The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Design and Development - Process and Product


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 28th April 2003, 02:00 PM
Bob_M's Avatar
Bob_M Bob_M is offline
Metal Bob

Registration Date: Oct 2002
Location: Bourbonnais, IL - South of Chicago
Age: 36
 
Posts: 351
Thanks Given to Others: 1
Thanked 6 Times in 4 Posts
Karma Power: 45
Karma: 452
Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.
Let Me Help You Request: Bare Bones ISO9k2k DESIGN procedure and Forms - Metal Stamping (small)

We currently have a ISO 9001:1994 design system that has a lot of influence from QS (control plans and similar).

Our registrar recommended that we do not try to exclude design when we upgrade (October 2003) to ISO9k2k.

We are a very small metal stamping, sheet metal spot welding, and smaller hand assembly shop.

We typically do not design parts for customer or create new (finished) products from scratch to sell to customers. We occasionally "assist" our customers and provide input/suggestions.

Our design is mostly limited to new product introduction (unfortunately rather rare and infrequent), and minor design changes to sheet metal or in-process parts.

Few internal design changes would not be customer driven. Mostly sheet metal parts that have no offical "drawings" or requirements.

I'm really just looking for help/examples of a bare bones Design/Product introduction program that fits ISO and our needs. I can/probably will just go thru everything we have and TRY to simplify it to fit ISO and our needs, but examples will really help me out. (Our current system/forms are overkill to the extent that don't get used properly/fully. Too many, too much info to fill out repeatedly on multiple forms).

Note: We don't supply the Big 3, we're not in any of those Tiers, but we do have some QS customers.

Any tips/suggestions appreciated.
Thanks
Bob_M
__________________
What exactly am I signing for here? Where's the packing list? PO? Customer Requirements? - Want to play some Xbox360 on Live?
Reply With Quote

Sponsored Links
  #2  
Old 28th April 2003, 02:35 PM
CarolX's Avatar
CarolX CarolX is offline
Super Moderator

Registration Date: Jun 2000
Location: North of Chicago,Illinois, USA
Age: 49
 
Posts: 2,087
Thanks Given to Others: 419
Thanked 314 Times in 234 Posts
Karma Power: 176
Karma: 4810
CarolX is appreciated, and has over 1700 Karma points.
CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.
Question one question

Hi Bob,

Why did your registrar recommend not excluding design? Very curious.

I am in a similar business as yours and we have absolutely no intention of dealing with the design requirements of 9K2K.

We are a small sheet metal job shop, we manufacturing to customer design. Sure, we suggest design improvements, and occasionally redesign a part for better manufacturability, but that's about it. I'm sure you are doing similar.

Pin down your registrar, ask them why they recommend it. Don't waste your time on something you have no need for.

JMHO,
CarolX
__________________
CarolX

Theater is life, film is art, and television is furniture.
Reply With Quote
Sponsored Links

  #3  
Old 28th April 2003, 02:58 PM
Bob_M's Avatar
Bob_M Bob_M is offline
Metal Bob

Registration Date: Oct 2002
Location: Bourbonnais, IL - South of Chicago
Age: 36
 
Posts: 351
Thanks Given to Others: 1
Thanked 6 Times in 4 Posts
Karma Power: 45
Karma: 452
Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.
Default Re: one question

Quote:
CarolX said:

Hi Bob,

Why did your registrar recommend not excluding design? Very curious.

I am in a similar business as yours and we have absolutely no intention of dealing with the design requirements of 9K2K.

We are a small sheet metal job shop, we manufacturing to customer design. Sure, we suggest design improvements, and occasionally redesign a part for better manufacturability, but that's about it. I'm sure you are doing similar.

Pin down your registrar, ask them why they recommend it. Don't waste your time on something you have no need for.

JMHO,
CarolX
If it matters we use BSI...
We are currently 9001:1994
I don't know exactly why we went for the design element for the 1994 standard, but at the time I was the company's "Product Engineer" and I'm assuming that's what the last QA guy recommended.

When I mentioned excluding design to our auditor in March (1994 surveillance audit), he stated something to the fact that registrars are getting questioned more and more about companies that exclude design especially ones that previously were certified with design.

*shrug*

We probably could attempt to exclude. I'm not that worried about updating the process, but it would be mostly a waste of time. I still have not sat down with the boss (owner/president) and really discussed the topic yet.

And I'm not the best person to try and "argue" my way into getting an exclusion OKed by registrar.

I know I was not given the best reasons, but we really should have SOME kind of product introduction/design process for our own use (not just ISO).

Like I said our CURRENT process is OVERKILL and VERY QS driven. Those forms are only useful for PPAPs in our eyes.
__________________
What exactly am I signing for here? Where's the packing list? PO? Customer Requirements? - Want to play some Xbox360 on Live?
Reply With Quote
  #4  
Old 28th April 2003, 03:10 PM
tomvehoski tomvehoski is offline
Courtesy Access

Registration Date: May 2001
Location: Warren, MI
 
Posts: 548
Thanks Given to Others: 0
Thanked 13 Times in 12 Posts
Karma Power: 67
Karma: 1119
tomvehoski is appreciated, and has over 1100 Karma points.tomvehoski is appreciated, and has over 1100 Karma points.tomvehoski is appreciated, and has over 1100 Karma points.tomvehoski is appreciated, and has over 1100 Karma points.tomvehoski is appreciated, and has over 1100 Karma points.tomvehoski is appreciated, and has over 1100 Karma points.tomvehoski is appreciated, and has over 1100 Karma points.tomvehoski is appreciated, and has over 1100 Karma points.tomvehoski is appreciated, and has over 1100 Karma points.
Default

Many companies wanted design under ISO 9001: 1994 because they felt that ISO 9002 was not as good as ISO 9001. I belive that is one of the major reasons they dropped 9002 - to stop companies from inventing design processes that did not really exist.

If it is just a waste of time and money don't do it. The registrar cannot force you to include design. Even if you have 100 product designers on staff you can exclude the design portion - as long as you don't try to state in your scope that you design.

In addition to saving the cost of setting up a procedure that won't be used, you should be able to have your audit days reduced.

Tom
Reply With Quote
  #5  
Old 28th April 2003, 03:42 PM
M Greenaway's Avatar
M Greenaway M Greenaway is offline
Courtesy Access

Registration Date: Dec 2001
Location: England
 
Posts: 1,643
Thanks Given to Others: 10
Thanked 63 Times in 44 Posts
Karma Power: 80
Karma: 794
M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.
Default

Tom

I think you are quite wrong.

You cannot scope out of your QMS any process that affects your ability to satisfy your customers.

In a nutshell if you design you must meet the design related requirements of ISO9001:2000, if you dont then obviously you dont have to. You should state the scope of your QMS in your quality manual, but it must include everything you do.

The question here is does the company actually design. I would say that if you own the design then yes you do design, if you just have input into the design owned by others than you dont design.
Reply With Quote
  #6  
Old 28th April 2003, 03:51 PM
CarolX's Avatar
CarolX CarolX is offline
Super Moderator

Registration Date: Jun 2000
Location: North of Chicago,Illinois, USA
Age: 49
 
Posts: 2,087
Thanks Given to Others: 419
Thanked 314 Times in 234 Posts
Karma Power: 176
Karma: 4810
CarolX is appreciated, and has over 1700 Karma points.
CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.
Default

Quote:
M Greenaway said:

The question here is does the company actually design. I would say that if you own the design then yes you do design, if you just have input into the design owned by others than you dont design.
Martin,

Exactly. I am assuming that Bob is in the same business as my company. We do sheet metal fabrication. We make parts to customer prints, sketches or whatever documentation the customer give us (yes, we have done the old napkin drawings before). We may have input to the design, but no authority over the design.

Bob,

Talk to your registrar, in particular, the account manager you deal with. I am sure they will find that design should not have been included in the 1994 version, and should not be included now. If they still insist, ask for further clarification. No need to aurgue....but do ask WHY!

Good Luck,
CarolX
__________________
CarolX

Theater is life, film is art, and television is furniture.
Reply With Quote
  #7  
Old 28th April 2003, 03:53 PM
Bob_M's Avatar
Bob_M Bob_M is offline
Metal Bob

Registration Date: Oct 2002
Location: Bourbonnais, IL - South of Chicago
Age: 36
 
Posts: 351
Thanks Given to Others: 1
Thanked 6 Times in 4 Posts
Karma Power: 45
Karma: 452
Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.
Default

Quote:
M Greenaway said:

Tom

I think you are quite wrong.

You cannot scope out of your QMS any process that affects your ability to satisfy your customers.

In a nutshell if you design you must meet the design related requirements of ISO9001:2000, if you dont then obviously you dont have to. You should state the scope of your QMS in your quality manual, but it must include everything you do.

The question here is does the company actually design. I would say that if you own the design then yes you do design, if you just have input into the design owned by others than you dont design.
M Greenway: I suppose in some ways we "own" the design of some of our products, and we technically can update/modify them if we wanted/needed to.

On a regular basis we DO NOT design.


-----------
Quote:
tomvehoski:
Many companies wanted design under ISO 9001: 1994 because they felt that ISO 9002 was not as good as ISO 9001. I belive that is one of the major reasons they dropped 9002 - to stop companies from inventing design processes that did not really exist.

If it is just a waste of time and money don't do it. The registrar cannot force you to include design. Even if you have 100 product designers on staff you can exclude the design portion - as long as you don't try to state in your scope that you design.

In addition to saving the cost of setting up a procedure that won't be used, you should be able to have your audit days reduced.
Tom: That MAY have been why we used 9001... I honestly don't know. It doesn't really matter.

As far as reducing number of days...
We're currently only 1 day during surveillance, and 2 days during update... Can't get much shorter than that...

I think we SHOULD have a BAREBONES design program and thats what I'm looking for examples of. Barebones that work and have passed ISO and fit our needed.

Yes I know, only we can design that best, but examples are helpful
__________________
What exactly am I signing for here? Where's the packing list? PO? Customer Requirements? - Want to play some Xbox360 on Live?
Reply With Quote
  #8  
Old 28th April 2003, 03:58 PM
Claes Gefvenberg's Avatar
Claes Gefvenberg Claes Gefvenberg is offline
Forum Administrator

Registration Date: May 2000
Location: Eskilstuna, Sweden
Age: 49
 
Posts: 3,771
Thanks Given to Others: 246
Thanked 244 Times in 172 Posts
Blog Entries: 13
Karma Power: 213
Karma: 4951
Claes Gefvenberg is appreciated, and has over 1700 Karma points.
Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.
Lightbulb

This is a good topic...

Ok, let's try this angle: In my opinion many registered companies really walked the line between the old 9001 and 9002.

I often point at ISO9001:2000, clause 4.2.1, note 2:

The extent of the quality management system documentation can differ from one organization to another due to

a) the size of organization and type of activities,
b) the complexity of processes and their interactions, and
c) the competence of personnel.


Assume that the design and development process is extremely straightforward... May it prove easier to describe the process than to defend an exclusion?

/Claes

Added later: Whups... Lots of posts poured in while I was writing this.
__________________
Hanlon's Razor.
Never attribute to malice that which can be adequately explained by stupidity.
User Groups: Elsmar Cove Cycling Enthusiasts Formula 1 fanatics Photo freaks Readers Corner
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Design and Development - Process and Product

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
SPC in Injection Moulding and Metal Pressing/Stamping Howard Atkins SPC Monitoring and Statistical Analysis Techniques 14 25th September 2009 09:39 AM
Metal Stamping Tooling Transfer Checklist denmar Manufacturing and Related Processes 7 19th February 2009 01:55 PM
Implementing ISO 9001 - I need it all! Please tell me the bare bones! kmyers ISO 9001 - Quality Management Systems Standard 27 23rd September 2008 07:50 AM
What to monitor using SPC in Metal Stamping industry larry hopperrath SPC Monitoring and Statistical Analysis Techniques 4 20th December 2006 10:11 AM
Request: Quick list of Required ISO9k2k RECORD Bob_M Records and Data - Quality, Legal and Other Evidence 5 25th June 2003 05:01 PM



The time now is 04:02 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts