The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Design and Development - Process and Product


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 13th February 2003, 02:01 PM
lday38 lday38 is offline
Involved in Discussions

Registration Date: May 2002
Location: Naugatuck,CT
Age: 57
 
Posts: 137
Thanks Given to Others: 2
Thanked 2 Times in 2 Posts
Karma Power: 33
Karma: 31
lday38 has less than 100 Karma points so far.
Send a message via AIM to lday38
Let Me Help You Scope and Exclusion of 7.3 - No Product Design - 7.3.1.1 Multidisciplinary Approach

My company does not design product, am I correct in the assumption that we can exclude 7.3.1 from TS16949 but not the the 7.3.1.1 mutidisciplinary approach,and more in particular 7.3.2. design and development inputs? Would 7.3.2 design than refer to the tools and machines to make the product?
Reply With Quote

Sponsored Links
  #2  
Old 13th February 2003, 03:11 PM
Jimmy Olson Jimmy Olson is offline
E-Mails Invalid or Rejected

Registration Date: Jul 2002
Location: WA
 
Posts: 331
Thanks Given to Others: 0
Thanked 5 Times in 5 Posts
Karma Power: 0
Karma: 226
Jimmy Olson is appreciated, and has over 200 Karma points.Jimmy Olson is appreciated, and has over 200 Karma points.Jimmy Olson is appreciated, and has over 200 Karma points.
Default

If your company does not design product than you can exclude all of 7.3 instead of limiting yourself to portions of it. Just put something in your manual that indicates you are excluding 7.3 and the reason and justification why.
Reply With Quote
Sponsored Links

  #3  
Old 13th February 2003, 04:29 PM
lday38 lday38 is offline
Involved in Discussions

Registration Date: May 2002
Location: Naugatuck,CT
Age: 57
 
Posts: 137
Thanks Given to Others: 2
Thanked 2 Times in 2 Posts
Karma Power: 33
Karma: 31
lday38 has less than 100 Karma points so far.
Send a message via AIM to lday38
Default no inputs or ouputs -manufacturing process

Well that is good news. Thank you I thought I would at least have to document those requiremnts for the manufacturing process. It seems to be that the tool design and the station in which they are put in the press would have to be part of the design concept.
Would I have to document these requirments at another section?
Reply With Quote
  #4  
Old 13th February 2003, 10:55 PM
Don Wood Don Wood is offline
Involved - Posts

Registration Date: Nov 2002
Location: Detroit
 
Posts: 53
Thanks Given to Others: 0
Thanked 3 Times in 3 Posts
Karma Power: 31
Karma: 71
Don Wood has less than 100 Karma points so far.
Default Permissible Exlcusions - Clause 7.3

Iday, take a good look at clause 1.2 of TS 16949:2002 (TS2) and the "IATF Guidance to ISO/TS 16949:2002", clause 7.3. The only clauses that can be excluded in their entirety is 7.3.2.1 (Product design input) and 7.3.3.1 (Product design output). All the other requirements of clause 7.3 are applicable to the design and development of an organization's manufacturing process. This includes 7.3.2 (Design and development inputs) and 7.3.3 (Design and development outputs), where the expectation is that one should substitute "Process" for "Product" in the ISO clauses.

Manufacturing process design CANNOT be excluded. This is clearly spelled out in clause 1.2 of TS2, and emphasized in the note under clause 7.3. Tool design cannot be excluded either, as tooling design clearly has a significant impact on the manufacturing process.

Take heart though - documented procedures are NOT required, but you are expected to comply with your customer's requirements for quality planning and product approval.

Hope this helps, and good luck on your transition efforts!
Don Wood
Deosil Management
Licensed Plexus Trainer/ ISO/TS 16949:2002 CB Auditor Examiner
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Design and Development - Process and Product

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Exclusion of 8.3 for Design only scope? Casana ISO 9001 - Quality Management Systems Standard 10 9th January 2009 01:31 PM
What kind of documents shall be prepared by a Multidisciplinary approach? Gaby OG ISO/TS 16949 - International Automotive Quality Systems Standard 1 2nd April 2008 08:49 PM
Multidisciplinary Approach - What is multidisciplinary approach? elmismojulio1964 Definitions, Acronyms, Abbreviations and Interpretations 1 16th August 2007 01:49 PM
TS 16949 Clause 6.2.2.1 - Product Design Skills Exclusion tattva Design and Development - Process and Product 1 23rd September 2003 01:40 PM
Exclusion of Design - Problem if we were to design? & Sample exclusion Text Bob_M Design and Development - Process and Product 18 5th September 2003 05:47 PM



The time now is 02:25 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts