Process Maps
Good afternoon Cove members, I am curious to hear where you have placed your process maps. I was initially going to make them part of the quality manual but decided that the less in there the better because everytime one is updated I will have to reissue the Qualtiy Manual. Then I thought I would place them seperately in with our controlled documents. Now I am thinking that am going to place them in our procedures maunal that way they are seperated for new revisions yet placed in a more appropriate place. It's late and it's Monday...I may be making an issue out of nothing but I thought if I had some different ideas on this issue, it may save me some time later.
Tracey
|

14th July 2003, 05:59 PM
|
 |
When in doubt - THINK!
Registration Date: Jan 2002
Location: Ontario, Canada
Age: 35
|
|
Posts: 2,247
Thanks Given to Others: 113
Thanked 265 Times in 176 Posts
Karma Power: 217
|
|
Hey Tracey! It's never late around here...I've learned that some of the best advice comes when it's late, we're tired, and our brains are allowed to think outside of the box...that's why Happy Hour was invented!
But, getting to your question, we have a general process map shown in our Quality Manual. It's so basic and just shows the general flow of our main production processes.
We refer to all department based process maps within the Quality Manual, but maintain them outside of the Tier 1 document for the very reason you stated (makes the QMS bible too subject to change).
The software package that we use for document control, takes Process Maps into account and has developed a PCD acronym for our maps (Process Control Document), along with fields for Inputs, Outputs, Work Environment, Resources, etc.
Hope that helps!
__________________
~ Roxane ~
"There's a fine line between genius and insanity. I have erased this line." - Oscar Levant
|

14th July 2003, 06:08 PM
|
|
E-Mails Invalid or Rejected
Registration Date: Jul 2002
Location: WA
|
|
Posts: 331
Thanks Given to Others: 0
Thanked 5 Times in 5 Posts
Karma Power: 0
|
|
Hi Tracey. We us a similar method for our process map. We have a high level map in the quality manual that gives an overview of everything.
We then maintain an electronic copy that has built in links for the more detailed maps. For example, out high level map has a block for the build portion of the process. If you click on that in the electronic version it will bring up a detailed map of the build process. Some of the maps have several levels depending on what process is being covered.
|

14th July 2003, 07:50 PM
|
 |
Super Moderator
Registration Date: Jan 2001
Location: NC, USA
|
|
Posts: 3,140
Thanks Given to Others: 318
Thanked 770 Times in 525 Posts
Karma Power: 255
|
|
We kind of follow the same path or at least similar. There is a section of our QMS that we call data and reference sheets. They are not really work instructions, and not a "record" but more or less a quick reference or guide. All of our org charts, process maps, and "look ups" reside here. Our quality manual does have links to the the process interaction maps and org charts
__________________
"It's fun to have fun, but you have to know how", Dr. Seuss
Man may have invented fire, it took a woman to learn how to play with it.
|

15th July 2003, 03:32 PM
|
 |
Forum Administrator
Registration Date: May 2000
Location: Eskilstuna, Sweden
Age: 49
|
|
Posts: 3,771
Thanks Given to Others: 246
Thanked 244 Times in 172 Posts
Karma Power: 213
|
|
Hi Tracey,
Just like RCBeyette we put only the process overview map in the Manual.
Most of our written procedures contain a process map these days. We do that for several reasons:
Parts of our staff find it easier to follow a process map than the written word.
A process map within the document allows us to put much less in writing.
If the document needs updating the map is updated at the same time.
If we find it hard to describe the process graphically, chances are that there is something wrong with either the process or it's description.
Now... This is our way of doing things... It suits us, and it may or may not suit you. Just make certain that you have thought it through before you start working on it....
/Claes
|

15th July 2003, 06:02 PM
|
 |
$ Contributor
Registration Date: May 2002
Location: Canada
|
|
Posts: 35
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 33 Karma: 133  
|
|
Well I could use happy hour right now  I appreciate everyone's advice. Claes when you said you had a process map for each of your procedures I look at what I had and there is a process map for all created so far except for purchasing....I think I'll add one because I agree with you totally; they are easier for a lot of employees to follow and it make total sence that if we are having a hard time describing the process graphically, that something is wrong. It a great way to test it. Thanks.
|

15th July 2003, 06:08 PM
|
|
|
What is it?
Please - what is a 'process map'? Same as flowchart? Different?
What is its purpose?
Thank you
|

16th July 2003, 09:25 PM
|
 |
Courtesy Access
Registration Date: Mar 2001
Location: Manila, Philippines
Age: 38
|
|
Posts: 639
Thanks Given to Others: 225
Thanked 63 Times in 49 Posts
Karma Power: 73
|
|
Hi Claes,
Where is specifically do I put the Process Map. Can I place it under the Clause 4.1 Quality Management System, General Requirements?  Sorry, If I speak too literal on where I could possibly put the Process Map. And besides, does the new standard requires a Process Map in the Quality Manual?
Thanks in advance.
Best regards,
Raffy
|
Lower Navigation Bar
|
|
|
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|