The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Design and Development - Process and Product


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 8th October 2002, 06:01 PM
Chickenlips Chickenlips is offline
Involved in Discussions

Registration Date: May 2002
Location: Wisconsin
Age: 38
 
Posts: 16
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 31
Karma: 10
Chickenlips has less than 100 Karma points so far.
Default Design and Development Procedure

I was wondering if anybody could send me a sample of their design and development procedure, or lead me to a place where I can find one. We are working on documenting ours, and I have an idea that we are doing everything that we need to do, I'm just having a terrible time trying to write this procedure!! I was just hoping to get some ideas of the wording that other companies used, to hopefully remove the writer's block. Thanks in advance for any help I can get! Becky
Reply With Quote

Sponsored Links
  #2  
Old 8th October 2002, 10:00 PM
energy
Unregistered Guest

 
Posts: n/a
Thumbs up Good luck

This is one of those requests that will be very difficult to get a reference to. You will get the text book example, but very few real life examples. Reason? Nobody is sure that what they have is suitable for others. They probably feel like they are whistling past the Graveyard. Especially with the new standard. Our Engineering VP says that we meet all the requirements. I asked about the recommended records required from ISO regarding the 6 sections of design. "Well, we don't have them, per say, but I can produce anything they want". Somehow, I do not get that warm and fuzzy feeling that all is well. So, I can't help you, either.
Good luck! I'll be watching with you.

Last edited by energy; 9th October 2002 at 12:27 PM.
Reply With Quote
Sponsored Links

  #3  
Old 9th October 2002, 03:14 AM
florin pirvulescu's Avatar
florin pirvulescu florin pirvulescu is offline
Involved - Posts

Registration Date: May 2002
Location: Europe, Romania, Bucharest
Age: 46
 
Posts: 33
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 31
Karma: 10
florin pirvulescu has less than 100 Karma points so far.
Send a message via MSN to florin pirvulescu Send a message via Yahoo to florin pirvulescu Send a message via Skype™ to florin pirvulescu
Default

I have faced the same problem in our company. There is no universal procedure suitable for everybody. Instead I can tell you from my experience. The problem is that the procedure has to fulfill two main condition: 1. compliance with the reqiurements of standard; and 2. suitability with the your own practice and needs. So:
a. at the beginning you don't know how detailed should document your activity. So try to organise your procedure according with the subclause of the standard (for instance "7.3.1 Planning of design and deveolpment" - define the document which state the stages of your design (Project Development Cycle or Desing Planning or however you name it) and don't forget to state also the review, verification and validation of each design stage, records and responsabilities.
b. define what are the inputs of you design and how you document them. Some of them are already documented so you need only the identify them (see the thread refering to the term "determination")
c. the same for outputs and so on.
Concluding try to adapt the standard requirements to your particular situation. Document what you do following the standard. Later on running your procedure, auditing it you will need to improve it and maybe to detail deeper.
Good luck!
Florin P.
Reply With Quote
  #4  
Old 9th October 2002, 12:35 PM
energy
Unregistered Guest

 
Posts: n/a
Laughing Fore sure

Quote:
florin pirvulescu said:

Concluding try to adapt the standard requirements to your particular situation. Document what you do following the standard. Later on running your procedure, auditing it you will need to improve it and maybe to detail deeper.
Good luck!
Florin P.
Absolutely. You can be sure that when this section is audited, the VP Engineering Director will have the honors of explaining all to the Auditors. We have a very extensive flow chart that shows all the design activities and records. They just don't match my vision of what the standard wants. The is no mention of "inputs" and "outputs". But they are there, according to the Director, just not broken down as the standard shows. But, hey, that's why he is the Director with the MBA. There is no doubt in my mind that we will have to do some modifications, down the road.
Reply With Quote
  #5  
Old 9th October 2002, 03:04 PM
Chickenlips Chickenlips is offline
Involved in Discussions

Registration Date: May 2002
Location: Wisconsin
Age: 38
 
Posts: 16
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 31
Karma: 10
Chickenlips has less than 100 Karma points so far.
Default

Can I use my process map to show some of the major steps in the design process? I started with a written procedure, and I'm having such a difficult time trying to cover the requirements of the standard, so I decided to go with the Process Map first. Does everything in the Process Map need to be in the written design control procedure?

Another question: With inputs to the design process, do we have to state those inputs in the procedure/map? There are a few inputs that would be standard for each design, such as Product Specifications, but some of the inputs listed as examples in the standard would be subjective according to the type of product that you are going to be designing. Can I just state in the procedure that design inputs are on a form that is filled out during the Conceptual phase?

Can you tell that I am new to the ISO9K2K? It's a very confusing standard. Thanks for the help!
Reply With Quote
  #6  
Old 9th October 2002, 03:25 PM
energy
Unregistered Guest

 
Posts: n/a
Cool I guess so

Chicken,

Your process map should show inputs and outputs by the direction of the arrows. At least, that's what I'm being told by Engineering and our Steering Committee also sees it that way, I guess. Our Engineering Quotation and Order Processing Flowcharts are huge. Somewhere in there, nestled in process blocks with different terminology is supposed to be 7.3.1 thru 7.3.7 of the standard. I had them open the standard and look at the requirements. "Well, it's all there, just not identified as such." We'll see.

Use your chart with an eye on identifying the clauses above for the average intelligent viewer and you may be good to go. JMHO
Reply With Quote
  #7  
Old 9th October 2002, 05:51 PM
Mike S. Mike S. is offline
An Early 'Cover'

Registration Date: Mar 2002
Location: East Coast US
 
Posts: 1,773
Thanks Given to Others: 24
Thanked 51 Times in 39 Posts
Karma Power: 103
Karma: 1849
Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.
Default

Chickenlips,

Don't feel bad, this is not the easiest thing in the world to do IMO -- making it suit the standard (and worse, suit the auditor!)and internal needs. Do a search -- I know there was a lengthy thread covering process maps, etc. recently, as I was one of those who was confused by all the opinions! If I have time I'll look and post the link -- if not do a search for something in the last few months. Good luck!
__________________
Mike S. ("Gun Nut")
And they ask me why I drink....
Reply With Quote
  #8  
Old 9th October 2002, 05:57 PM
Mike S. Mike S. is offline
An Early 'Cover'

Registration Date: Mar 2002
Location: East Coast US
 
Posts: 1,773
Thanks Given to Others: 24
Thanked 51 Times in 39 Posts
Karma Power: 103
Karma: 1849
Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.
Default

See if this helps -- lots of reading here!

ISO 9001 Quality Manual Organization and Structure including Numbering
__________________
Mike S. ("Gun Nut")
And they ask me why I drink....
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Design and Development - Process and Product

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Implement Clause 7.3 Design and Development procedure template example tech4arab ISO 9001 - Quality Management Systems Standard 5 11th June 2009 07:05 PM
Procedure for Design and Development in Construction MDWEEK Documentation Control Systems, Procedures, Forms and Templates 4 16th December 2007 11:56 AM
Design and development skills - No responsibility for product design and development shahshahani Design and Development - Process and Product 3 12th May 2006 04:20 PM
Seeking AS9100 B 7.3 Design and Development Procedure Examples KimLoree Design and Development - Process and Product 3 16th June 2005 10:06 AM
Design & Development - Exclusion of Clause 7.3.6 - Design and Development Validation khetar Design and Development - Process and Product 2 28th October 2003 12:12 PM



The time now is 08:48 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts