The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Contract Review Process


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 13th February 2000, 11:18 AM
Chris
Unregistered Guest

 
Posts: n/a
Question Contract review - capability

My question is regarding the difference between capability review as contract review and new product development (design). Our very small company (20 emps.) manufactures mostly to supplied customer specifications. Occasionally, a customer will come to us with something that we have not done before. Depending on the situation, we may have an internal conversation about it and decide that we can produce the part in question. Other times, we may do more elaborate tests/prototypes. We are confused about where the line is between contract review and design. Thanks for any insight.
Reply With Quote

Sponsored Links
  #2  
Old 14th February 2000, 12:45 AM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Yin Yang

I wouldn't get too hung up in the distinction. You do different things with different projects. Be able to produce and be ready to discuss a project book or similar (project summary index, whatever - some compaies keep a single project file).

The 'contract review' part is basically everything you go thru prior to accepting a contract (PO) from your customer. There may be many changes made subsequently in response to, among other things, test results.

On the other hand you may do testing and such before submitting your bid to the customer for the contract (if a bid system is part of the situation).

What you do as contract review for Project A may very well be quite different from that of Project B. But - most of the basics should be the same: Can we do it? How much will it cost and how much can we make? How many can we make per unit time? How many does the customer want?

Sometimes the contract is in part or fully for research. Example, customer wants 5 laser cutters with a specific power. They have never been build before. It may be that the research for making the product is (at that time in history) beyond the state of the art (can't be built, but it was a good theory!!!).

At some point you reach an agreement to take on a project in return for some form of payment. What did you do before you rached that point?

Typically it is easiest to put together a flow chart of the sequence of the basic and typical steps you go through.

You say: "Other times, we may do more elaborate tests/prototypes." Are they paying you for the prototypes and such? Do you do them on your own? When does it reach the point where some type of agreement is made?

Does that help or have I confused you?
Reply With Quote
Sponsored Links

  #3  
Old 14th February 2000, 01:02 AM
BP for Chris
Unregistered Guest

 
Posts: n/a
Marc--

Thanks. Yes,I think we are trying too hard to make things fit perfectly into ISO. Most sample prototypes we do on our own. We do get paid for some projects. On paid test projects, agreement is usually reached after the customer has tested out the sample product. I would say that the paid projects are the "never has been done before" type that require considerable research on our part.


[This message has been edited by Marc Smith (edited 14 February 2000).]
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Contract Review Process

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
ISO 9001:2008 Contract Review for a business that doesn't have formal contract review corwall Contract Review Process 11 15th October 2009 08:22 PM
Contract Review - Interpreting the intent of Contract Review - Open POs - Clause 4.3 LaurieB Contract Review Process 6 17th May 2009 11:30 AM
Contract Review Process Turtle Diagram - Please Review and Critique michelle8075 Contract Review Process 18 29th March 2009 09:57 AM
AS9100 - 7.2 Contract Review - How others do Contract Review in a documented fashion Garry Contract Review Process 6 11th April 2005 09:52 PM
Best way to implement Contract Review? ISO 9001 - Contract Review Arturo Rosales Contract Review Process 6 20th August 1999 06:49 PM



The time now is 01:53 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts