The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 12th June 2003, 01:11 PM
lee01 lee01 is offline
Courtesy Access

Registration Date: May 2001
Location: Europe and beyond (aka a nomad!)
Age: 32
 
Posts: 89
Thanks Given to Others: 2
Thanked 3 Times in 3 Posts
Karma Power: 36
Karma: 40
lee01 has less than 100 Karma points so far.
Default Reduced Inspection & SPC

Okay here goes. . . .

Lets say we have a production run or 1 item per month (perhaps), we 100% digitally inspect (CMM) every that part every time. We need to start to reduce the inspection time allocated. How do we do this? There are several options:

1, Inspect 10 off to determine capability etc and then start to reduce inspection to inspect 1 miss 1, inspect 1 miss 2, inspect 1 miss 3 etc. Therefore reducing the inspection required whilst still inspecting the part as it comes through.

2, Once we have a proven stable process (inspect 10 @ 100%) start to reduce the number of measurement points inspected. Therefore previously you measured 500 points on a surface, you now only measure 250 points. The problem with this is that you will have the set up time and CMM tie up remaining.

Is there any advice or suggestion out their so we can apply this? Remember, we do not have any constant production runs so the usual sampling plans do not seem to apply.

Lee01
Reply With Quote

Sponsored Links
  #2  
Old 12th June 2003, 01:33 PM
Al Dyer's Avatar
Al Dyer Al Dyer is offline
Mod...

Registration Date: Mar 2003
Location: Oregon, MI
Age: 51
 
Posts: 577
Thanks Given to Others: 4
Thanked 10 Times in 10 Posts
Karma Power: 46
Karma: 398
Al Dyer is appreciated, and has over 300 Karma points.Al Dyer is appreciated, and has over 300 Karma points.Al Dyer is appreciated, and has over 300 Karma points.Al Dyer is appreciated, and has over 300 Karma points.
Send a message via AIM to Al Dyer
Question

Lee01,

What is your production rate?

1/day
1/week etc.......

Al...
__________________
"Para ... Bellum"
Reply With Quote
Sponsored Links

  #3  
Old 12th June 2003, 02:10 PM
Bob_M's Avatar
Bob_M Bob_M is offline
Metal Bob

Registration Date: Oct 2002
Location: Bourbonnais, IL - South of Chicago
Age: 36
 
Posts: 351
Thanks Given to Others: 1
Thanked 6 Times in 4 Posts
Karma Power: 45
Karma: 452
Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.
Default

Ignoring Statistics and sampling plans for a moment...
Why are you 100% inspecting these parts?
Customer requirement?
Internal Requirment?
Unstable Process and/or high rejects?

IF you are not required to 100% inspect, (correct me if I'm wrong) its up to you and your capabilities to determine the necessary inspection rate for you needs.

BTW - I'm sure there are plenty of people here who can recommend reduces rates if you provide more details and production run quantities.
__________________
What exactly am I signing for here? Where's the packing list? PO? Customer Requirements? - Want to play some Xbox360 on Live?
Reply With Quote
  #4  
Old 13th June 2003, 05:35 AM
lee01 lee01 is offline
Courtesy Access

Registration Date: May 2001
Location: Europe and beyond (aka a nomad!)
Age: 32
 
Posts: 89
Thanks Given to Others: 2
Thanked 3 Times in 3 Posts
Karma Power: 36
Karma: 40
lee01 has less than 100 Karma points so far.
Default

We are making approx. 1 item per month (Aerospace). We are inspecting 100 % on every feature because the inspectors will not stamp off the documentation without inspecting the item.

HELP REQUIRED
Reply With Quote
  #5  
Old 13th June 2003, 10:14 AM
Bob_M's Avatar
Bob_M Bob_M is offline
Metal Bob

Registration Date: Oct 2002
Location: Bourbonnais, IL - South of Chicago
Age: 36
 
Posts: 351
Thanks Given to Others: 1
Thanked 6 Times in 4 Posts
Karma Power: 45
Karma: 452
Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.
Default

Quote:
Originally posted by lee01
We are making approx. 1 item per month (Aerospace). We are inspecting 100 % on every feature because the inspectors will not stamp off the documentation without inspecting the item.

HELP REQUIRED
(Don't quote me I'm far from an expert but...)

On the surface if you are literally only making ONE part part per month (for areospace none the less) 100% inspection sounds like a good idea.

If your customer does not require this 100% inspection WHY are you doing it that way?

If you have not proven stability to YOURSELVES YET how can you justify reducing inspections?

If you have proven stablity to YOURSELVES then change the control plan and inspection requirements. Then the inspector will HAVE to approve the documents and parts based on the DOCUMENTED requirements.

(Have I over simplified this? I've never worked for/in areospace so I may be missing alot here.)
__________________
What exactly am I signing for here? Where's the packing list? PO? Customer Requirements? - Want to play some Xbox360 on Live?
Reply With Quote
  #6  
Old 13th June 2003, 12:50 PM
David Hartman's Avatar
David Hartman David Hartman is offline
Courtesy Access

Registration Date: Feb 2003
Location: Marion, IN USA
Age: 57
 
Posts: 514
Thanks Given to Others: 0
Thanked 20 Times in 13 Posts
Karma Power: 66
Karma: 1421
David Hartman is appreciated, and has over 1300 Karma points.David Hartman is appreciated, and has over 1300 Karma points.David Hartman is appreciated, and has over 1300 Karma points.David Hartman is appreciated, and has over 1300 Karma points.David Hartman is appreciated, and has over 1300 Karma points.David Hartman is appreciated, and has over 1300 Karma points.David Hartman is appreciated, and has over 1300 Karma points.David Hartman is appreciated, and has over 1300 Karma points.David Hartman is appreciated, and has over 1300 Karma points.David Hartman is appreciated, and has over 1300 Karma points.
Default

lee01,

With some experience in Aerospace (1 complete assembly every 18 months), I have to pose the question: How stable is your design? The reason I ask, is that in my experience our design was in constant flux. Although we were contracted to assemble 8 "identical" units, customer requirements had a tendency to vary with each unit, supplier's (and their processes varied) - some of the materials procured were of such substantial size that we could not stock them, and had to have them made to order, and personnel performing the assembly processes varied. As a result 100% inspection was the best we could do.

Just a caution to ensure product and process stability prior to giving consideration to turning to sampling.
__________________
David D. Hartman
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
SPC vs. 100% Inspection - Is SPC still value-added when 100% inspection is in place? MasterBB FMEA and Control Plans 40 19th November 2009 04:40 PM
Tracking Lots for Reduced and Tightened Inspection z28tt Inspection and Test, Sampling and Related Topics 2 16th November 2009 09:01 AM
Pre-Inspection & Final Inspection Procedures and ISO 9001 blane Documentation Control Systems, Procedures, Forms and Templates 9 12th July 2009 09:35 AM
Maintaining an SPC program with reduced staffing ScottK SPC Monitoring and Statistical Analysis Techniques 8 7th April 2009 09:41 AM
Successful Validation = Reduced Inspection? No Inspection?? Dr. Electron ISO 13485 - Medical Devices - Quality Management Systems 7 11th September 2008 10:25 PM



The time now is 06:44 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts