The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 9001 - Quality Management Systems Standard > ISO 9001:1994


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
 
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 27th July 1999, 06:12 AM
Bill Edwards
Unregistered Guest

 
Posts: n/a
Research & Development

We're developing an upgraded satellite-relay controlled sensor system for DoD, with the system enclosed in a transportable shelter. We also have a small testbed within our building, consisting of two standard 19" wide electronic equipment racks. The intention is incorporating a different LAN distribution system in the transportable system, using the testbed as a "proof of concept" evaluation tool. We're in the process of implementing ISO9000/9001/900* under the guidance of our QA wizard. His issue is that we don't have schematics or working drawings for what we're doing (or trying to do) on the testbed, even though the design is based on the working system in the transportable shelter. It's been explained that we're using the existing design and "red-lining" the changes as we develope the new LAN system (which requires re-wiring a great number of connections over the previous LAN system). We are still working out the particulars for the new system, but as he interprets ISO9000 we need a working drawing before we do anything, so we've been shut down. How the Hell am I supposed to develop anything if I can't even activate the equipment to explore how it operates, let alone integrate it with the rest of the system? What's in ISO9000 that will allow me to produce this system under Research and Development (which is what we're doing), or is this a real-world Dilbert situation?

Sponsored Links
  #2  
Old 27th July 1999, 03:04 PM
Randy's Avatar
Randy Randy is offline
Super Moderator

Registration Date: Jun 1999
Location: Greenwood (Ft Smith area), Arkansas, USA
Age: 58
 
Posts: 6,224
Thanks Given to Others: 33
Thanked 1,248 Times in 807 Posts
Karma Power: 397
Karma: 11534
Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.
Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.
Send a message via Skype™ to Randy
Question

I'm a 14000 guru and not a 9000 one but i have been doing 9000 internal for about 2 years so I'll give it a shot.

4.4 Design control seems to allow quite a bit of lattitude in how an organization conducts it's product development. It seems to me that if you establish some type of scheduled oversight period, maintain good documentation of the steps being taken with the results + and -, and possibly map out courses of action to be taken, you might be ok.

The standard was not meant to hinder or stop productivity, but to insure the quality of it (my reading).

Maybe too much is being read into it at you location.

Then again I could be wrong across the board.
Sponsored Links

  #3  
Old 27th July 1999, 04:30 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,852
Thanks Given to Others: 1,892
Thanked 1,563 Times in 1,016 Posts
Blog Entries: 4
Karma Power: 604
Karma: 11544
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Randy is correct. Your 'wizard' may want to shoot me, but you can do what you want as long as your system supports it. It is quite common for a company to take an existing design and 'redline'. The standard only requires that you have a defined design 'system' with design reviews at 'appropriate' stages (may only be 1 stage in some companies). There is absolutely no requirement for you to have a schmatic or working drawing until you reach the late stages of the design phase where you are past prototype (which is what it sounds like you are doing). You DO have to record what you're doing. Some companies just have engineering notebooks

Read 4.4 for your self. Then ask your local 'guru' where it says "...a company must have schematics or working drawings for what they're doing (or trying to do) on the testbed during the early stages of the process." It doesn't say that. Period.
  #4  
Old 30th July 1999, 07:45 AM
Lassitude
Unregistered Guest

 
Posts: n/a
Yin Yang

Since you're into design, you might want to take a look at Elsmar.com/ubb/Forum4/HTML/000084.html
  #5  
Old 30th July 1999, 08:14 AM
Steph
Unregistered Guest

 
Posts: n/a
Question

Bill,

Just out of curiousity, is your company registered to any quality standard yet? My company is strictly R&D and I have come across a few people in upper management that do not see the benefit of what I'm doing. They also have me chopping out large sections because "they do not apply".
 

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 9001 - Quality Management Systems Standard > ISO 9001:1994

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Research vs. Design vs. Development in ISO 13485 - What is the difference? DRDDO Design and Development - Process and Product 4 5th May 2008 02:09 PM
Metrics Identification - Storage, Research and Development and HR Tanahy ISO 9001 - Quality Management Systems Standard 4 22nd July 2004 01:37 PM
R&D (Research & Development) Department - Off-site brain trust Jgryn ISO/TS 16949 - International Automotive Quality Systems Standard 1 23rd September 2003 12:35 PM
Research and Development Procss - Where does research end and development begin? mshell Misc. Quality Assurance and Business Systems Related Topics 15 18th September 2003 05:03 PM
Laboratory Scope - Research and Development Labs - Do we need 2 Scopes? Robert Raymond QS-9000 - American Automotive Manufacturers Standard 6 16th March 2000 11:38 PM



The time now is 10:01 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts