The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 15th July 2003, 10:14 AM
apestate apestate is offline
Inactive Registered Visitor

Registration Date: Jan 2003
Location: Melbourne, FL
 
Posts: 446
Thanks Given to Others: 2
Thanked 1 Time in 1 Post
Karma Power: 59
Karma: 1151
apestate is appreciated, and has over 1100 Karma points.apestate is appreciated, and has over 1100 Karma points.apestate is appreciated, and has over 1100 Karma points.apestate is appreciated, and has over 1100 Karma points.apestate is appreciated, and has over 1100 Karma points.apestate is appreciated, and has over 1100 Karma points.apestate is appreciated, and has over 1100 Karma points.apestate is appreciated, and has over 1100 Karma points.apestate is appreciated, and has over 1100 Karma points.
Default inspection and test in a job shop

Hello quality professionals

I am just getting started in a career of management in a small machine shop.

There is one thing about my ISO documentation that I haven't yet touched. Inspection and test status, or any provisions regarding the inspection and test part of our service.

I have never worked in a machine shop besides this one and I don't know how to approach it at all.

We do the following: Receive material, machine it on automatics, perform secondary operations, outsource for plating/grinding/heat treating, warehouse & ship.

My questions are: Where would you require inspection? How often? How would you identify parts that have been inspected? Can an machine operator's inspection or sign-off suffice to identify good parts, or for example, is the quality inspector's sign-off required to approve parts for the next operation?
Reply With Quote

Sponsored Links
  #2  
Old 15th July 2003, 10:29 AM
Randy Stewart's Avatar
Randy Stewart Randy Stewart is offline
VINI, VIDI, DORMIVI

Registration Date: Feb 2002
Location: Walled Lake, Michigan
 
Posts: 1,153
Thanks Given to Others: 20
Thanked 79 Times in 51 Posts
Karma Power: 84
Karma: 1481
Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.
Default

Quote:
Originally Posted by atetsade

My questions are: Where would you require inspection? How often? How would you identify parts that have been inspected? Can an machine operator's inspection or sign-off suffice to identify good parts, or for example, is the quality inspector's sign-off required to approve parts for the next operation?
1) Incoming inspection of material, sample plan for machine operators, incoming inspection from outsource and final inspection based on a sample plan.

2) Identification would depend on packaging. You can identify bins, stamp boxes, etc. At the screw machine shop I worked at the operators had 2 bins good and bad parts.

3) Yes the operators signature can suffice. What does your control plan state? How is your process set up. You determine what states that a part can move on.
__________________
"What this country needs is more unemployed politicians." Edward Langley
Reply With Quote
Sponsored Links

  #3  
Old 15th July 2003, 12:06 PM
Bob_M's Avatar
Bob_M Bob_M is offline
Metal Bob

Registration Date: Oct 2002
Location: Bourbonnais, IL - South of Chicago
Age: 36
 
Posts: 351
Thanks Given to Others: 1
Thanked 6 Times in 4 Posts
Karma Power: 45
Karma: 452
Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.
Default

Quote:
Originally Posted by Randy Stewart

1) Incoming inspection of material, sample plan for machine operators, incoming inspection from outsource and final inspection based on a sample plan.

2) Identification would depend on packaging. You can identify bins, stamp boxes, etc. At the screw machine shop I worked at the operators had 2 bins good and bad parts.

3) Yes the operators signature can suffice. What does your control plan state? How is your process set up. You determine what states that a part can move on.
NUMBER ONE TIP: Keep it simple!
But be sure to inspect what NEEDS to be inspected.

Example:
Incoming - Measure/Verify Material Thickness, Width, Length, Hardness, etc BASED on the customer's, the product's and the company's requirements. If hardness was not a factor why would you want to measure it?

In-Process (1st op, 2nd op, last op...) Based on the individual operation and the part what do you need to verify? If the first step is to trim the part to 5in long, Measure the length. (If you are confident with your incoming inspeciton process, why would you need to re-measure thickness and width?) - Keep it simple - We're slowing working on this concept one part at a time (time permitting).

Make your inspection process fit you company and the parts. If you have a complex part, you may need a complex inspection. If you have a simple part, keep the inspection simple.
__________________
What exactly am I signing for here? Where's the packing list? PO? Customer Requirements? - Want to play some Xbox360 on Live?
Reply With Quote
  #4  
Old 15th July 2003, 03:05 PM
Cari Spears's Avatar
Cari Spears Cari Spears is offline
Super Moderator

Registration Date: May 2003
Location: Clinton Township, MI USA
Age: 41
 
Posts: 1,600
Thanks Given to Others: 389
Thanked 134 Times in 80 Posts
Karma Power: 128
Karma: 3499
Cari Spears is appreciated, and has over 1700 Karma points.
Cari Spears is appreciated, and has over 1700 Karma points.Cari Spears is appreciated, and has over 1700 Karma points.Cari Spears is appreciated, and has over 1700 Karma points.Cari Spears is appreciated, and has over 1700 Karma points.Cari Spears is appreciated, and has over 1700 Karma points.
Default

Do you have a control plan for each job or "part family" in some type of format? We create a "Job Process Sheet" for each job. This is basically a router which is stapled to the manufacturing drawing that identifies the necessary manufacturing and inspection operations in the order that they shall occure.

At the completion of each operation there is a space for the machinist or inspector to sign and date. This router and print stay with the product throughout manufacturing, thus identifying the inspection and test status of the product. The next operation should not be performed if any of the manufacturing or inspection operations above it have not been initialed and dated.

As far as what and how frequently to inspect, we have to determine that for each job because each job is different from every other one. Some operations may be critical or complex, others routine. This must also be based on the skill level of the person performing the work. However, we do follow some general rules.

For example, if the product is to be heat treated there is always an in-process inspection operation prior to the heat treat operation. For us, heat treat is not usually the last operation. We ID, OD, Surface and Thread Grind to some tight tolerances and must usually finish after heat treat. It is alot less expensive to rework a piece before heat treat than after!

We do not require an inspector sign off at each operation as we are a shop full of skilled tradesman. We require a FPA at certain operations (done by an inspector) for 5 or more pieces. Otherwise, the machinists initial and date at their operations and the inspectors initial and date at their operations.
Reply With Quote
  #5  
Old 15th July 2003, 05:15 PM
Mike S. Mike S. is offline
An Early 'Cover'

Registration Date: Mar 2002
Location: East Coast US
 
Posts: 1,773
Thanks Given to Others: 24
Thanked 51 Times in 39 Posts
Karma Power: 103
Karma: 1849
Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by atetsade

Hello quality professionals

I am just getting started in a career of management in a small machine shop.

There is one thing about my ISO documentation that I haven't yet touched. Inspection and test status, or any provisions regarding the inspection and test part of our service.

I have never worked in a machine shop besides this one and I don't know how to approach it at all.

We do the following: Receive material, machine it on automatics, perform secondary operations, outsource for plating/grinding/heat treating, warehouse & ship.

My questions are: Where would you require inspection? How often? How would you identify parts that have been inspected? Can an machine operator's inspection or sign-off suffice to identify good parts, or for example, is the quality inspector's sign-off required to approve parts for the next operation?
I'd work with the people that are there who have done this for awhile (I assume this shop has been open prior to your starting there) to determine where inspection steps should be and what the sampling plan(s) should be -- at least as a start.

The operator can certainly act as in-process and final inspector BUT it takes a certain culture for this to work well. I have seen it work very well and I have seen it fail miserably in the exact same industry. By fail miserably I mean lots of rejects intentionally passed on to the next step, and even to the customer, that never should have been passed. Operator self-inspection sounds great, and it can be, but in my experience more places THINK they have the culture for it to work than actually DO have the right culture. However you do it, you must be sure your shipped product is good or else you risk the business.
__________________
Mike S. ("Gun Nut")
And they ask me why I drink....
Reply With Quote
  #6  
Old 16th July 2003, 01:25 PM
Shaun Daly's Avatar
Shaun Daly Shaun Daly is offline
Involved in Discussions

Registration Date: Feb 2003
Location: England
Age: 43
 
Posts: 94
Thanks Given to Others: 0
Thanked 7 Times in 6 Posts
Karma Power: 32
Karma: 152
Shaun Daly is appreciated, and has over 100 Karma points.Shaun Daly is appreciated, and has over 100 Karma points.
Default

I couldnt make out if you were in the automotive industry or not, but a lot of tools are applicable to any manufacturing industry.

3 basic steps I would recommend are

1) Flowchart your manufacturing process.
2) Do a process FMEA to identify danger points.
3) Develop a Control Plan to enforce controls to eliminate the dangers.

There is lots of good info here on this site.

Attached is one format of a process flow.

As for inspection, you could do sample inspection on a batch from each machine, or if you are brave & the process is suitable run SPC on each machine & consider the lot passed if the process is very capable.

Or do away with inspection & Poka Yoke your way along if possible. I wish I could.........
Attached Files: 1. Scan for viruses before using, 2. Please report any 'bad' files by Reporting the post it is in, 3. Use at your Own Risk.
File Type: doc Generic Moulding.doc (167.5 KB, 365 views)
__________________
Im not really insane, its just the job......
Reply With Quote
  #7  
Old 17th July 2003, 01:30 AM
apestate apestate is offline
Inactive Registered Visitor

Registration Date: Jan 2003
Location: Melbourne, FL
 
Posts: 446
Thanks Given to Others: 2
Thanked 1 Time in 1 Post
Karma Power: 59
Karma: 1151
apestate is appreciated, and has over 1100 Karma points.apestate is appreciated, and has over 1100 Karma points.apestate is appreciated, and has over 1100 Karma points.apestate is appreciated, and has over 1100 Karma points.apestate is appreciated, and has over 1100 Karma points.apestate is appreciated, and has over 1100 Karma points.apestate is appreciated, and has over 1100 Karma points.apestate is appreciated, and has over 1100 Karma points.apestate is appreciated, and has over 1100 Karma points.
Default

wow

thank you for all your replies. I wrote you all a nice letter about the whole thing but something happened to my computer.

maybe it's better if I just ask, is it necessary to have a control plan for every part? only the parts that put us at tier 3 to chrysler through this one company actually require any AIAG stuff. I only have to do a PPAP about once a month.

we have process travellers that state the operations performed on each bin of parts, the next process, and the routing. there is no provision for a required inspection on it, and I would redo the whole thing for the sake of clarity and content.

ideally and on parts not requiring any AIAG regulation, could the process traveller suffice? it seems easy to make a little check box next to each line item saying "inspection required." when we fill one of these travelers out for a new job, we'd checkmark the final inspection and any other points where inspection would be required. if no checks but final inspection, inspection would proceed according to the standard sample plan. if checkmarks, sign-off by the quality inspector according to her sample plan. does this seem ok?
Reply With Quote
  #8  
Old 17th July 2003, 04:51 AM
Shaun Daly's Avatar
Shaun Daly Shaun Daly is offline
Involved in Discussions

Registration Date: Feb 2003
Location: England
Age: 43
 
Posts: 94
Thanks Given to Others: 0
Thanked 7 Times in 6 Posts
Karma Power: 32
Karma: 152
Shaun Daly is appreciated, and has over 100 Karma points.Shaun Daly is appreciated, and has over 100 Karma points.
Default

Quote:
Originally Posted by atetsade

wow

maybe it's better if I just ask, is it necessary to have a control plan for every part? only the parts that put us at tier 3 to chrysler through this one company actually require any AIAG stuff. I only have to do a PPAP about once a month.

ideally and on parts not requiring any AIAG regulation, could the process traveller suffice? it seems easy to make a little check box next to each line item saying "inspection required." when we fill one of these travelers out for a new job, we'd checkmark the final inspection and any other points where inspection would be required. if no checks but final inspection, inspection would proceed according to the standard sample plan. if checkmarks, sign-off by the quality inspector according to her sample plan. does this seem ok?
You can get away with generic documents for family parts, especially if you have a large product range from "Pre-ISO" or TS. For proper planning for future products, shouldnt you have to prepare individual documents as per your customer SQA manual?

Another answer I have seen is that the Assessor agreed with the company to have individual documents ready for 25 old products by the time of the next audit.
__________________
Im not really insane, its just the job......
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics

Bookmarks

Tags
inspection, job shop, testing


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
SPC on the shop floor - We are a job shop CMfgT SPC Monitoring and Statistical Analysis Techniques 5 1st October 2008 02:28 PM
Is SPC appropriate in batch system/Job Shop? Bcomer SPC Monitoring and Statistical Analysis Techniques 5 18th September 2008 09:20 AM
SPC in job shop? CNC machine producing a max of 50 pieces per job pradeepm SPC Monitoring and Statistical Analysis Techniques 4 4th November 2005 10:52 AM
Final Inspections - Does 100% inspection really work Jason I Inspection and Test, Sampling and Related Topics 5 4th February 2002 02:35 PM
Quality in Job Shop Environment jgeisler ISO 9001:1994 6 19th May 1999 04:53 PM



The time now is 11:33 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts