The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Contract Review Process


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 20th September 2000, 11:35 AM
AJPaton
Unregistered Guest

 
Posts: n/a
BIG Smile 4.3 Contract Review - Configured Product - Configurable subassembly

4.3.2 says:

"Before submission of a tender, or the acceptance of a contract or order (statement of requirement), the tender, contract or order shall be reviewed by the supplier to ensure that:
a) the requirements are adequately defined and documented;..."

We have a product with a configurable subassembly, which is defined per system. However, this information does not always get here before the order is entered.

We know that we can build all configurations, since the differences are only # and spacing. However, the shop cannot finish building the job without the configuration information.

Question: Does 4.3.2 a) require that this system specific documentation be given before the order is entered, or can we have a "drop dead" date where this must be entered or the ship date wil be pushed out?

Any hints on how to arrange this would also be appreciated, as ramping production seems to lead to less, rather than more, documentation.

Thanks,

AJP
Reply With Quote

Sponsored Links
  #2  
Old 20th September 2000, 02:12 PM
CarolX's Avatar
CarolX CarolX is offline
Super Moderator

Registration Date: Jun 2000
Location: North of Chicago,Illinois, USA
Age: 49
 
Posts: 2,087
Thanks Given to Others: 419
Thanked 314 Times in 234 Posts
Karma Power: 176
Karma: 4810
CarolX is appreciated, and has over 1700 Karma points.
CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.
AJ,

Sounds like, for your purposes, you have satisfied the requirements. The requirements are adequately defined to allow you to begin production. But I would definitly add a "drop dead" date to prevent shipping the wrong produt to the customer.

Reply With Quote
Sponsored Links

  #3  
Old 20th September 2000, 02:21 PM
AJPaton
Unregistered Guest

 
Posts: n/a
Covering Ass

Thanks Carol, any experience with setting up due dates for that sort of information? We're spending a bit too much time frantically calling the customer on or just before the ship date.

I've checked over the Work Instructions and they don't address this issue, since it's a recent development.

Thanks,

AJP
Reply With Quote
  #4  
Old 21st September 2000, 11:13 AM
Katie Restorick
Unregistered Guest

 
Posts: n/a
Read This!

I am having a similar problem, we do not have an "official" order for our customer but we are having to forcast their requirement. This is because they never give us enough notice to complete an order before they require delivery. This is a very large scale project and we do have a letter of intent. Is building and reserving systems before having the official order allowable under QS 9000?
Reply With Quote
  #5  
Old 22nd September 2000, 01:07 AM
CarolX's Avatar
CarolX CarolX is offline
Super Moderator

Registration Date: Jun 2000
Location: North of Chicago,Illinois, USA
Age: 49
 
Posts: 2,087
Thanks Given to Others: 419
Thanked 314 Times in 234 Posts
Karma Power: 176
Karma: 4810
CarolX is appreciated, and has over 1700 Karma points.
CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.
AJ - Sorry, no experience setting up due dates, but try to calculate your minimum lead time, and perhaps pad it by a few days.

Katie - Sorry, I am not a QS person. Many that frequent here are, so check back for another response.
Reply With Quote
  #6  
Old 25th September 2000, 08:54 PM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Yin Yang

If you're working on a letter of intent be sure you can show how customer requirements are specified / communicated.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Contract Review Process

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
ISO 9001:2008 Contract Review for a business that doesn't have formal contract review corwall Contract Review Process 11 15th October 2009 08:22 PM
Contract Review - Interpreting the intent of Contract Review - Open POs - Clause 4.3 LaurieB Contract Review Process 6 17th May 2009 11:30 AM
Process vs. Product on Control Plan - Weld a nut attachment on the subassembly Pudge FMEA and Control Plans 3 13th January 2009 04:48 PM
AS9100 - 7.2 Contract Review - How others do Contract Review in a documented fashion Garry Contract Review Process 6 11th April 2005 09:52 PM
Best way to implement Contract Review? ISO 9001 - Contract Review Arturo Rosales Contract Review Process 6 20th August 1999 06:49 PM



The time now is 05:54 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts