Verification vs. Validation in 7.1.4 - Definition of Verification and Validation
ISO/TS 16949 says in 7.1.4 "The effects of any change . . .shall be assessed, and verification and validation activities shall be defined.... " and "Changes shall be validated before implementation". What do verification and validation mean here?
Let's say there is an equipment change. How would you, in this case, illustrate verification and validation (and implementation).
Thanks!
Peter
Last edited by PeterL; 22nd January 2003 at 12:32 PM.
Re: Verification vs. Validation in 7.1.4 - Definition of Verification and Validation
I Would like to re-start this thread.
Can somebody help me out with more clarification on Verification and Validation?
I remember these V's are used in more than one context like
- For a design or a design change
- For a Containment action
- For a Root cause
Do all these boil down to the same concept?
Thanks.