Elsmar Cove Forum Sidebar
|
|
|
|
Monitor the Elsmar Forum
|
| Monitor New Forum Posts
|
|
Follow Marc & Elsmar
|
|
|
Elsmar Cove Groups
|
|
|
Sponsor Links
|
|
|
|
|
|
Donate and $ Contributor Forum Access
|
 |
|
Sponsored Links
|
|
|
|
Courtesy Quick Links
|
 Links that Elsmar Cove visitors will find useful in your quest for knowledge:
Howard's International Quality Services
Atul's Symphony Technologies
Marcelo Antunes' SQR Consulting
Bob Doering's Correct SPC - Precision Machining
NIST's Engineering Statistics Handbook
IRCA - International Register of Certified Auditors
SAE - Society of Automotive Engineers
Quality Digest Portal
IEST - Institute of Environmental Sciences and Technology
ASQ - American Society for Quality
|
|
 |
|

4th August 2003, 12:56 AM
|
|
Inactive Registered Visitor
Registration Date: Jul 2003
Location: China/Shanghai
|
|
Posts: 10
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 42
|
|
Product Audits must include raw material or incoming inspection process?
Who can answer to me that Products audit shall include raw material or incoming inspection process or not.
|

4th August 2003, 07:43 AM
|
 |
Inactive Registered Visitor
Registration Date: Aug 2002
Location: Bridgman, Mi 49106
Age: 69
|
|
Posts: 58
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 50 Karma: 15 
|
|
|
Material Included
The way I have always hadnled this is that the material used to maufacture the product is included in the audit as it appears on the control plan. Whatever steps you have for incoming should be included in that audit.
Hope this helps.
__________________
Jay Sturgeon
|

4th August 2003, 07:49 AM
|
|
Appreciated Member
Registration Date: Jun 2002
Location: Silvassa,Near Mumbai in INDIA
Age: 46
|
|
Posts: 316
Thanks Given to Others: 5
Thanked 75 Times in 15 Posts
Karma Power: 77
|
|
|
NO , IT IS NOT REQUIRED, PLEASE SEE THE REQUIREMENT BELOW
8.2.2.3 Product audit
The organization shall audit products at appropriate stages of production and delivery to verify conformance to all specified requirements, such as product dimensions, functionality, packaging, labeling, at a defined frequency
MANOJ MATHUR
|

7th August 2003, 06:11 PM
|
 |
Involved in Discussions
Registration Date: Feb 2003
Location: England
Age: 46
|
|
Posts: 95
Thanks Given to Others: 0
Thanked 12 Times in 8 Posts
Karma Power: 51 Karma: 177  
|
|
|
I think it might depend on how your (product) process flows and control plans are designed.
We have a simple little job where we buy in resin & brass pins, mould a plastic lever & then insert the brass pin during an assembly process.
All of this is included in 1 control plan.
So, walking the CP through from start to finish would include goods-inwards inspection.
__________________
Im not really insane, its just the job......
|

8th August 2003, 09:14 AM
|
 |
Registration Date: Sep 1999
Location: Oklahoma
Age: 71
|
|
Posts: 1,447
Thanks Given to Others: 1
Thanked 48 Times in 27 Posts
Karma Power: 202
|
|
wangxingde asks,
Quote:
|
In Reply to Parent Post by wangxingde
Who can answer to me that Products audit shall include raw material or incoming inspection process or not.
|
IMO yes, I would want to know if the product that I am producing is made from the correct material.
Manoj states,
"The organization shall audit products at appropriate stages of production and delivery to verify conformance to all specified requirements, such as product dimensions, functionality, packaging, labeling, at a defined frequency"
read, "all specified requirements"
"such as" refers to a small list of examples and infers there could be more.
My question is, if you don't verify that the correct material is used during a product audit, when do you do it?
__________________
Sam Goody
|

8th August 2003, 11:09 AM
|
 |
Thaumaturge
Registration Date: May 2003
Location: Utah
|
|
Posts: 4,141
Thanks Given to Others: 992
Thanked 1,917 Times in 1,042 Posts
Karma Power: 485
|
|
|
I agree that all specified requirements must be audited, but also note that it says "at appropriate stages of production and delivery." It doesn't mention at receipt. I believe the intent of the standard is to audit my own product - 7.4.3.1 covers the incoming product.
If I meet the requirements of 7.4.3.1, I would know that the product that I am producing is made from the correct material. The requirements of 7.4.3.1 can be met with product audits, or other methods listed. If product audit must be applied to incoming material, why would they give me other options?
|

8th August 2003, 03:49 PM
|
 |
Involved in Discussions
Registration Date: Feb 2003
Location: England
Age: 46
|
|
Posts: 95
Thanks Given to Others: 0
Thanked 12 Times in 8 Posts
Karma Power: 51 Karma: 177  
|
|
|
For any manufacturing company reciept of raw materials/sub assy is going to be one of the realisation processes - which would be audited. Thus you would check the general process itself.
But when doing a Product Audit, if you dont include reciept/incoming inspection how do you know that you are using the correct materials/satisfying customer requirements for that particular product unless you include them in the audit?
What happens if you are supposed to use approved materials, but do not? Or the wrong material due to a specification error/mix up?
A fault passing through Goods-Recieving can cause far more damage than many other problems, especially if the raw materials have been processed, and sent to the customer, who have sent them to THEIR customer......
As you may have guessed, these are not hypothetical comments...........
__________________
Im not really insane, its just the job......
|

8th August 2003, 04:09 PM
|
 |
Email Address Invalid or Rejected by Recipient System
Registration Date: Jul 2002
Location: Madison, WI
|
|
Posts: 978
Thanks Given to Others: 15
Thanked 44 Times in 26 Posts
Karma Power: 0
|
|
My $.02 worth.
I've had at least 3 PPAPs rejected because there was no mention of verifying the incoming materials were within specification (whether a Purchasing spec - raw mat'l - or a component spec) in the PFMEA or CP. I also used to get caught up in "Where does it say I have to?". As I thought about it, we actually do perform receiving inspection and it actually is part of our process flow and we actually do have procedures for receiving inspection - so why wouldn't it be included in our process flow. All of a sudden my customers' demands made sense and receiving inspection has been a step in our process flow since.
Whether it is a "Product audit", Process audit", or any other kind of "audit", it's not part of our flow because of a " Shall , " Should ", or " Could . It's part of our flow because it makes sense for us.
Sorry for the mini-rambling (had to go through this very exersize with our MR today. She wanted the inspection steps (among some others) pulled out so they couldn't be audited  ). Hope I haven't gotten too far off topic but I'm plenty tired of not using common sense because of the absence of a " shall " in some standard.
I better go tip a few. Have a great weekend all
Bill
|
Lower Navigation Bar
|
|
|
Do you find this discussion thread helpful and informational?
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Forum Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|