The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 9001 - Quality Management Systems Standard > ISO 9001:1994


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
 
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 17th May 1999, 07:07 PM
jgeisler
Unregistered Guest

 
Posts: n/a
Default Quality in Job Shop Environment

I have been speaking with a company that for a number of years has been designing and manufacturing products for the aerospace industry in a "job shop" type of environment. They have very little documentation, no SPC, very little metrics or measurement, no formal quality system, etc. While they have been profitable and successful for a number of years, they are finding that the "job shop" method of operation is no longer adequate. They are looking to set up structures and documentation, measurement, formal corrective and preventive processes, etc. with the eventual goal of ISO 9001 certification. MY QUESTION--does anyone know of any literature, books, or have personal knowledge of implementing ISO in a short run, varied product, job shop environment? Any and all responses will be appreciated.

Thanks.

Jim G.

Sponsored Links
  #2  
Old 18th May 1999, 11:58 AM
Kevin Mader's Avatar
Kevin Mader Kevin Mader is offline
One of THE Original Covers!

Registration Date: Nov 1998
Location: Wallingford, CT USA
Age: 43
 
Posts: 1,158
Thanks Given to Others: 22
Thanked 63 Times in 43 Posts
Karma Power: 94
Karma: 1335
Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.
Send a message via AIM to Kevin Mader
Default

Jim,

I believe that the size of the company matters little for Quality practices. In implementing ISO, long or short runs also matter little. What I have found to be the largest hurdle to get over is maintaining independence through out the System (ie inspection, auditing). With folks wearing the multiple hats, sometimes it is difficult to maintain independence (production is doing their own inspection). In this case, you need to tailor the program to show objectivity or adopt a process control program for example.

Regards,

Kevin

Back to the group....
Sponsored Links

  #3  
Old 18th May 1999, 02:59 PM
Don Winton's Avatar
Don Winton Don Winton is offline
dWizard

Registration Date: Nov 1998
Location: Tullahoma, TN
Age: 53
 
Posts: 475
Thanks Given to Others: 0
Thanked 12 Times in 9 Posts
Karma Power: 63
Karma: 488
Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.
Default

From your description, it sounds as if management is doing the right thing for the right reason. That is a fortunate start to which some of us would envy. Kevin brings up good points, to which I for the most part agree.

Quote:
…have personal knowledge of implementing ISO in a short run, varied product, job shop environment?
My current firm is 25, previous firm was approximately 42. The current firm could best be described as 'production' in a 'job shop environment.' The product is the same, but manufacturing methodology is job shop based. Production (such as it is) is approximately 20 per week. I do not know if that qualifies me, but here goes.

When I first began this particular assignment, I realized immediately that one key was to establish a system that was not bureaucratic and 'paper' heavy. For this, I kept 4.2.2 as a guidepost, which states, in part:

For purposes of this American National Standard, the range and detail of the procedures that form part of the quality system depend on the complexity of the work, the methods used, and the skills and training needed by personnel involved in carrying out the activity.

I have kept paperwork to a minimum (i.e. I do not need paper to move product, I have no work orders, etc). Master technicians do not need work instructions for each and every operation they perform through the 'skills and training' portion. The 'range and detail' of my documents describe the operation as it exists, but does not elaborate further. For example, I do not describe 'how' to strip and prep a wire, I say "strip and prep wire." Master Machinists do not need to be told 'how' to make 150 widgets. Give them a drawing and say 'I need 150 of these.' Little things like that go a long way to employee and management 'buy in.'

Another thing I have emphasized is that ISO 900x says 'what to do' but does not say 'how to do it.' I explained from the onset that the standard was a 'slave,' we were the 'master' and incorporated this in all my training sessions. Every employee, from the President on down has had my ISO training so they understand that ISO was not going to be burdensome and cumbersome. Twenty percent of employees have had my one-week training session, including the two Vice Presidents.

I would also suggest that every employee be involved in the implementation phase. I asked the employees here which work instructions they needed or wanted, then asked that they write them based on their method of operation. I then translated that into the Quality Management System I was setting up. This way, they felt they were part of the system, not some system that was being thrust upon them. They now freely point out to me when an operation is lacking in documentation or when documentation is questionable because they are part of the system.

I would also one other piece of advise as far as ISO 900x goes: Do not read in what is not there. The system must be suited to your method of operation and add value to your organization. The example I usually cite is SPC. Most believe that because of 4.20, some sort of SPC is required and that simply is not true. If SPC adds value, use it. If not, do not.

Hope this helps.

Quote:
production is doing their own inspection
Kevin, I am curious. Why is this a problem?

Regards,
Don

------------------
Just the ramblings of an Old Wizard Warrior.

Check Out dWizard's Lair:
www.ficom.net/members/donwinton/home.html


  #4  
Old 18th May 1999, 04:08 PM
Kevin Mader's Avatar
Kevin Mader Kevin Mader is offline
One of THE Original Covers!

Registration Date: Nov 1998
Location: Wallingford, CT USA
Age: 43
 
Posts: 1,158
Thanks Given to Others: 22
Thanked 63 Times in 43 Posts
Karma Power: 94
Karma: 1335
Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.
Send a message via AIM to Kevin Mader
Default

Don,

I knew you would catch that (hehehe)! There is no problem with production doing their own inspection. In fact, I would suggest that this be done (folks take responsibility for the quality of product) as folks building quality into a product is value added. There isn't any money in doing inspection I might add (unless that is your business). I made this statement based on the traditional paradigms that many fall prey too, including registrars.

Unless the organization exudes a "Quality Consciousness", in my experience the registrar looks towards traditional inspection scenarios (he makes it, she inspects it, hence, independence). The same is true and perhaps more clearly stated about auditing (although most of us agree objectivity is perhaps a more necessary item). So far, I would have to say that independence wins over objectivity with a registrar more times than not (perhaps it is easier to differentiate or prove). Without the sound Quality culture, I would advise towards giving the registrar what they are use to seeing, and perhaps even expecting. Yeah, not great advice and even a bit hipocritical of me I think, and perhaps I should recant. Maybe I'll claim a touch of the Western Philosophy flu? Bad me, bad me!

Regards,

Kevin

p.s. In our system, production is responsible for doing quality checks. Yee gads, even more hipocritical of me!
  #5  
Old 19th May 1999, 11:56 AM
Don Winton's Avatar
Don Winton Don Winton is offline
dWizard

Registration Date: Nov 1998
Location: Tullahoma, TN
Age: 53
 
Posts: 475
Thanks Given to Others: 0
Thanked 12 Times in 9 Posts
Karma Power: 63
Karma: 488
Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.
Default

Quote:
There is no problem with production doing their own inspection.
I thought so, just checking.

Quote:
…in my experience the registrar looks towards traditional inspection scenarios (he makes it, she inspects it, hence, independence).
I agree that registrars have this tendency. I would question the training and background of the assessor(s) in this case. A word search of ISO 900x finds the word 'independent' once (4.17) and 'independence' not at all.

With this tendency to look for independence in inspection, I explicitly gave employees the right to inspect their own work in the level two procedures for Clause 4.10. The level two documents for Clause 4.13 also give employees limited authority for the disposition of nonconforming product. I did this in accordance with Clause 4.2.2 (which, BTW, is probably the most overlooked and underutilized clause in the entire document).

Regards,
Don

------------------
Just the ramblings of an Old Wizard Warrior.

Check Out dWizard's Lair:
www.ficom.net/members/donwinton/home.html


  #6  
Old 19th May 1999, 04:13 PM
Kevin Mader's Avatar
Kevin Mader Kevin Mader is offline
One of THE Original Covers!

Registration Date: Nov 1998
Location: Wallingford, CT USA
Age: 43
 
Posts: 1,158
Thanks Given to Others: 22
Thanked 63 Times in 43 Posts
Karma Power: 94
Karma: 1335
Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.
Send a message via AIM to Kevin Mader
Default

Don,

Agreed. I find it funny that in some 'canned' working papers for internal audits I have seen wording like "Is inspection being performed by someone independent of the work being done?". Perhaps this may be where the "independence" thing comes into play? While the answer is either yes or no, neither more correct than the other, I believe the implied answer may lead one to think that independence is a necessary item. Again, this is reading between the lines, but how many folks reach this conclusion? Interesting. Assessors need to keep an open mind on this, but often this needs to be explained. I have done so with both what I consider good and bad registrars. Granted, no one person can know it all. Funny how you need to know the auditor and what level he or she operates on. This could play a vital role during an audit (which in itself is probably deserving of it own topic).

Regards,

Kevin

p.s. I have sent a few folks to check out the 'Circular Thinking Venn Diagram' at your page. Many positive comments.
  #7  
Old 19th May 1999, 04:53 PM
Don Winton's Avatar
Don Winton Don Winton is offline
dWizard

Registration Date: Nov 1998
Location: Tullahoma, TN
Age: 53
 
Posts: 475
Thanks Given to Others: 0
Thanked 12 Times in 9 Posts
Karma Power: 63
Karma: 488
Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.
Default

Quote:
I have sent a few folks to check out the 'Circular Thinking Venn Diagram' at your page. Many positive comments.
Thanks.

Regards,
Don
 

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 9001 - Quality Management Systems Standard > ISO 9001:1994

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
SPC on the shop floor - We are a job shop CMfgT SPC Monitoring and Statistical Analysis Techniques 5 1st October 2008 02:28 PM
Outgoing Quality for a Material Handling Systems Job Shop Bill Rudnicki Misc. Quality Assurance and Business Systems Related Topics 3 20th November 2006 02:20 PM
SPC in job shop? CNC machine producing a max of 50 pieces per job pradeepm SPC Monitoring and Statistical Analysis Techniques 4 4th November 2005 10:52 AM
Workmanship Standard that I can use as a procedure in a job shop environment? George Trybulski Documentation Control Systems, Procedures, Forms and Templates 6 15th August 2000 05:44 AM



The time now is 04:09 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts