The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Design and Development - Process and Product


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 6th January 2003, 03:03 PM
Chickenlips Chickenlips is offline
Involved in Discussions

Registration Date: May 2002
Location: Wisconsin
Age: 38
 
Posts: 16
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 31
Karma: 10
Chickenlips has less than 100 Karma points so far.
Default Design Procedure and Safety Issues

We recently set up our Design Procedure which includes a Project Checklist for the designer to use to ensure that all items are addressed during the design process (inputs, outputs, validation, etc.).

Up until now, we have designed and manufactured electronic items that had no impact on safety for the end user. We are now entering into Contract Design and Manufacturing, and we are finding that some of these things have impact on the end user safety. So the question was raised, do we want to add a "Safety Review" bullet on the project checklist, so our Designer can check off that it is required, or not applicable? Our worry is that if we sign this "N/A" and an end user gets hurt, will we be liable, or is the company that we were contracted by responsible for verifying that the product was safe? Can we have the company that we are doing the design work for sign a liability waiver of some kind?

Any help would be greatly appreciated!

Thank you! Becky
Reply With Quote

Sponsored Links
  #2  
Old 6th January 2003, 03:27 PM
db's Avatar
db db is offline
Where's the shall?

Registration Date: Jul 2001
Location: Plymouth, MI
Age: 53
 
Posts: 2,202
Thanks Given to Others: 208
Thanked 166 Times in 128 Posts
Karma Power: 129
Karma: 2579
db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.
Default

Wow Becky! Talk about a can of worms. Here is my take. The question you are asking has two answers. One is practical in nature, the other is political. It makes sense to include the bullet from a practical standpoint because you want the engineers to be alerted when a potential safety issue is involved. The political aspect is you don’t want to open yourselves up to a lawsuit later.

Your legal department may have the final say on this, but my recommendation would be to include the bullet. If we look deep enough, we will find that anything can be blamed for some sort of injury. I think the risk of not identifying a safety issue has far more potential implications than the opposite.
__________________
Dave B (the other Dave)
Reply With Quote
Sponsored Links

  #3  
Old 6th January 2003, 04:52 PM
Angela-2007's Avatar
Angela-2007 Angela-2007 is offline
E-Mails Invalid or Rejected

Registration Date: Oct 2002
Location: Southfield, Michigan
 
Posts: 102
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 10
Angela-2007 has less than 100 Karma points so far.
Default

I believe one of the rules in business is "protect thyself" Use the bullets and ask the companies to sign waivers. When it comes to lawsuits there is never too much coverage.

Angela
Reply With Quote
  #4  
Old 6th January 2003, 07:18 PM
David Mullins's Avatar
David Mullins David Mullins is offline
Aussie Bloke

Registration Date: Nov 1999
Location: Adelaide, South Australia, Australia
Age: 47
 
Posts: 495
Thanks Given to Others: 0
Thanked 13 Times in 8 Posts
Karma Power: 51
Karma: 84
David Mullins has less than 100 Karma points so far.
Default

Instead of a safety bullet (unless I'm not fully understanding your definition) couldn't you have a standard risk assessment section in you project plan that covers items like safety, as well as numerous other risk categories like political, timing, scope, related projects, resources, financial, industrial relations, cultural, etc, etc.

Generally project managers aren't safety experts and really need some clear "tick and flick" guidelines to lead them through the minefield.

A risk management matrix could also be used to grade the record assessments of likelihood and impact, as well as mitigation measures / treatments and monitoring and control methods, as well as documenting who will be responsible during the project.

If I had an insight into what industry, process types, etc., I could give a more meaningful answer/examples.
__________________
Aussie Bloke
Reply With Quote
  #5  
Old 7th January 2003, 04:36 AM
M Greenaway's Avatar
M Greenaway M Greenaway is offline
Courtesy Access

Registration Date: Dec 2001
Location: England
 
Posts: 1,643
Thanks Given to Others: 10
Thanked 63 Times in 44 Posts
Karma Power: 80
Karma: 794
M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.
Default

FMEA in other words ?
Reply With Quote
  #6  
Old 7th January 2003, 09:44 AM
Chickenlips Chickenlips is offline
Involved in Discussions

Registration Date: May 2002
Location: Wisconsin
Age: 38
 
Posts: 16
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 31
Karma: 10
Chickenlips has less than 100 Karma points so far.
Default

I have brought up using a FMEA as a tool to do risk assessments, but this company has never used a FMEA before, and the response I got was less than positive, because they don't understand the use of FMEA's.

This area gets kind of tricky for us, because we were contracted by a company to design and manufacture a component of a larger assembly. We can only test the design in-house, not when it's fully assembled. Does this mean that the customer is responsible for the risk assessment of the component in it's final assembly?

We are in the agriculture industry, and we are designing and manufacturing controllers for ag equipment, such as mixers, balers, etc. We design the electronics portion of it, as well as the housings, power cords, etc. Up until now, all of our products were additions to mixers grain carts, but had nothing to do with the control of the farm equipment, but some of our new business does. So this is a completely new area for us. I want to make sure that our designers are paying attention to these things.

I am thinking that we will add the Safety assessment to our Product Design Checklists, and it may also be wise for us to have some kind of liability waiver, holding the customer responsible for performing the final risk assessment on the completed assembly?

Thank you for all of your help!

Becky
Reply With Quote
  #7  
Old 7th January 2003, 10:00 AM
db's Avatar
db db is offline
Where's the shall?

Registration Date: Jul 2001
Location: Plymouth, MI
Age: 53
 
Posts: 2,202
Thanks Given to Others: 208
Thanked 166 Times in 128 Posts
Karma Power: 129
Karma: 2579
db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.
Default FMEA

IMO, the FMEA is one of the most powerful tools available. Unfortunately, it is also one of the most misunderstood and abused tools. With this in mind, two potential stategies.

1) contact your local manufacturing assistance center (nearby college, known training company, etc) and have them provide a training class on the FMEA. This should take some of the apprehension away.

2) talk with your customer. In many cases, they are even more aware of the safety implications of your product, and will often provide someone to assist you in developing your FMEA. They do this because it also shows "due diligence" on their part and can become valuable should the product cause injury.
__________________
Dave B (the other Dave)
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Design and Development - Process and Product

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Creating a system to capture Quality related issues for design department sushant Design and Development - Process and Product 10 9th June 2008 02:13 PM
Transportation procedure issues - Scanned invoice in the procedure? KATII Documentation Control Systems, Procedures, Forms and Templates 8 12th November 2005 01:59 AM
Design Laboratory Notebook Procedure in your design control or quality system? sardonyx Design and Development - Process and Product 3 3rd August 2005 02:43 PM
In Need of Safety Advice - Design and build of a safety program QualityJedi Design and Development - Process and Product 22 23rd February 2005 02:05 PM
Design Control Issues - Toolroom says the system is too complicated Fire Girl Design and Development - Process and Product 15 5th June 2004 04:22 AM



The time now is 06:44 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts