|
Elsmar Cove Forum Sidebar
|
|
|
|
Monitor the Elsmar Forum
|
| Monitor New Forum Posts
|
|
Follow Marc & Elsmar
|
|
|
Elsmar Cove Groups
|
|
|
Sponsor Links
|
|
|
|
|
|
Donate and $ Contributor Forum Access
|
 |
|
Sponsored Links
|
|
|
|
Courtesy Quick Links
|
 Links that Elsmar Cove visitors will find useful in your quest for knowledge:
Howard's International Quality Services
Atul's Symphony Technologies
Marcelo Antunes' SQR Consulting
Bob Doering's Correct SPC - Precision Machining
NIST's Engineering Statistics Handbook
IRCA - International Register of Certified Auditors
SAE - Society of Automotive Engineers
Quality Digest Portal
IEST - Institute of Environmental Sciences and Technology
ASQ - American Society for Quality
|
|
 |

13th November 2002, 02:33 PM
|
 |
Metal Bob
Registration Date: Oct 2002
Location: Bourbonnais, IL - South of Chicago
Age: 39
|
|
Posts: 351
Thanks Given to Others: 1
Thanked 6 Times in 4 Posts
Karma Power: 78
|
|
Looking for PPAP help for newbie
OK small company, ISO 9001:1994 upgrading to 2000, inexperienced Quality person (me), little to no budget, no copy of PPAP manual (that I know of), one major customer that is QS and requires PPAPs.
Besides combing thru all the posts here  can anyone point me to some beginners info for PPAP processing and submissions (preferably for free).
Our company and I have submitted some simple level 1 and 2 PPAPs. I basically copied the work our last QA guy did.
We just got a Level 3 PPAP for a simple part we make out of basic steel. The new part is the same except it now is spring steel.
I will probably call the customer and verify what info they want/need today or tommorrow.
On paper the PPAP states:
Level 3 - Warrant with product samples and complete supporting data submitted to customer
Retention/Submission Requirements: 1,2,3,4,5,6,7,8,9,10,11,12,13,14,16,19
I know how to do part layouts, control plans, inspection reports, Gage R&R, and we have software to verify the cpk stuff (?).
But what is this retention/submission stuff?????
I'm at a loss.
Any specific or general help will be greatly appreciated.
|

13th November 2002, 03:17 PM
|
 |
VINI, VIDI, DORMIVI
Registration Date: Feb 2002
Location: Walled Lake, Michigan
|
|
Posts: 1,153
Thanks Given to Others: 20
Thanked 89 Times in 58 Posts
Karma Power: 164
|
|
|
Need a book!
Bob,
Can you get a copy of the manual??? On page 16 there is table I.4.1 that sets up what you have to retain on site (ready for review) and what you have to submit. It is just too big to reproduce here and I don't have an electronic copy of the table to send. But in a nut shell, level 3 PPAPs you submit everything except proprietary components, Master Samples (must be controlled) and check Aids.
__________________
"What this country needs is more unemployed politicians." Edward Langley
|

13th November 2002, 03:56 PM
|
 |
Inactive Registered Visitor
Registration Date: Sep 2002
Location: St. Thomas, ON, Canada
|
|
Posts: 22
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 46 Karma: 10 
|
|
Bob,
You can order the manual through www.aiag.org, if you can't find a copy of it laying around. The current revision is the 3rd Edition.
The thing to remember about PPAP's is that you are required to do all the applicable requirements (Items 1-19). The only difference between the submission levels is what you submit to your customer and what you retain for review, if requested.
__________________
Mark R. Raymond
:cool:
"It's a fact that the more you know about something, the greater your interest and enthusiasm."
G. S. Patton, Jr.
|

13th November 2002, 04:44 PM
|
 |
Metal Bob
Registration Date: Oct 2002
Location: Bourbonnais, IL - South of Chicago
Age: 39
|
|
Posts: 351
Thanks Given to Others: 1
Thanked 6 Times in 4 Posts
Karma Power: 78
|
|
|
Re: Need a book!
Quote:
Randy Stewart said:
Bob,
Can you get a copy of the manual??? On page 16 there is table I.4.1 that sets up what you have to retain on site (ready for review) and what you have to submit. It is just too big to reproduce here and I don't have an electronic copy of the table to send. But in a nut shell, level 3 PPAPs you submit everything except proprietary components, Master Samples (must be controlled) and check Aids.
|
Considering the non-member price is only $36 I probably CAN get it...
Can someone sum up what the items I listed are...
Retention/Submission Requirements: 1,2,3,4,5,6,7,8,9,10,11,12,13,14,16,19
I realize this is most of them... 
Considering my lack of knowledge of FEMAs and similar items, I have a feeling this PPAP package is gonna be a pain to complete.
Considering THIS part is a round/flat washer i think the excessive work i'm about to do, is just that EXCESSIVE.
(Like I don't have enough to do
 )
|

14th November 2002, 07:36 AM
|
 |
Inactive Registered Visitor
Registration Date: Sep 2002
Location: St. Thomas, ON, Canada
|
|
Posts: 22
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 46 Karma: 10 
|
|
|
I am probably not allowed to do this but...
I can email you a scanned copy of Table I.4.1, if you like or do you already have that and now need a brief description of each?
I don't think this will be that excessive. Most of the items in the table you will probably have anyway (Design record, ECN's, etc.). Some of the items that you will need to provide (FMEA, Control Plan, etc.) will be very small due to the nature of your product. I would imagine that you could get all the items into a duo-tang.
Email me if you want the scanned copy of the table.
Good luck.
__________________
Mark R. Raymond
:cool:
"It's a fact that the more you know about something, the greater your interest and enthusiasm."
G. S. Patton, Jr.
|

14th November 2002, 08:45 AM
|
 |
Metal Bob
Registration Date: Oct 2002
Location: Bourbonnais, IL - South of Chicago
Age: 39
|
|
Posts: 351
Thanks Given to Others: 1
Thanked 6 Times in 4 Posts
Karma Power: 78
|
|
I would appreciate a copy of the table.
I do believe we have most if not all of the FORMS that I will need for a full blown out Level 3 PPAP. (Control Plans, Inspection Records, ECN forms, FMEA, etc).
We even have some SPC software so I can plug in numbers and get the CPK stuff.
Besides not having the "required" manuals, I personally don't have the experience with the FMEA and CPK stuff.
Oh and we did not design this part, simply given a print which we quoted against (existing die new material, new thickness).
Hopefully between checking out the COVE and talking with our last Quality Guy I can stumble through this. (Probably gonna have a few more similar ones soon  )
Thanks Bob_M
|

14th November 2002, 11:10 AM
|
 |
VINI, VIDI, DORMIVI
Registration Date: Feb 2002
Location: Walled Lake, Michigan
|
|
Posts: 1,153
Thanks Given to Others: 20
Thanked 89 Times in 58 Posts
Karma Power: 164
|
|
Relax
Bob,
Your FMEA should be simple. Keep it brief and to the point. Depending on what it takes to produce one washer it could be as simple as 1 page with 5 entries on it. Receive raw material, form, heat treat (?), inspect, ship.
See if the attached table helps.
__________________
"What this country needs is more unemployed politicians." Edward Langley
|
Lower Navigation Bar
|
|
|
Do you find this discussion thread helpful and informational?
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Forum Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|