The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Records and Data - Quality, Legal and Other Evidence


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 16th June 2003, 12:27 PM
ISO Cheesy's Avatar
ISO Cheesy ISO Cheesy is offline
Inactive Registered Visitor

Registration Date: Jun 2003
Location: Chandler, AZ
Age: 39
 
Posts: 40
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 28
Karma: 88
ISO Cheesy has less than 100 Karma points so far.
Question Corrective Action - Is the Follow up the Record? 4.2.4

I have a question on corrective action and the ISO9000:2000 standard....” A documented procedure shall be established to define req. for…..Para e) records of the results of action taken (see 4.2.4)”

The 94' standard states the "Recording the results of the investigation" (para b)

Does this mean that the follow up is now the quality record? I have a separate report for follow up, currently the CAR form is my record.

Thanks,
Christy
Reply With Quote

Sponsored Links
  #2  
Old 16th June 2003, 12:59 PM
Jimmy Olson Jimmy Olson is offline
E-Mails Invalid or Rejected

Registration Date: Jul 2002
Location: WA
 
Posts: 331
Thanks Given to Others: 0
Thanked 5 Times in 5 Posts
Karma Power: 0
Karma: 226
Jimmy Olson is appreciated, and has over 200 Karma points.Jimmy Olson is appreciated, and has over 200 Karma points.Jimmy Olson is appreciated, and has over 200 Karma points.
Default

Hi Christy, welcome to the cove

If you use a seperate form for your follow up then that will have to kept as a seperate record in addition to the CAR.

Just out of curiosity, is there a specific reason that you use a seperate form? If you could combine them it might make things easier. Just wondering, I know different companied hav different ways of doing things.
Reply With Quote
Sponsored Links

  #3  
Old 16th June 2003, 01:13 PM
ISO Cheesy's Avatar
ISO Cheesy ISO Cheesy is offline
Inactive Registered Visitor

Registration Date: Jun 2003
Location: Chandler, AZ
Age: 39
 
Posts: 40
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 28
Karma: 88
ISO Cheesy has less than 100 Karma points so far.
Default

Thanks for the info.

The reason we have a different form is because when I was hired this company had a CAR db and it provide only a check box for follow up…no date, by whom, or even the results. The CA was being closed out with no objective evidence of follow up taking place. I’m a big advocate on follow up (until can learn access) I made up follow up report in a word doc to get the ball rolling.

So now my next question: Do we now have to do follow up on every CA/PA?
Reply With Quote
  #4  
Old 16th June 2003, 01:25 PM
Jimmy Olson Jimmy Olson is offline
E-Mails Invalid or Rejected

Registration Date: Jul 2002
Location: WA
 
Posts: 331
Thanks Given to Others: 0
Thanked 5 Times in 5 Posts
Karma Power: 0
Karma: 226
Jimmy Olson is appreciated, and has over 200 Karma points.Jimmy Olson is appreciated, and has over 200 Karma points.Jimmy Olson is appreciated, and has over 200 Karma points.
Default

Quote:
Originally posted by ISO Cheesy


So now my next question: Do we now have to do follow up on every CA/PA?
Somehow I can see this turning into a long and interesting debate

As far as the standard is concerned, it does require a review of CAs and PAs, however, it is pretty open as to how you want to review. This could just be as simple as reviewing the actions to make sure they have been done, or it could be a follow up and verification. As long as you can show that any actions taken are reviewed somehow you will be okay

We do a verification of some sort on all of our CAs and depending on what the action is the verification can be pretty short and simple. Personally, I think it is a good idea to do some sort of follow up on all CAs to make sure they are effective. This doesn't necessarily need to be anything in depth. On some of our CAs the verification is done the same day as the action (just depends on what is done).

I hope this didn't just create more confusion. It's a Monday and I tend to ramble on Mondays before my brain decides to show up for work.
Reply With Quote
  #5  
Old 16th June 2003, 01:43 PM
ISO Cheesy's Avatar
ISO Cheesy ISO Cheesy is offline
Inactive Registered Visitor

Registration Date: Jun 2003
Location: Chandler, AZ
Age: 39
 
Posts: 40
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 28
Karma: 88
ISO Cheesy has less than 100 Karma points so far.
Default

That helps very much; it’s right inline with what I was thinking. I just (unfortunately) needed some “ammo” (or maybe I should say “reassurance”) to just get ANY kind of follow-up and verification going here. MGT. Didn’t like the fact that CARs are not closed out right after the corrective action was filled in…I did follow up on some CARs and realized the actions never even took place, haven’t even touched if they are effective yet.

Ok so now I’m on my Follow up soapbox…I’ll stop

thanks for all your help!
Reply With Quote
  #6  
Old 16th June 2003, 03:05 PM
howste's Avatar
howste howste is offline
Thaumaturge

Registration Date: May 2003
Location: Utah
 
Posts: 2,416
Thanks Given to Others: 377
Thanked 838 Times in 460 Posts
Karma Power: 206
Karma: 6556
howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.
howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.
Default

The ISO 9000:2000 definition of review is:

review
activity undertaken to determine the suitability, adequacy and effectiveness of the subject matter to achieve established objectives.

To me this says that the review of corrective action (and records) must include:
• Did you take the right action (suitable)
• Did you take enough action (adequate)
• Did the actions taken do what you intended (effective)

For the question "Do we now have to do follow up on every CA/PA?" I agree with Richard. 8.5.2c talks about evaluating the need for action. This implies that you don't have to take action on every problem you identify. If you've determined you need to act though, you certainly do need to follow up to "determine the suitability, adequacy and effectiveness" of the actions taken.

BTW, if you want to email the database to me (as long as it's not too huge or complicated) I could attempt to add some verification fields to it for you...
Reply With Quote
  #7  
Old 16th June 2003, 03:28 PM
ISO Cheesy's Avatar
ISO Cheesy ISO Cheesy is offline
Inactive Registered Visitor

Registration Date: Jun 2003
Location: Chandler, AZ
Age: 39
 
Posts: 40
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 28
Karma: 88
ISO Cheesy has less than 100 Karma points so far.
Default

Howste, I found someone here that is updating the db as I type, but WOW thank you so much for the offer.

Now that I have that taken care of the follow up (recording of it anyway), I just need to define my “Specific actions where timely and/or effective corrective actions are not achieved” AS9100 rev A.

I don’t want to start the bureaucracy of issuing CARs for ineffective CARs. This company is too small (30emp.) not to mention it took me a month to convince them to let me start follow up.

*this too shall pass*
Reply With Quote
  #8  
Old 16th June 2003, 04:03 PM
howste's Avatar
howste howste is offline
Thaumaturge

Registration Date: May 2003
Location: Utah
 
Posts: 2,416
Thanks Given to Others: 377
Thanked 838 Times in 460 Posts
Karma Power: 206
Karma: 6556
howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.
howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally posted by ISO Cheesy
I just need to define my “Specific actions where timely and/or effective corrective actions are not achieved” AS9100 rev A.
I guess escalation may not be the best approach if there are only a few in the chain of command. It sounds like you've already started though. Follow-up is IMO the best way to ensure that effective and timely actions are taken. People will forget to do (or deliberately ignore ) corrective actions if you let them.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Records and Data - Quality, Legal and Other Evidence

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Should Preventative Action follow a Corrective Action Christopher S Nonconformance and Corrective Action 27 2nd November 2009 10:04 PM
Corrective and Preventive Action - State Maximum time for follow-up required? EtobiLad ISO 9001 - Quality Management Systems Standard 14 1st November 2006 04:50 PM
Supplier Corrective Action: Are you requiring suppliers to follow a defined process? jwendt2 Supplier Quality Assurance and other Supplier Issues 5 9th October 2003 01:18 AM
Corrective Action and Preventive Action clauses - ISO 9001 - Corrective Action Ace Nonconformance and Corrective Action 6 26th November 2001 01:47 AM
When to start a formal corrective action as a follow-up action after audits Iceman ISO 19011 and ALL Auditing Discussions 11 7th June 2001 10:25 PM



The time now is 09:53 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts