The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 17025 - Calibration, Measurement Gages and Test Laboratories > Calibration Frequency (Interval)


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 13th November 2002, 06:22 PM
Dave Hiser Dave Hiser is offline
Inactive Registered Visitor

Registration Date: Nov 2002
Location: michigan
Age: 49
 
Posts: 2
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 29
Karma: 10
Dave Hiser has less than 100 Karma points so far.
Read This! Gage calibration intervals

The calibration intervals where I work were recently changed to allow somes gages to be increased from 360 days to 1080 and 720 days. This was done in secrecy by a few of the bosses cronies. Of the 1200+ gages in our control about 30% were given increased intervals. Management was able to do this due to the lack of documentation when most of the breakdowns, adjustments, and servicing to the equipment are not documented. The procedures in our lab were old and not the revised electronically controlled ones. Some of the staff were not told of the updates in the procedures, either. My question is "Do we or can you base gage calibration intervals based only on degree of usage, and leave out environment, measurement uncertainty, stability, etc. Oh, we also never perform GR&R's. Is there something in the 17025 Guide that I can use to substantiate my claim this was not done correctly, and needs to be rectified?
Reply With Quote

Sponsored Links
  #2  
Old 13th November 2002, 07:19 PM
Jimmy Olson Jimmy Olson is offline
E-Mails Invalid or Rejected

Registration Date: Jul 2002
Location: WA
 
Posts: 331
Thanks Given to Others: 0
Thanked 5 Times in 5 Posts
Karma Power: 0
Karma: 226
Jimmy Olson is appreciated, and has over 200 Karma points.Jimmy Olson is appreciated, and has over 200 Karma points.Jimmy Olson is appreciated, and has over 200 Karma points.
Default

Hi Dave. Welcome to the Cove.

As far as I know there is nothing in 17025 that specifies anything about the intervals or how they should be adjusted or anything related (sorry). For the most part, it's up to you to decide what to set your intervals and you can base that on whatever you like. Technically speaking, what you management did is acceptable. That doesn't mean it's a good idea though.

I've known several companies that have based their intervals on the frequency of use, but still take other factos into consideration. You may want to consider the manufacturers reccomendation and show that to the managers. Another possibility to consider to change their minds is look at how the gages are stored. If they are being stored on a production floor where they are subject to being abused (even thought they aren't use), then pushing the interval to long would definately be a bad idea.

If you subcontract your calibration, that is probably one factor the managers thought of. They probably figured the less something is calibrated, the less it costs. You could do a comparison of the cost of calibration to the cost of repair or replacement.

I guess I'll stop rambling on. I hope this helps somewhat. Someone else might be able to find something in writing that you can use. If you have access to any of the NCSL publications, try looking through NCSL RP-1 "Establishment & Adjustment of Calibration Intervals" for something that you can use. Good luck.
Reply With Quote
Sponsored Links

  #3  
Old 13th November 2002, 10:05 PM
Graeme's Avatar
Graeme Graeme is offline
$ Contributor

Registration Date: Sep 2000
Location: Lilburn, GA, USA
Age: 60
 
Posts: 401
Thanks Given to Others: 0
Thanked 8 Times in 7 Posts
Karma Power: 63
Karma: 894
Graeme is appreciated, and has over 700 Karma points.Graeme is appreciated, and has over 700 Karma points.Graeme is appreciated, and has over 700 Karma points.Graeme is appreciated, and has over 700 Karma points.Graeme is appreciated, and has over 700 Karma points.Graeme is appreciated, and has over 700 Karma points.Graeme is appreciated, and has over 700 Karma points.
Send a message via AIM to Graeme Send a message via MSN to Graeme Send a message via Yahoo to Graeme
Spin!

Dave,

To carry on from what Richard said ... at the very least, top management needs to improve (start?) communication so that there is knowledge and understanding of policy and procedures at all appropriate levels of the staff.

Of course, as an ex-government type, I have seen organizations where it was believed to be not appropriate for workers to know what they were supposed to be doing ... put your lunchbox and brain in the locker by the door, and enter the mushroom caves.

I am not sure from your initial message where your work fits into the organization, but I will assume that you are in an in-house calibration lab. In that situation, then ISO/IEC 17025 requires an effective calibration program for the laboratory calibration standards. The workload items - the calibrated things used in the rest of the organization - would be controlled under the organization's overall quality management system. In ISO 9001:2000 that is under clause 7.6 'Control of measuring and monitoring devices'. This is one of those sections where specific actions and records are identified as required, but the need for a documented procedure is only implied.

What is the purpose of analyzing and adjusting calibration intervals?
Even the most casual reading of NCSL RP-1 will reveal that the intended purpose of analyzing calibration intervals - and adjusting them if needed - is to provide some level of assurance that the instruments are still performing as intended (in tolerance) at the end of the time period. The level of assurance must be determined by your company. What does top management believe is an acceptable and economic risk for using an instrument that is out of tolerance?

Costs of using out of tolerance instruments are varied and depend somewhat on your industry. They can include product recalls, excess warranty claims, or problems that affect the public health or (in my business) safety. All of these might involve lawyers and corporate liability. Those costs can be managed by calibrating more frequently to achieve a higher end-of-period in-tolerance rate, but that costs money as well. There are also other risks associated with calibrating too frequently, such as higher inventory to cover out of service instruments, or more qualified technicians needed to do the work. Some also believe you are getting close to the process tampering that Deming warns against.

But, balancing cost and risk is one of the things that top management is supposed to be doing, isn't it?
__________________
Graeme C. Payne
ASQ Sr. Member; CQE; CCT

"Does it matter if the measurement result is wrong?
If it does, then calibrate the instrument.
If it doesn't matter, they why are you making the measurement?"
(P. G. Stein, 2000)
Reply With Quote
  #4  
Old 14th November 2002, 11:21 AM
Jerry Eldred's Avatar
Jerry Eldred Jerry Eldred is offline
Forum Moderator

Registration Date: Dec 1999
Location: Texas
 
Posts: 411
Thanks Given to Others: 0
Thanked 118 Times in 70 Posts
Karma Power: 89
Karma: 2042
Jerry Eldred is appreciated, and has over 1700 Karma points.Jerry Eldred is appreciated, and has over 1700 Karma points.Jerry Eldred is appreciated, and has over 1700 Karma points.Jerry Eldred is appreciated, and has over 1700 Karma points.Jerry Eldred is appreciated, and has over 1700 Karma points.Jerry Eldred is appreciated, and has over 1700 Karma points.Jerry Eldred is appreciated, and has over 1700 Karma points.Jerry Eldred is appreciated, and has over 1700 Karma points.Jerry Eldred is appreciated, and has over 1700 Karma points.Jerry Eldred is appreciated, and has over 1700 Karma points.Jerry Eldred is appreciated, and has over 1700 Karma points.Jerry Eldred is appreciated, and has over 1700 Karma points.
Default

About all I can do is repeat what has already been said....

FIrst of all, as one who has been in the MIL-STD-45662A, Z540, 17025, ISO9000, QS9000 and other worlds, I would be generally disturbed at any arbitrary changing of calibration intervals.

I agree that NCSL RP-1 could be a good attack point. I believe it is possible that the management doesn't understand what a calibration interval really is. Forget all of the standards (above). Even forget about RP-1 for a moment. The calibration interval is the period of time, to within some confidence level that an instrument may be expected to remain within specified tolerances. Therefore, you set an interval based on the degree of confidence you desire. If the interval of a unit is 360 days, that is the period of time that meets that criteria. After gathering historical data, you may determine that interval is too short or too long. But regardless, the definition of a calibration interval has not changed.

So when that interval is arbitrarily changed by anyone, their action by definition (still forgetting the standards documents), says that they implicitly believe they can maintain an acceptable confidence that the measurements will remain in tolerance for the entire new calibration interval. The question I would pose if I were there (and this does get my dander up a bit - having been in the business more than 25 years) would be in the area of confidence in the measurements. Based on the increased interval, do they believe they will maintain an acceptable confidence that the measurements will remain in tolerance?

Moving on to the other aspects of the questions....

To adjust intervals based on degree of usage means you need to assign intervals by individual units. That means each unit must have it's in-tolerance history reviewed and intervals adjusted for that unit. The degree of usage still requires you have some statistical basis for establishment or adjustment of the interval. You need to define what "degree of usage" is, establish a one to one relationship between an amount of usage and a probability that the unit will remain in tolerance for a specified amount of usage, then adjust intervals based on that.

I know many companies are looking for ways to squeeze costs. In my company there are initiatives to take items off cal cycles or give items longer cal cycles as a cost cutting method. And in these days, I understand that needs to be done. My advice to our people has simply been to make sure there is some sense to what they want to do. For example, handheld DMMs used by maintenance techs, we can get away with spreading out intervals more than we can on metrology tools used to measure product critical parameters. So I believe the same criteria could apply in your circumstance. The involved people should know what measurements they can get away with loosening, and which ones which may induce product reliability issues.

Enough rambling. Hope this is of some help.
Reply With Quote
  #5  
Old 14th November 2002, 02:19 PM
Ken K's Avatar
Ken K Ken K is offline
!

Registration Date: Jun 2000
Location: USA
Age: 56
 
Posts: 406
Thanks Given to Others: 0
Thanked 14 Times in 13 Posts
Karma Power: 57
Karma: 515
Ken K is appreciated, and has over 500 Karma points.Ken K is appreciated, and has over 500 Karma points.Ken K is appreciated, and has over 500 Karma points.Ken K is appreciated, and has over 500 Karma points.Ken K is appreciated, and has over 500 Karma points.Ken K is appreciated, and has over 500 Karma points.
Default

Interesting discussion. Would like to add my thoughts.

I cringed when I first read the original post. It still bothers me.
To double or triple a calibration interval without historical data to back it up is in my opinion looking for trouble, unless...

...you perform verifications between calibration intervals.

We discussed this with our ISO 17025 auditor before our pre-assessment. We didn't want to become accredited for calibration, just testing. So we put all our equipment we use to test everything listed in our scope on a yearly interval to start with. An outside lab will calibrate these for us. During the year, we will perform verifications on these. If everything stays stable, as it has been in the past, we will increase some to longer calibration intervals.
This way, our verifications will identify any problems we should encounter.

Now, I don't know if you calibrate in-house or have an outside vendor do it, but verifications might help you somewhat.
Reply With Quote
  #6  
Old 14th November 2002, 06:01 PM
Dave Hiser Dave Hiser is offline
Inactive Registered Visitor

Registration Date: Nov 2002
Location: michigan
Age: 49
 
Posts: 2
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 29
Karma: 10
Dave Hiser has less than 100 Karma points so far.
Thumbs up Gage calibration intervals

I want to thank those who replied with excellent responses. I am a UAW member who actually works, and am trying hard to do the RIGHT THING.
Here is a little history behind my original post. We are an in-house lab that repairs most of our own gaging. Many items don't last but a week or month in the harsh production enviroment. There was a transformation last year from Gage Trak to IQS which allowed us to be intranetted with other plants. During the transfer of data, many of the records were transfered in error, which created many of the rejects to show up as passed, and due to our lack of documentation of adjustments, repairs, and servicing there was incomplete records.
This in turn allowed not upper management, but lower management to take advantage of the data transfer which showed us in better shape than what we were really in.
I took a risk and changed most of the intervals back to there original recall periods. Of course, this has not gone over well and I am currently being put on notice for doing so. That is one of the reasons for asking the experts here at the Cove, some good sound fundamentals that I can use to persuade those in charge that this was not done in the best interest of the company or the customer.
Any more helpful tips and literature would be extremely helpful.

To steal a quote "I'm smiling because I don't know what's going on!"
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 17025 - Calibration, Measurement Gages and Test Laboratories > Calibration Frequency (Interval)

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Gage Block Measurement - Home made gage blocks at 1" intervals Coleman Donnelly ISO/TS 16949 - International Automotive Quality Systems Standard 7 31st March 2008 12:24 PM
Calibration Intervals (Frequency) for Stereoscopes, Microscopes, etc. freelovefest Inspection and Test, Sampling and Related Topics 2 12th October 2007 08:55 PM
Methods of Reviewing Calibration Intervals rahayu Calibration Frequency (Interval) 2 1st August 2002 04:46 PM
Determining Calibration Intervals - Extend or change the length of Dan De Yarman Calibration Frequency (Interval) 11 16th February 2001 08:37 PM
Determination of Calibration Intervals and Frequency Analysis Marc Calibration Frequency (Interval) 6 21st March 2000 05:50 PM



The time now is 02:54 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts