The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 5th November 2002, 08:22 PM
Monya1 Monya1 is offline
Inactive Registered Visitor

Registration Date: Nov 2002
Location: Indiana
 
Posts: 2
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 29
Karma: 10
Monya1 has less than 100 Karma points so far.
Question In-Process Inspection Data?? How Much?

Our company is currently developing processes and subsequent documentation for ISO9000 / 2000 (9002) and I am needing clarification about in-process inspection data collection requirements. We are a sheet metal fabrication facility.

When the operator performs in-process inspections, based on critical dimensions as defined by engineering and specified intervals, does the operator have to document the readings they take or can they simply check OK if the measurments conform to the required tolerances? If the dimensions fail inspection then we would have the operator document their readings and what they did to get the process under control.

On first piece we also have the QA Tech inspect the part and sign the Shop Traveler for each operation. QA tech does not record his readings unless we are required to do so by the customer on a First Article Inspection form.

Hope this is not too lengthy or confusing. Thanks for any help you can offer.

Mona
__________________
Mona
Reply With Quote

Sponsored Links
  #2  
Old 6th November 2002, 09:25 AM
energy
Unregistered Guest

 
Posts: n/a
Hehehe... Traveler may be enough.

Monya,

I spent 18 months in a sheet metal fabricating facility. They were not certified, but were working to AS9000 requirements, as well as Aircraft Specifications patterned after AS9000. They used the Traveler as their Quality Plan. Like yours, every step of the process was defined with Inspection points, First Piece verification, drawings, procedures, etc.. A few Customer Auditors questioned this practice. They were told, quite simply, this is how we operate. case closed.
Having said that, Final Inspection required a full blown 100% Inspection, (sample) with readings recorded. The Customer Auditor also performed his/her own inspection on the sample. I believe the main reason to record readings/measurements is to insure that the Inspector actually does all the inspection required. To allow a check mark on the dimension shown on a document may be seen as too easy for someone to skip a step. If your traveler is large enough you may be able to record actual dimensions, but it may get lost. Then what happens? It happened a few times where people spent hours looking for a traveler that had fallen off or had been taken off. You must have an Inspection Group. Have your Engineer decide critical dimensions, record those measurements and initial/date the drawing. Keep that drawing right up to Final Inspection and you are there. JMHO
Welcome to the Cove
Reply With Quote
Sponsored Links

  #3  
Old 6th November 2002, 12:57 PM
Monya1 Monya1 is offline
Inactive Registered Visitor

Registration Date: Nov 2002
Location: Indiana
 
Posts: 2
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 29
Karma: 10
Monya1 has less than 100 Karma points so far.
BIG Smile Thanks

Thanks Energy for your reply. We do most of the things you mentioned.

Mona
__________________
Mona
Reply With Quote
  #4  
Old 6th November 2002, 04:09 PM
M Greenaway's Avatar
M Greenaway M Greenaway is offline
Courtesy Access

Registration Date: Dec 2001
Location: England
 
Posts: 1,643
Thanks Given to Others: 10
Thanked 63 Times in 44 Posts
Karma Power: 80
Karma: 794
M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.
Default

Monya

I agree with energy that getting the operator to record an actual measured size does help in avoiding the inspection getting missed, or a cursory sign off by ticking a box without actually doing the check.

Also you might consider that if this data was recorded you could actually use it to statistically analyse the capability and performance of your process, which can be very a very useful tool.

If you do not need any of this then there is nothing to say you have to record the measured size, you could then consider that you were performing an attribute check (even though measurement was taken).
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Process Data Tools - Search for examples Process Data (Prozessdatenblatt) Qualygirl Process Audits and Layered Process Audits 1 21st March 2009 11:34 AM
Don Wheeler article on MSA - Good Data, Bad Data and Process Behavior Charts Miner Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 7 26th March 2008 09:00 AM
Simpler Method of Recording In-Process Inspection Data - Machine Shop jdafw Inspection and Test, Sampling and Related Topics 1 11th November 2007 01:43 AM
Process Control Plan and Inspection Plans - Receiving and final inspection required? krishkaar Inspection and Test, Sampling and Related Topics 8 3rd November 2004 07:46 AM
Guidelines for in-process inspection of PCB repairs:Changing from end-item inspection The Fixer Inspection and Test, Sampling and Related Topics 7 29th February 2000 09:47 PM



The time now is 05:15 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts