The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Design and Development - Process and Product


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 7th July 2003, 12:35 PM
Bob_M's Avatar
Bob_M Bob_M is offline
Metal Bob

Registration Date: Oct 2002
Location: Bourbonnais, IL - South of Chicago
Age: 36
 
Posts: 351
Thanks Given to Others: 1
Thanked 6 Times in 4 Posts
Karma Power: 45
Karma: 452
Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.
Let Me Help You Design - Simple System - ISO 9001 Clause 7.3 - Review vs. Verification vs. Validation

OK I've posted, read, and searched about design process/procedure before on the cove.
I'm trying to create a simple process / procedure / form that will cover the ISO requirements without creating to much paper work (like current system) and I'm getting stuck...
While working on THIS area I've been reading and re-reading the standard, samples, posts, and our own 1994 style forms, and I'm getting more lost and confused by the minute. (Manual is due 7/28/03 and Design procedure is past due in boss's eyes).

To start: Small company - metal stamping and spot welding, I'm Quality and Engineering, most designs are customer owned and controlled, we typically DON'T design anything from scratch, we may provide input to customers to assist them in updating THEIR design. We occasionally will modify some internal sub-component and have typically MANAGED that via an ECN (Engineering Change Control), Registar recommened that we NOT exclude design.

I'm just going to post MY understanding of the standard and please point my in the correct direction if I'm wrong...

7.3.1 Planning
If we have a "design" project, we should PLAN on how we will Manage the project (responsibilities, timing, reviews, etc). Rather straightfoward. I suppose this is simple enough if you do it on a regular basis. The form I'm working on has a Team Member Section and "Planning" section.

7.3.2 Inputs
We have to identify and record our inputs. OK we document and record/retain our ideas/drawings/suggestions/etc that are the driving force behind the design. No Big deal, we DOCUMENT our input whatever form it may be...

7.3.3 Outputs
We have to make sure out outputs meets our input requirements...
A simple example I understand is: The drawing created (output) must match the designs inputs and requirements. What if the input is a drawing?

7.3.4 Review
Now someone has to REVIEW the output, and document that they believe it matches the input. Seems simple but this is the start of my confusion... What if the person providing the input is also creating the output, reviewing, verifying, validating, changing etc... (seems like a waste of time/paperwork).

7.3.5 Verification
Now someone has to VERIFY the output and Document that they have VERIFIED it... Didn't we just do that during review? Is this typically verfication of a physical sample? If not it just seems like a repeat of review.

7.3.6 Validation
Now someone has to VALIDATE what has been reviewed and Document it... How many times do you need to recheck input vs. output (on a simple design)?????

I guess I'm confused about Review vs. Verification vs. Validation, and past posts reading has not clarified it enough for me...

7.3.7 Change
Ok I get this one, if they design changes, we need to redo all the reviewing, verifing and validating...

We have a seperate Engineering Change PROCEDURE that technically incorporates "designs" that are already in production.

Any guidance or additional tips/examples/suggestions are welcome.

Like I stated the harder I work on this the more confused I get. This is partly due to not having a "functional" design process even though we were certified to 1994:9001, also we haven't "designed" anything our self since BEFORE our certifcation to 1994.

I'm not as "freaked" out about handing NEW PRODUCT introduction and minor internal changes. I suppose those should/do fall under the "design" umbrella, but we've never really treated them like it...

Well thanks for any help.
If my rambling is totally confusing, we its the stress and deadlines fogging my mind.

Thanks Bob M
__________________
What exactly am I signing for here? Where's the packing list? PO? Customer Requirements? - Want to play some Xbox360 on Live?
Reply With Quote

Sponsored Links
  #2  
Old 7th July 2003, 01:24 PM
David Hartman's Avatar
David Hartman David Hartman is offline
Courtesy Access

Registration Date: Feb 2003
Location: Marion, IN USA
Age: 57
 
Posts: 514
Thanks Given to Others: 0
Thanked 20 Times in 13 Posts
Karma Power: 66
Karma: 1421
David Hartman is appreciated, and has over 1300 Karma points.David Hartman is appreciated, and has over 1300 Karma points.David Hartman is appreciated, and has over 1300 Karma points.David Hartman is appreciated, and has over 1300 Karma points.David Hartman is appreciated, and has over 1300 Karma points.David Hartman is appreciated, and has over 1300 Karma points.David Hartman is appreciated, and has over 1300 Karma points.David Hartman is appreciated, and has over 1300 Karma points.David Hartman is appreciated, and has over 1300 Karma points.David Hartman is appreciated, and has over 1300 Karma points.
Default

Bob,

Let me start with some questions that may help stimulate some out-of-the-box thinking.

1. Related to the use of "special" forms - How do the design projects get coordinated today (e.g. Use of email, memos, etc.)? If there are currently email communications taking place (as an example) have the author maintain a file of those communiques (your records). In-fact in every instance where a "record" of a comminique or review is to be maintained, look to what may be available currently. Don't re-invent the wheel!

2. You are quite correct that in simplistic designs the "review" and the "verification" activities may in-fact be one and the same. But you also might give consideration to having a peer review of the design - more than one set of eyes looking at the input requirements -Vs- the output.

3. Verification and Validation are NOT the same. Verification looks at paperwork (output -Vs- input). Validation looks at the product -Vs- input requirements (Does the product actually meet the customer's requirements?). This can be accomplished through first article inspection and/or testing of the product (or similar means).

4. Finally, include in your procedures allowances for heritage-based products, those that may not need to go through the entire Design & Development process (based on similar prior designs).

I don't know if I have answered all (or any) of your questions, but I hope this helps.
__________________
David D. Hartman
Reply With Quote
Sponsored Links

  #3  
Old 7th July 2003, 01:36 PM
Bob_M's Avatar
Bob_M Bob_M is offline
Metal Bob

Registration Date: Oct 2002
Location: Bourbonnais, IL - South of Chicago
Age: 36
 
Posts: 351
Thanks Given to Others: 1
Thanked 6 Times in 4 Posts
Karma Power: 45
Karma: 452
Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.
Default

Your post does help some...
In response to your questions:
1) We currently are NOT designing anything... This is the majority of my problem - Lack of experience and practical use

The "special" form I mentioned is being created to eliminate the 6+ form that were created for our 1994:9001 certifcation - which are not being used and are repeative.

Minor product changes are typically handled with ECN (Engineering Changes Notices) Forms which act as a signoff sheet and task list. Those are initiated by ECR (requests) which are more or less the INPUT, which are reviewed and approved as appropriate.

2) OK I'm not crazy Review and Verfication can be the same task (depending on the scale of the design).

3) So Validation typically refers to PHYSICAL review of a product. This helps clear up some confusion.

4) I'll have to make sure I don't forget that part!!

Thanks...
Additional input/comments are welcome.
__________________
What exactly am I signing for here? Where's the packing list? PO? Customer Requirements? - Want to play some Xbox360 on Live?
Reply With Quote
  #4  
Old 7th July 2003, 03:57 PM
M Greenaway's Avatar
M Greenaway M Greenaway is offline
Courtesy Access

Registration Date: Dec 2001
Location: England
 
Posts: 1,643
Thanks Given to Others: 10
Thanked 63 Times in 44 Posts
Karma Power: 80
Karma: 794
M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.
Default

Bob

If I were you I would claim exemption from these requirements - you say you dont design, so dont design !
Reply With Quote
  #5  
Old 9th July 2003, 12:36 PM
Bob_M's Avatar
Bob_M Bob_M is offline
Metal Bob

Registration Date: Oct 2002
Location: Bourbonnais, IL - South of Chicago
Age: 36
 
Posts: 351
Thanks Given to Others: 1
Thanked 6 Times in 4 Posts
Karma Power: 45
Karma: 452
Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.
Default

Quote:
Originally Posted by M Greenaway

Bob

If I were you I would claim exemption from these requirements - you say you dont design, so dont design !
Well I've drafted a very BASIC design project "planning and record sheet" that just covers ISO's requirements.
We have an Engineering Change Procedure in place already (and have had for a while).
I plan on creating a short design "procedure" that outlines the bare requirments and heavily refer to our EC procedure.

I'll talk with our registrar during our Pre-Assessment about excluding it.
Its going to be very hard to "audit" our "design" process when we almost never design... But then again it can depend on how you define "design"...
__________________
What exactly am I signing for here? Where's the packing list? PO? Customer Requirements? - Want to play some Xbox360 on Live?
Reply With Quote
  #6  
Old 9th July 2003, 01:47 PM
howste's Avatar
howste howste is offline
Thaumaturge

Registration Date: May 2003
Location: Utah
 
Posts: 2,416
Thanks Given to Others: 377
Thanked 838 Times in 460 Posts
Karma Power: 206
Karma: 6556
howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.
howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.
Default

Attached is a copy of a "New Product Development Form" I helped create for a small nutritional products company. It basically has all of the information they need to develop new product. It includes inputs, output, reviews, verification, and validation. They don't have a procedure - only the form. It may give you an idea of a way that one company has done it. The company that uses it was certified to ISO 9001:2000 last year.
Attached Files: 1. Scan for viruses before using, 2. Please report any 'bad' files by Reporting the post it is in, 3. Use at your Own Risk.
File Type: doc Sample New Product Development Form.doc (80.0 KB, 464 views)
Reply With Quote
Thanks to howste for your informative Post and/or Attachment!
  #7  
Old 10th July 2003, 09:49 AM
Bob_M's Avatar
Bob_M Bob_M is offline
Metal Bob

Registration Date: Oct 2002
Location: Bourbonnais, IL - South of Chicago
Age: 36
 
Posts: 351
Thanks Given to Others: 1
Thanked 6 Times in 4 Posts
Karma Power: 45
Karma: 452
Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.
Default

Quote:
Originally Posted by howste

Attached is a copy of a "New Product Development Form" I helped create for a small nutritional products company. It basically has all of the information they need to develop new product. It includes inputs, output, reviews, verification, and validation. They don't have a procedure - only the form. It may give you an idea of a way that one company has done it. The company that uses it was certified to ISO 9001:2000 last year.
Interesting and inspiring.
Thanks.
Even though the form it self can't be applied by our company, it does give me some good ideas on how to make a simple
New Design / Modified design or product check list that covers ISO, our basic needs, and actually might work as a record of proper review prior to use...

Hmmm... If only I had more time to get everything PERFECT... Guess that's what continual improvement is for...
__________________
What exactly am I signing for here? Where's the packing list? PO? Customer Requirements? - Want to play some Xbox360 on Live?
Reply With Quote
  #8  
Old 10th July 2003, 02:02 PM
howste's Avatar
howste howste is offline
Thaumaturge

Registration Date: May 2003
Location: Utah
 
Posts: 2,416
Thanks Given to Others: 377
Thanked 838 Times in 460 Posts
Karma Power: 206
Karma: 6556
howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.
howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.
Default

The idea of the form was to keep it simple and try to capture all of the required records for 7.2.1 & 7.3 in one place. This obviously won’t work with more complex designs, but it sounds like the designs you do are fairly straightforward. The first column captures the design inputs (requirements), and the second captures the design outputs. Compare them side-by-side and you have done your review.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Design and Development - Process and Product

Bookmarks

Tags
iso 9001, validation, verification


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Engineering Design Review minutes as Verification & Validation Records Saenz Design and Development - Process and Product 7 2nd October 2008 12:42 PM
Clause 7.3 Design and Development - Verification and Validation Randy Design and Development - Process and Product 3 18th August 2008 01:58 PM
How do I audit the Design Element of ISO 9001 including Verification and Validation? kitkat1 ISO 19011 and ALL Auditing Discussions 3 21st February 2008 02:13 AM
ISO 9001 Clause 7.4.1 Supplier Rating System - Seeking simple system example Al Dyer Supplier Quality Assurance and other Supplier Issues 28 2nd December 2003 03:05 PM
Verification of Calibration Results - ISO 9001 Clause 7.6 Rockanna ISO 17025 - Calibration, Measurement Gages and Test Laboratories 2 13th February 2002 04:41 AM



The time now is 06:53 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts