The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection, Prints (Drawings), Testing, Sampling and Related Topics
Forum Username


Elsmar Cove Forum Sidebar
Custom Search
Monitor the Elsmar Forum
Monitor New Forum Posts
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Sponsor Links







Donate and $ Contributor Forum Access
Sponsored Links
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's
International Quality Services

Atul's
Symphony Technologies

Marcelo Antunes'
SQR Consulting

Bob Doering's
Correct SPC - Precision Machining


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality

Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 4th August 2003, 12:56 AM
wangxingde wangxingde is offline
Inactive Registered Visitor

 
Registration Date: Jul 2003
Location: China/Shanghai
 
Posts: 10
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 42
wangxingde has disabled his/her Karma.
Question Product Audits must include raw material or incoming inspection process?

Who can answer to me that Products audit shall include raw material or incoming inspection process or not.

Sponsored Links
  #2  
Old 4th August 2003, 07:43 AM
JaySturgeon's Avatar
JaySturgeon JaySturgeon is offline
Inactive Registered Visitor

 
Registration Date: Aug 2002
Location: Bridgman, Mi 49106
Age: 69
 
Posts: 58
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 50
Karma: 15
JaySturgeon has less than 100 Karma points so far.
Send a message via Yahoo to JaySturgeon
Material Included

The way I have always hadnled this is that the material used to maufacture the product is included in the audit as it appears on the control plan. Whatever steps you have for incoming should be included in that audit.

Hope this helps.
__________________
Jay Sturgeon
Sponsored Links

  #3  
Old 4th August 2003, 07:49 AM
Manoj Mathur Manoj Mathur is offline
Appreciated Member

 
Registration Date: Jun 2002
Location: Silvassa,Near Mumbai in INDIA
Age: 46
 
Posts: 316
Thanks Given to Others: 5
Thanked 75 Times in 15 Posts
Karma Power: 77
Karma: 813
Manoj Mathur is appreciated, and has over 700 Karma points.Manoj Mathur is appreciated, and has over 700 Karma points.Manoj Mathur is appreciated, and has over 700 Karma points.Manoj Mathur is appreciated, and has over 700 Karma points.Manoj Mathur is appreciated, and has over 700 Karma points.Manoj Mathur is appreciated, and has over 700 Karma points.Manoj Mathur is appreciated, and has over 700 Karma points.
NO , IT IS NOT REQUIRED, PLEASE SEE THE REQUIREMENT BELOW
8.2.2.3 Product audit

The organization shall audit products at appropriate stages of production and delivery to verify conformance to all specified requirements, such as product dimensions, functionality, packaging, labeling, at a defined frequency



MANOJ MATHUR
  #4  
Old 7th August 2003, 06:11 PM
Shaun Daly's Avatar
Shaun Daly Shaun Daly is offline
Involved in Discussions

 
Registration Date: Feb 2003
Location: England
Age: 46
 
Posts: 95
Thanks Given to Others: 0
Thanked 12 Times in 8 Posts
Karma Power: 51
Karma: 177
Shaun Daly is appreciated, and has over 100 Karma points.Shaun Daly is appreciated, and has over 100 Karma points.
I think it might depend on how your (product) process flows and control plans are designed.

We have a simple little job where we buy in resin & brass pins, mould a plastic lever & then insert the brass pin during an assembly process.

All of this is included in 1 control plan.

So, walking the CP through from start to finish would include goods-inwards inspection.
__________________
Im not really insane, its just the job......
  #5  
Old 8th August 2003, 09:14 AM
Sam's Avatar
Sam Sam is offline

 
Registration Date: Sep 1999
Location: Oklahoma
Age: 71
 
Posts: 1,447
Thanks Given to Others: 1
Thanked 48 Times in 27 Posts
Karma Power: 202
Karma: 1115
Sam is appreciated, and has over 1100 Karma points.Sam is appreciated, and has over 1100 Karma points.Sam is appreciated, and has over 1100 Karma points.Sam is appreciated, and has over 1100 Karma points.Sam is appreciated, and has over 1100 Karma points.Sam is appreciated, and has over 1100 Karma points.Sam is appreciated, and has over 1100 Karma points.Sam is appreciated, and has over 1100 Karma points.Sam is appreciated, and has over 1100 Karma points.
wangxingde asks,
Quote:
In Reply to Parent Post by wangxingde

Who can answer to me that Products audit shall include raw material or incoming inspection process or not.
IMO yes, I would want to know if the product that I am producing is made from the correct material.

Manoj states,
"The organization shall audit products at appropriate stages of production and delivery to verify conformance to all specified requirements, such as product dimensions, functionality, packaging, labeling, at a defined frequency"

read, "all specified requirements"

"such as" refers to a small list of examples and infers there could be more.
My question is, if you don't verify that the correct material is used during a product audit, when do you do it?
__________________
Sam Goody
  #6  
Old 8th August 2003, 11:09 AM
howste's Avatar
howste howste is offline
Thaumaturge

 
Registration Date: May 2003
Location: Utah
 
Posts: 4,141
Thanks Given to Others: 992
Thanked 1,917 Times in 1,042 Posts
Karma Power: 485
Karma: 14700
howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.
howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.
I agree that all specified requirements must be audited, but also note that it says "at appropriate stages of production and delivery." It doesn't mention at receipt. I believe the intent of the standard is to audit my own product - 7.4.3.1 covers the incoming product.

If I meet the requirements of 7.4.3.1, I would know that the product that I am producing is made from the correct material. The requirements of 7.4.3.1 can be met with product audits, or other methods listed. If product audit must be applied to incoming material, why would they give me other options?
  #7  
Old 8th August 2003, 03:49 PM
Shaun Daly's Avatar
Shaun Daly Shaun Daly is offline
Involved in Discussions

 
Registration Date: Feb 2003
Location: England
Age: 46
 
Posts: 95
Thanks Given to Others: 0
Thanked 12 Times in 8 Posts
Karma Power: 51
Karma: 177
Shaun Daly is appreciated, and has over 100 Karma points.Shaun Daly is appreciated, and has over 100 Karma points.
For any manufacturing company reciept of raw materials/sub assy is going to be one of the realisation processes - which would be audited. Thus you would check the general process itself.

But when doing a Product Audit, if you dont include reciept/incoming inspection how do you know that you are using the correct materials/satisfying customer requirements for that particular product unless you include them in the audit?

What happens if you are supposed to use approved materials, but do not? Or the wrong material due to a specification error/mix up?

A fault passing through Goods-Recieving can cause far more damage than many other problems, especially if the raw materials have been processed, and sent to the customer, who have sent them to THEIR customer......

As you may have guessed, these are not hypothetical comments...........
__________________
Im not really insane, its just the job......
  #8  
Old 8th August 2003, 04:09 PM
Bill Ryan - 2007's Avatar
Bill Ryan - 2007 Bill Ryan - 2007 is offline
Email Address Invalid or Rejected by Recipient System

 
Registration Date: Jul 2002
Location: Madison, WI
 
Posts: 978
Thanks Given to Others: 15
Thanked 44 Times in 26 Posts
Karma Power: 0
Karma: 1112
Bill Ryan - 2007 is appreciated, and has over 1100 Karma points.Bill Ryan - 2007 is appreciated, and has over 1100 Karma points.Bill Ryan - 2007 is appreciated, and has over 1100 Karma points.Bill Ryan - 2007 is appreciated, and has over 1100 Karma points.Bill Ryan - 2007 is appreciated, and has over 1100 Karma points.Bill Ryan - 2007 is appreciated, and has over 1100 Karma points.Bill Ryan - 2007 is appreciated, and has over 1100 Karma points.Bill Ryan - 2007 is appreciated, and has over 1100 Karma points.Bill Ryan - 2007 is appreciated, and has over 1100 Karma points.
My $.02 worth.

I've had at least 3 PPAPs rejected because there was no mention of verifying the incoming materials were within specification (whether a Purchasing spec - raw mat'l - or a component spec) in the PFMEA or CP. I also used to get caught up in "Where does it say I have to?". As I thought about it, we actually do perform receiving inspection and it actually is part of our process flow and we actually do have procedures for receiving inspection - so why wouldn't it be included in our process flow. All of a sudden my customers' demands made sense and receiving inspection has been a step in our process flow since.

Whether it is a "Product audit", Process audit", or any other kind of "audit", it's not part of our flow because of a "Shall , "Should ", or "Could . It's part of our flow because it makes sense for us.

Sorry for the mini-rambling (had to go through this very exersize with our MR today. She wanted the inspection steps (among some others) pulled out so they couldn't be audited ). Hope I haven't gotten too far off topic but I'm plenty tired of not using common sense because of the absence of a "shall " in some standard.

I better go tip a few. Have a great weekend all

Bill
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection, Prints (Drawings), Testing, Sampling and Related Topics

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Is Material Certification Required for Incoming Material (Receiving) Inspection? Terry Supplier Quality Assurance and other Supplier Issues 10 27th August 2010 04:33 AM
If the inspection and analysis of raw material is very expensive? blue moon ISO 9000, ISO 9001, and ISO 9004 - Questions and Discussions 19 30th July 2009 07:21 AM
Certificate of Conformity? Supplier incoming material inspection ldq1979 CE Marking (Conformité Européene) / CB Scheme 3 5th August 2008 10:54 AM
Medical Device Manufacturer: Incoming Raw Material Inspection hitesh ISO 13485 and ISO 14969 - Medical Devices - Quality Management Systems 5 22nd July 2008 06:36 PM
Where's the value add in product audits when your process is inspection based? andrewg ISO/TS 16949 - International Automotive Quality Systems Standard 9 23rd February 2006 03:11 AM



The time now is 07:25 AM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, Olde West Chester, Ohio 45069-1929
513 341-6272