The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Manufacturing and Related Processes


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 12th September 2002, 12:04 PM
Andrews Andrews is offline
Involved - Posts

Registration Date: Oct 2001
Location: Chennai - India
Age: 32
 
Posts: 293
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 39
Karma: 43
Andrews has less than 100 Karma points so far.
Let Me Help You Reducing Change Over Time

We had tried our best to reduce the setting time (changeover time) from X hrs to Y hrs and had been successful for 6 months but it has started to deteriorate from the 7th month onwards.The setters who do the setting are skilled in their job and constant training is being given . One observation was that setting time have been less whenever the supervisor is beside the operator for the complete setting . But we are not able to ask the supervisor to followup the setting because he is held up in other machines ?
What can the forum users suggest to improve this performance? What do you find is lacking?
Reply With Quote

Sponsored Links
  #2  
Old 12th September 2002, 02:00 PM
Kevin Mader's Avatar
Kevin Mader Kevin Mader is offline
One of THE Original Covers!

Registration Date: Nov 1998
Location: Wallingford, CT USA
Age: 43
 
Posts: 1,158
Thanks Given to Others: 22
Thanked 63 Times in 43 Posts
Karma Power: 94
Karma: 1335
Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.
Send a message via AIM to Kevin Mader
Default

Andrews,

It is necessary to fully understand the inputs and outputs of a process and determine if the process is already in statistical control. For instance, what are Xbar and UCL/LCL for the changeover process for a given product/tool? Are only Common Causes present, or do you have some special causes at play?

It is difficult half a world away to know for sure, but I’ll hazard a guess that the naturally established changeover time was probably in statistical control suggesting that only Common Causes were in play. When you introduced a Special Cause (increased supervision), the outcome met your arbitrarily established lower changeover time. Once the Special Cause left, then the process returned to its former state and your gains were lost. The Supervisor is a Special Cause in this instance.

To make lasting change, you must establish a statistically controlled process (no Special Causes) and understand the Common Causes of variation. Next, establish a goal within the process limits (higher or lower depending on what it is you are trying to do). Then, you set to work to improve on the Common Causes. When these improve, the process becomes more robust and the process mean improves.

Regards,

Kevin
__________________
"Without theory there is nothing to modify or learn." W. Edwards Deming
Reply With Quote
Sponsored Links

  #3  
Old 12th September 2002, 03:13 PM
Atul Khandekar's Avatar
Atul Khandekar Atul Khandekar is offline
Forum Administrator

Registration Date: Mar 2000
Location: Pune, India
Age: 47
 
Posts: 1,073
Thanks Given to Others: 83
Thanked 84 Times in 55 Posts
Karma Power: 90
Atul Khandekar has disabled his/her Karma.
Send a message via Skype™ to Atul Khandekar
Question

How was standard time Y decided? Did you try to establish the 'work elements' and the time required for these? Did you use techniques such as 'MOST'?
__________________
You are never given a wish without also being given the power to make it true. You may have to work for it, however. ~Richard Bach
Reply With Quote
  #4  
Old 13th September 2002, 03:58 AM
Claes Gefvenberg's Avatar
Claes Gefvenberg Claes Gefvenberg is offline
Forum Administrator

Registration Date: May 2000
Location: Eskilstuna, Sweden
Age: 49
 
Posts: 3,771
Thanks Given to Others: 246
Thanked 244 Times in 172 Posts
Blog Entries: 13
Karma Power: 213
Karma: 4951
Claes Gefvenberg is appreciated, and has over 1700 Karma points.
Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.
Question

Hi Andrews,

I may be totally wrong here, but I'll assume that you mean setting up, like in tool change and things like that? If not, please disregard this.

Anyway, If you do: Have you considered rebuilding the equipment for faster and easier setup instead of fine tuning the existing methods? A lot can be achieved that way.

/Claes
__________________
Hanlon's Razor.
Never attribute to malice that which can be adequately explained by stupidity.
User Groups: Elsmar Cove Cycling Enthusiasts Formula 1 fanatics Photo freaks Readers Corner
Reply With Quote
  #5  
Old 13th September 2002, 08:38 AM
M Greenaway's Avatar
M Greenaway M Greenaway is offline
Courtesy Access

Registration Date: Dec 2001
Location: England
 
Posts: 1,643
Thanks Given to Others: 10
Thanked 63 Times in 44 Posts
Karma Power: 80
Karma: 794
M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.
Default

Took the exact words out of my mouth Kevin. I had typed a very similar response but had to quit before I posted it.

I wouldnt try however to reduce the natural variance of the existing process. I think you need to look for a step change to the process, i.e. re-design of the tools themselves probably, for example reducing the number of fixing bolts.
Reply With Quote
  #6  
Old 13th September 2002, 08:43 AM
Chris May's Avatar
Chris May Chris May is offline
Inactive Registered Visitor

Registration Date: Mar 2002
Location: Bristol, England
Age: 54
 
Posts: 82
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 33
Karma: 10
Chris May has less than 100 Karma points so far.
Default

Andrew,

When the supervisor is present is he actually helping in some small way with the setup ??...maybe he is.

Break the setup down into very small elements including all movement, travelling etc;

You may find that something has moved or been relocated or just broken.

Have you got access to the original time study??

If yes compare notes..if not then do it again using an average rated worker (not your best one).

Regards,

Chris
__________________
Catch people doing things right
Reply With Quote
  #7  
Old 13th September 2002, 10:52 AM
Claes Gefvenberg's Avatar
Claes Gefvenberg Claes Gefvenberg is offline
Forum Administrator

Registration Date: May 2000
Location: Eskilstuna, Sweden
Age: 49
 
Posts: 3,771
Thanks Given to Others: 246
Thanked 244 Times in 172 Posts
Blog Entries: 13
Karma Power: 213
Karma: 4951
Claes Gefvenberg is appreciated, and has over 1700 Karma points.
Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.
Default Yep, that's it

Quote:
M Greenaway said:

Took the exact words out of my mouth Kevin. I had typed a very similar response but had to quit before I posted it.

I wouldnt try however to reduce the natural variance of the existing process. I think you need to look for a step change to the process, i.e. re-design of the tools themselves probably, for example reducing the number of fixing bolts.
Exactly... That's what I was on about too.

/Claes
__________________
Hanlon's Razor.
Never attribute to malice that which can be adequately explained by stupidity.
User Groups: Elsmar Cove Cycling Enthusiasts Formula 1 fanatics Photo freaks Readers Corner
Reply With Quote
  #8  
Old 3rd October 2002, 11:02 AM
Andrews Andrews is offline
Involved - Posts

Registration Date: Oct 2001
Location: Chennai - India
Age: 32
 
Posts: 293
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 39
Karma: 43
Andrews has less than 100 Karma points so far.
Default Thanks

Setting time reduction:
Hi Kevin,
Thank you very much for your reply.Even though you are half a world away ,you have hit the nail in the head.The problem we face is that the operators tend to slow down the setting when the supervisor's head is turned.We are unable to change the operators attitude.
What do the forum users feel is the solution to the problem? How can one improve the attitude of operators?Are there any training programmes that may help improve their attitude?
Sometimes we find that the operators commit the same mistakes despite training them on numerous occasions.
For your information I would like to state that reducing the setting time to Y hrs can be easily achieved because we have been in the manufacture of these parts for atleast 20 yrs and the tooling has bee stabilised.

Hi Atul,
Thanks for your input but I was not able to understand what the "MOST" technique means? Can you please elaborate?

Hi Claes,
Rebuilding the equipment is a very good suggestion but it seems to cost a lot which we are not able to achieve.Moreover the reduction we are planning seems to require dedication from the operators.

May,
Work study is something we have not done till now. After your suggestion, we shall try to conduct work study as soon as possible.This might help us gain some knowledge on where we are losing time.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Manufacturing and Related Processes

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Need Documents and help setting up a QC program Jackmo Documentation Control Systems, Procedures, Forms and Templates 6 25th October 2009 07:13 PM
Need help setting up a QC program Jackmo Documentation Control Systems, Procedures, Forms and Templates 6 25th October 2009 07:13 PM
Business Case for Lead Time Reduction Project Dizzydom Lean - Lean in Manufacturing and Services 9 1st June 2007 02:39 PM
Lead time reduction project on several processes Andrews Lean - Lean in Manufacturing and Services 6 17th April 2007 05:49 AM
Severity Reduction by Product or Process Design Change? Seeking Good Example brutas Design and Development - Process and Product 2 14th September 2006 05:12 AM



The time now is 06:32 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA