The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Design and Development - Process and Product


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 24th April 2003, 03:36 PM
Internet-101 Internet-101 is offline
E-Mails Invalid or Rejected

Registration Date: Aug 2001
 
Posts: 26
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 10
Internet-101 has less than 100 Karma points so far.
Yin Yang 7.3.1 Design and Development

7.3.2.1 Product Design Input
7.3.3.1 Product Design Output

Are these points from Design Responsibility exclusively?

This is because other ones (7.3.1, 7.3.1.1, 7.3.2, 7.3.2.2, 7.3.2.3, 7.3.3, 7.3.3.2, 7.3.4, 7.3.4.1, 7.3.5, 7.3.6, 7.3.6.1, 7.3.6.2, 7.3.6.3 & 7.3.7) have part of Design and Development Process of the Product.
If some company hasn’t a Design Responsibility but they need to introduce new products according ISO/TS 16949:2K terms on 7.3 “Design and Development” Element.
Will they need to comply with (7.3.1, 7.3.1.1, 7.3.2, 7.3.2.2, 7.3.2.3, 7.3.3, 7.3.3.2, 7.3.4, 7.3.4.1, 7.3.5, 7.3.6, 7.3.6.1, 7.3.6.2, 7.3.6.3 & 7.3.7) points only without 7.3.2.1 & 7.3.3.1 points without any non-conformance about it?
Or Which points from 7.3.1 “Design And Development” are necessary to comply If some company doesn’t have Design Responsibility?

I hope you can understand the situation.

Thanks in advance for your help.


Smile is good for your health!

Reply With Quote

Sponsored Links
  #2  
Old 24th April 2003, 06:16 PM
tattva tattva is offline
E-Mails Invalid or Rejected

Registration Date: Apr 2003
Location: Mexico City
Age: 32
 
Posts: 46
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 15
tattva has less than 100 Karma points so far.
Yin Yang

Taking advatnage of this new threat, I´ve another question I hope you can help me to fully understand.

We don´t design a thing not even the manufacturing process, so do I still have to deal with other points regarding design such as competence 6.2.2.1?

Thanks in advance
Reply With Quote
Sponsored Links

  #3  
Old 25th April 2003, 06:05 AM
Manoj Mathur Manoj Mathur is offline
Forum Moderator

Registration Date: Jun 2002
Location: Silvassa,Near Mumbai in INDIA
Age: 43
 
Posts: 316
Thanks Given to Others: 5
Thanked 43 Times in 10 Posts
Karma Power: 50
Karma: 658
Manoj Mathur is appreciated, and has over 500 Karma points.Manoj Mathur is appreciated, and has over 500 Karma points.Manoj Mathur is appreciated, and has over 500 Karma points.Manoj Mathur is appreciated, and has over 500 Karma points.Manoj Mathur is appreciated, and has over 500 Karma points.Manoj Mathur is appreciated, and has over 500 Karma points.
Default

Tattva,

It is hard to digest for me that You don't design(Moderate & Regulate) the manufacturing processes or the elements of it.

May I know what is your product and How do you make it?

Manoj Mathur
Reply With Quote
  #4  
Old 25th April 2003, 09:57 AM
Sam's Avatar
Sam Sam is offline

Registration Date: Sep 1999
Location: Oklahoma
Age: 67
 
Posts: 1,437
Thanks Given to Others: 1
Thanked 29 Times in 17 Posts
Karma Power: 90
Karma: 1020
Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.
Default

Internet,
This is a difficult element to take exceptions since it applies to both the "Design and Development" of the product. At what point do you separate the design from the development? You may not be designing a product, but you may be developing a product. What is meant by development? Only you can determine that point.
IMO all of 7.3 requirenments would apply, except those explicitly related to the design of the product,i.e., design review.

Tattva,
7.3 Design and development applies to "products" and "processes". You may not design a process, but you may develop one.
As stated above, IMO all of 7.3 would apply, except those explicitly related to the deisgn of the product.
__________________
Sam Goody
Reply With Quote
  #5  
Old 25th April 2003, 10:18 AM
tattva tattva is offline
E-Mails Invalid or Rejected

Registration Date: Apr 2003
Location: Mexico City
Age: 32
 
Posts: 46
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 15
tattva has less than 100 Karma points so far.
Yin Yang

Thank You all VERY MUCH!

I was talking to quality manager yesterday, and told me we can not make aside point 7.3, ´cause we do develop de manufacturing process.

We pour polyurethane, and what I meant by " not designing a thing " is that all technology and equipment is designed by coorporate engineering. But as you say, developing the process is another thing,we do that.
Reply With Quote
  #6  
Old 1st June 2003, 04:29 AM
Howard Atkins's Avatar
Howard Atkins Howard Atkins is offline
Forum Administrator

Registration Date: Jul 1997
Location: Revivim, Israel
 
Posts: 2,412
Thanks Given to Others: 100
Thanked 448 Times in 253 Posts
Blog Entries: 8
Karma Power: 195
Karma: 4817
Howard Atkins is appreciated, and has over 1700 Karma points.
Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.
Send a message via Skype™ to Howard Atkins
Default

I have been pondering this problem and after some resarch including the thread at

http://Elsmar.com/Forums/showthread....&threadid=4602
I have to agree with Sam:
From ISO 9000:2000

Quote:
3.4.4
design and development
set of processes (3.4.1) that transforms requirements (3.1.2) into specified characteristics (3.5.1) or into the
specification (3.7.3) of a product (3.4.2), process (3.4.1) or system (3.2.1)
NOTE 1 The terms “design” and “development” are sometimes used synonymously and sometimes used to define different
stages of the overall design and development process.
NOTE 2 A qualifier can be applied to indicate the nature of what is being designed and developed (e.g. product design and
development or process design and development).


Quote:
3.4.1
process

set of interrelated or interacting activities which transforms inputs into outputs
NOTE 1 Inputs to a process are generally outputs of other processes.
NOTE 2 Processes in an organization (3.3.1) are generally planned and carried out under controlled conditions to add value.
NOTE 3 A process where the conformity (3.6.1) of the resulting product (3.4.2) cannot be readily or economically verified is
frequently referred to as a “special process”.


3.4.2
product
result of a process (3.4.1)
NOTE 1 There are four generic product categories, as follows:

— services (e.g. transport);
— software (e.g. computer program, dictionary);
— hardware (e.g. engine mechanical part);
— processed materials (e.g. lubricant).
7.3.1 must be in.
__________________
You can’t fake quality any more than you can fake a good meal.
* William S. Burroughs
Reply With Quote
  #7  
Old 2nd June 2003, 02:26 PM
Mike Smith Mike Smith is offline
Courtesy Access

Registration Date: Feb 2003
Location: Pennsylvania
 
Posts: 146
Thanks Given to Others: 1
Thanked 1 Time in 1 Post
Karma Power: 36
Karma: 312
Mike Smith is appreciated, and has over 300 Karma points.Mike Smith is appreciated, and has over 300 Karma points.Mike Smith is appreciated, and has over 300 Karma points.Mike Smith is appreciated, and has over 300 Karma points.
Default

We are an electronics remanufacturing company. We did not develop or design the product that we remanufacture. We obtained a waiver from our customer stating that we did not have to comply to this requirement of the standard of QS9000. I am hoping to do the same for 16949 since we do not design the product or the MANUFACTURING process.
Reply With Quote
  #8  
Old 2nd June 2003, 07:00 PM
howste's Avatar
howste howste is offline
Thaumaturge

Registration Date: May 2003
Location: Utah
 
Posts: 2,416
Thanks Given to Others: 377
Thanked 838 Times in 460 Posts
Karma Power: 206
Karma: 6556
howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.
howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.
Default

Mike, I would imagine that you do design/develop the remanufacturing processes. I believe you would need to include these design and development of these processes to meet 16949 requirements. From TS 16949 1.2:
Quote:
The only permitted exclusions for this Technical Specification relate to 7.3 where the organization is not responsible for product design and development.
Permitted exclusions do not include manufacturing process design.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Design and Development - Process and Product

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Design and Development Audit checklist - What are design inputs and design outputs? Bachog Design and Development - Process and Product 1 11th August 2008 05:23 AM
Design & Development Process - Graphic Design Work advice needed stephenh Design and Development - Process and Product 13 14th January 2008 08:42 PM
Design and development skills - No responsibility for product design and development shahshahani Design and Development - Process and Product 3 12th May 2006 04:20 PM
How to Comply with ISO 9001 Clause 7.3.1 Design and Development planning Rosana Design and Development - Process and Product 2 31st January 2006 03:15 PM
Design & Development - Exclusion of Clause 7.3.6 - Design and Development Validation khetar Design and Development - Process and Product 2 28th October 2003 12:12 PM



The time now is 11:44 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts