confident in proceding with the changes. I must say that I agree totally about the cunsultant ( in this case anyway). There was much unneeded work and confusion due to her. When I took over there was nothing but resentment towards ISO. Nobody wanted any part of it. Slowly but surely we are pulling it together.
Reply With Quote
  #8  
Old 4th September 2002, 01:12 PM
db's Avatar
db db is offline
Where's the shall?

Registration Date: Jul 2001
Location: Plymouth, MI
Age: 53
 
Posts: 2,202
Thanks Given to Others: 208
Thanked 166 Times in 128 Posts
Karma Power: 129
Karma: 2579
db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.
Default

Martin said:
Quote:
My advice is never use consultants !
As a consultant, I take exception to that remark. However, you must ALWAYS listen carefully to what they say. Any time a consultant says you have to do something that is not a direct “shall”, you should question it.


Mike S said:
Quote:
The phrase "where is the shall" comes to mind.
Hey! That's my line!

Good advice though.
__________________
Dave B (the other Dave)
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Supplier Quality Assurance and other Supplier Issues

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Approved Vendor (Supplier) List contain Vendor Evaluation? rlsavard Supplier Quality Assurance and other Supplier Issues 4 2nd October 2009 07:40 AM
Approved Supplier List - Required to evaluate every supplier? jenrl16 ISO 9001 - Quality Management Systems Standard 16 13th May 2009 01:27 PM
Supplier of Automatic Gaging Systems need to be on our Approved Supplier List? zzz123 ISO/TS 16949 - International Automotive Quality Systems Standard 6 18th August 2007 11:48 AM
Approved supplier/vendor - How do I approve my Registrar? Carl Keller Supplier Quality Assurance and other Supplier Issues 17 4th October 2005 03:51 PM
Approved Vendor (Supplier) List Issues - Class II medical device maker DonkeyKong Supplier Quality Assurance and other Supplier Issues 2 20th December 2002 12:47 PM



The time now is 04:51 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts