The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics > AQL - Acceptable Quality Level


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 16th October 2002, 02:48 PM
Norman V's Avatar
Norman V Norman V is offline
Be Audit You Can Be!

Registration Date: Jul 2001
Location: Philadelphia, PA
 
Posts: 30
Thanks Given to Others: 3
Thanked 0 Times in 0 Posts
Karma Power: 36
Karma: 130
Norman V is appreciated, and has over 100 Karma points.Norman V is appreciated, and has over 100 Karma points.
Please Help! Setting AQL (Acceptable Quality Level) on C=Zero inspections

Here's a general question:

We use a C=Zero sampling system for our incoming inspection, using "associated AQLs". What is the best way to determine which AQL to select for a particular part being inspected under this type of system? I have a Quality Engineer that wants to develop a set of "standard AQL levels" for each type of product being inspected.

For example: Rubber seals would always have an AQL of 1.0, nuts and bolts, 10.0, and so on.

Does anybody within the sound of my voice have any input into how this should be handled? We're trying hard not to be arbitrary.

Thanks.

Norman V.
Reply With Quote

Sponsored Links
  #2  
Old 16th October 2002, 03:03 PM
Bill Ryan's Avatar
Bill Ryan Bill Ryan is offline
Dogs rule

Registration Date: Jul 2002
Location: Madison, WI
Age: 56
 
Posts: 980
Thanks Given to Others: 15
Thanked 23 Times in 16 Posts
Karma Power: 69
Karma: 1002
Bill Ryan is appreciated, and has over 900 Karma points.Bill Ryan is appreciated, and has over 900 Karma points.Bill Ryan is appreciated, and has over 900 Karma points.Bill Ryan is appreciated, and has over 900 Karma points.Bill Ryan is appreciated, and has over 900 Karma points.Bill Ryan is appreciated, and has over 900 Karma points.Bill Ryan is appreciated, and has over 900 Karma points.Bill Ryan is appreciated, and has over 900 Karma points.
Default



Sorry, I've got a major disconnect going right now but I'm responding anyway (they say the first thing that goes.......).

I don't see how an AQL has anything to do with a C=0 "sampling plan". By definition, doesn't AQL imply defective/nonconforming parts are OK?

Bill
__________________
There is no psychiatrist in the world like a puppy licking your face. - Ben Williams
Reply With Quote
Sponsored Links

  #3  
Old 16th October 2002, 03:12 PM
Norman V's Avatar
Norman V Norman V is offline
Be Audit You Can Be!

Registration Date: Jul 2001
Location: Philadelphia, PA
 
Posts: 30
Thanks Given to Others: 3
Thanked 0 Times in 0 Posts
Karma Power: 36
Karma: 130
Norman V is appreciated, and has over 100 Karma points.Norman V is appreciated, and has over 100 Karma points.
Default Ok, let's clarify

In the traditional sense of AQL, (MIL-105-E), you are correct, AQL determines (among other things) how many rejects you can accept in a lot. In a C=Zero system, the "associated AQL" merely is used in a table to help you determine how many samples to pull based on lot size.

The AQL levels are "associated", because the Operating Characterisitic (OC) Curves would look about the same in terms of a percent defective for each AQL level, even though the acceptance number is Zero.

My main questions was, what is the best way to decide how to set the AQL level during the Quality Planning process, aside from just picking an AQL arbitrarily?


Thanks,

Norman V.
Reply With Quote
  #4  
Old 16th October 2002, 03:45 PM
Mike S. Mike S. is offline
An Early 'Cover'

Registration Date: Mar 2002
Location: East Coast US
 
Posts: 1,773
Thanks Given to Others: 24
Thanked 51 Times in 39 Posts
Karma Power: 103
Karma: 1849
Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.
Default

Since it is incoming inspection, I'd sit down with your internal customer(s) who will use each part and discuss it with them. Discuss what impact a defect will have on them - i.e. if there is 1% defective how would that affect you and downstream operations, etc. Also, what has been the incoming quality level in the past, and was it "acceptable" to them in the past. Also consider time of inspection, etc. Some will rant and rave and say no defect is ever "acceptable", but in the real world, IMO, zero defects is a pipe dream. JHO. Hope this helps.
__________________
Mike S. ("Gun Nut")
And they ask me why I drink....
Reply With Quote
  #5  
Old 16th October 2002, 05:35 PM
Craig H. Craig H. is offline
Been around a while

Registration Date: Jan 2002
Location: Southeastern USA
 
Posts: 1,995
Thanks Given to Others: 281
Thanked 266 Times in 211 Posts
Karma Power: 171
Karma: 5042
Craig H. is appreciated, and has over 1700 Karma points.
Craig H. is appreciated, and has over 1700 Karma points.Craig H. is appreciated, and has over 1700 Karma points.Craig H. is appreciated, and has over 1700 Karma points.Craig H. is appreciated, and has over 1700 Karma points.Craig H. is appreciated, and has over 1700 Karma points.Craig H. is appreciated, and has over 1700 Karma points.Craig H. is appreciated, and has over 1700 Karma points.Craig H. is appreciated, and has over 1700 Karma points.Craig H. is appreciated, and has over 1700 Karma points.Craig H. is appreciated, and has over 1700 Karma points.Craig H. is appreciated, and has over 1700 Karma points.Craig H. is appreciated, and has over 1700 Karma points.
Default

Hi

Dr Ken Stephens (Applied Acceptance Sampling, available through ASQ) gives the following steps:

1. Determine and list each quality characteristic
2. Determine the product unit.
3. Develop and specify the test method.
4. Determine the criteria for conformity.
5. Determine and list the calssification of nonconforming units or nonconformities and/or groups of nonconformities.
6. Establish an Index Quality Level (AOQL, etc).
7. Determine if sampling/acceptability should be based on lot inspection, on-line (continuous, etc.


I have excerpted here, and he goes on to more specifics. We used this textg for one of my classes at SPSU, and I can say that if you want to find out about acceptance sampling, this is the text.

The class was mind boggling.

Hope this helps.
Reply With Quote
  #6  
Old 17th October 2002, 12:52 PM
Norman V's Avatar
Norman V Norman V is offline
Be Audit You Can Be!

Registration Date: Jul 2001
Location: Philadelphia, PA
 
Posts: 30
Thanks Given to Others: 3
Thanked 0 Times in 0 Posts
Karma Power: 36
Karma: 130
Norman V is appreciated, and has over 100 Karma points.Norman V is appreciated, and has over 100 Karma points.
Default Mind Boggling?

Craig,

When you say "mind-boggling", do you mean that in a good way or a bad way?


Anyhow, I saw that book in the ASQ catalog, and it does look good. The CD ROM that accompanies it seem interesting as well.

Maybe I'll put it on my Christmas list.


Thanks,

Norman V.
Reply With Quote
  #7  
Old 17th October 2002, 01:03 PM
Craig H. Craig H. is offline
Been around a while

Registration Date: Jan 2002
Location: Southeastern USA
 
Posts: 1,995
Thanks Given to Others: 281
Thanked 266 Times in 211 Posts
Karma Power: 171
Karma: 5042
Craig H. is appreciated, and has over 1700 Karma points.
Craig H. is appreciated, and has over 1700 Karma points.Craig H. is appreciated, and has over 1700 Karma points.Craig H. is appreciated, and has over 1700 Karma points.Craig H. is appreciated, and has over 1700 Karma points.Craig H. is appreciated, and has over 1700 Karma points.Craig H. is appreciated, and has over 1700 Karma points.Craig H. is appreciated, and has over 1700 Karma points.Craig H. is appreciated, and has over 1700 Karma points.Craig H. is appreciated, and has over 1700 Karma points.Craig H. is appreciated, and has over 1700 Karma points.Craig H. is appreciated, and has over 1700 Karma points.Craig H. is appreciated, and has over 1700 Karma points.
Default

Norman:

Mind boggling in both a good and bad way, really.

Before this class, I assumed that Dr. Deming ment that inspection was bad. Not so. What he said, and ment, was that DEPENDANCE on inspection for quality is bad. We still inspect, but our process is such that we don't make bad stuff.

In a bad way, we actually designed acceptance sampling plans - those are some of the major files on the CD. Not for those with less-than-complete statistical backgrounds, IMHO. The class was the most difficult in the SPSU Master's program. We used the draft for Dr. Stephen's book, and he taught the class (online). He is retired now, but his list of publications is impressive, and this particular book is highly recommended.
Reply With Quote
  #8  
Old 17th October 2002, 01:25 PM
Douglas E. Purdy Douglas E. Purdy is offline
Courtesy Access

Registration Date: Apr 2002
Location: Lombard, IL
 
Posts: 508
Thanks Given to Others: 10
Thanked 41 Times in 24 Posts
Karma Power: 58
Douglas E. Purdy has disabled his/her Karma.
Default

But the question still has not been answered, unless it is in The BOOK? I believe the act of deciding is a step (#6), but are there any generally accepted parameters in making that decision, OR do we have to read the book?
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics > AQL - Acceptable Quality Level

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Problem with AQL (Acceptable Quality Level) damienbechaux AQL - Acceptable Quality Level 9 5th August 2009 07:04 PM
AQL - How do I find Acceptable Quality Level? qmslady AQL - Acceptable Quality Level 72 8th June 2009 05:07 PM
AQL - Acceptable (Assured) Quality Level Marc Definitions, Acronyms, Abbreviations and Interpretations 0 29th December 2005 02:44 AM
AQL (Acceptable Quality Level) vs. IRR (Initial Reliability Requirement) kimmi AQL - Acceptable Quality Level 5 19th May 2003 10:24 AM
AQL (Acceptable Quality Level) vs. PPM (Parts per Million) - Equivalences? Marc AQL - Acceptable Quality Level 16 20th June 2002 04:19 PM



The time now is 11:41 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts