The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 1 votes, 5.00 average. Display Modes
  #1  
Old 20th August 2003, 10:27 AM
Stevenli's Avatar
Stevenli Stevenli is offline
E-Mails Invalid or Rejected

Registration Date: May 2003
Location: Shanghai/China
Age: 34
 
Posts: 18
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 10
Stevenli has less than 100 Karma points so far.
Question Cmk and Cpk - When will we need to calculate Cmk? Machine Capability

Dear all,

When will we need to calculate Cmk? Sometimes we can't collect the equipment data, then we have to collect the data from the production characteristic to calculate the Cmk. Is it acceptable? If it's true, how to decide the tolerance?

And in this case what's the difference with Cpk, long -term, short-term?

Anybody can give me some hints would be highly appreciated.

Steven
Reply With Quote

Sponsored Links
  #2  
Old 20th August 2003, 03:12 PM
Paul F. Jackson Paul F. Jackson is offline
Involved - Posts

Registration Date: Feb 2001
Location: Canton, MI USA
Age: 55
 
Posts: 114
Thanks Given to Others: 1
Thanked 46 Times in 28 Posts
Karma Power: 52
Karma: 703
Paul F. Jackson is appreciated, and has over 700 Karma points.Paul F. Jackson is appreciated, and has over 700 Karma points.Paul F. Jackson is appreciated, and has over 700 Karma points.Paul F. Jackson is appreciated, and has over 700 Karma points.Paul F. Jackson is appreciated, and has over 700 Karma points.Paul F. Jackson is appreciated, and has over 700 Karma points.Paul F. Jackson is appreciated, and has over 700 Karma points.
Default

Yes, it is usefull, but not widely used.

There is a nice article about Cpm (with a link to Cpk and Ppk) at *** DEAD LINK REMOVED ***

Cpm is like Cpk (or, more correctly, like Ppk) but you calculate the standard deviation from the TAGET, instead of from the AVERAGE (i.e. inside the square root you use (Xi-T)^2 instead of (Xi-Xbar)^2).

When the process is centered, Pp, Ppk and Cpm are the same (I am assuming that the center of the specification is the target, what is NOT allways the case)

Pp does not change when off-centering (it just compares specification against the variation arround the process average.

Ppk gets lower when off-center but does not take the target into account. It compares the distance between the average and the specification limit against the variation arround the process average.

Cpm gets lower when off-target. It compares the specification against the variation arround the target.

You can think of the variation arround the target as the varieton of the individuals arround the process average plus the distance between the process average and the target (just the concept, not mathematically correct).

For example, imagine that you have a process that you want to run at Ppk 1.5. That is that the process average is at 4.5 sigmas form the closest specification limit. If you improve the process variation (reduce sigma) you can move the average closer to the specification limit (to keep 4.5 sigmas) and the Ppk is the same. However, the Cpm would have worsened, because the average distance of the individuals from the target would have increased due to the "distance between the process averaage and the target" term.

We could say that Cpm is more "loss function" (aim to the target) focused, while Ppk is more "goal post" (meet the specification) focused.

Now, as Stan said, if "zero" is a phisycal lower limit (like in ovality, rughness, etc.), then Cpk or Ppk may be more suitable (using the upper specification limit). Even in that case, Cpm can give you extra information.

Let's take ovality as an example. Let's say that the specifiecation is 0.1 max. Just to simplify the example, let's say that the ovality is normally distributed (which most probably will NOT be the case). Let's say that you current process delivers an average ovality of 0.05 with a standard deviation of 0.02. That leads to a Ppk=0.83 and a Cpm=0.31.

Now let's say taht you make a change in the process with which you can cut variation to 0.01, but the varage ovaliti goes to 0.07. Now you got a Ppk=1 and a Cpm=0.24. Leave the absolute vaues and think of the change.

The Cpk has improve because the "worst case" parts are "more in specification". Average + 3S = 1.1 before and 1 after. You will have more parts inside the specification.

The Cpm worsens because, even with an improving contribution due the reduced variation, the worsening contribution due to the larger of-target increase has more weight. You want "zero" ovality, on average you had 0.5 before and you have 0.7 now. You will have more parts farther from the target.

So, you seem to have a god capability: "My current process deviates a maximum of less than one half of the tolerance width". Maybe you should use the Cpk or Ppk to inform your customer about your ability to meet the specification and monitor the evolution of Cpm (regardless its absolute value) to direct your improvement efforts. When you improve Cpm you ALLWAYS improve Cpk.

From the link at the beginning of this post:

"Regardless of the target in relation to the specifications, the focus should always be on making the product to target with minimum variation. Cpm is the capability index that most accurately depicts this."

Last edited by Paul F. Jackson; 20th August 2003 at 03:15 PM.
Reply With Quote
Sponsored Links

  #3  
Old 20th August 2003, 05:46 PM
Atul Khandekar's Avatar
Atul Khandekar Atul Khandekar is offline
Forum Administrator

Registration Date: Mar 2000
Location: Pune, India
Age: 47
 
Posts: 1,073
Thanks Given to Others: 83
Thanked 84 Times in 55 Posts
Karma Power: 90
Atul Khandekar has disabled his/her Karma.
Send a message via Skype™ to Atul Khandekar
Default

Quote:
Originally Posted by Stevenli

Sometimes we can't collect the equipment data, then we have to collect the data from the production characteristic to calculate the Cmk.
Steven,
I haven't clearly understood what you mean by this statement. I believe Cmk pertains to machine capability and the data does come from a production characteristic for which specs or tolerance limits would be defined. you need to ensure that the variation in the process is due to machine alone.

Cmk is calculated just as Ppk. The idea is that you must do what you can to exclude every source of variation except the machine itself (same operator, same gauge, same enviroment, same raw material, nearly same time). To do so, the ussual procedure is to let the process stabilize and then collect the sample with all consecutive parts. Be careful, you shold keep the right order and avoid mixing the parts to assure that the subgroups are actually in the same order as their parts where produced. In that way you can plot a control chart, asses for stability, and calculate Cm/Cmk just as if it was Pp/Ppk.

A lot of confusion exists about capability metrics because different companies use different symbols to define various facets of capability. Before you can truly understand what a particular index means, you must look at its formula as well as how the data are supposed to be collected for its calculation.

Having given that disclaimer, the Ppk index is typically used to measure short-term process performance capability. The formula is as follows:

Ppk = Minimum (Ppl, Ppu)

where Ppl = (mu - LSL) / (3 sigmaST) and Ppu = (USL - mu) / (3 sigmaST)

Here, mu is the process average (estimated from X-double bar) and sigmaST is the short-term standard deviation, estimated from RMS formula.

I have seen the Cmk index defined in two different ways. In the first, it is used to measure machine capability (the "m" stands for "machine"). Its formula is similar to the one given above for Ppk, but the data used to estimated mu and sigmaST come from a special study conducted in such a manner as to focus on only process variation originating from the machine under study. Thus, the same operator would be used for the entire study, the same batch of material, the same setup, etc. Be aware that some companies will replace the 3 sigmaST with 4 sigmaST.

In the second definition I have seen, Cmk is used to quantify the performance of a measurement system, so here the "m" stands for "measurement." Again, its definition is similar to that given above for Ppk, but the data come from a properly conducted gage study. To further complicate the issue, some companies use 5 sigmaST in place of the 3 sigmaST that is normally used.

As you can see, to really appreciate the difference between any two capability metrics, you must first obtain the formulas and then an understanding of how the data are to be collected. Without knowing this, there really is no way to correcttly answer the question "What's the difference between Cpk and Cmk?".

By the way, I have also seen the following indexes: Cm, Cpm, and Cpmk !

Hope this helps.
__________________
You are never given a wish without also being given the power to make it true. You may have to work for it, however. ~Richard Bach
Reply With Quote
  #4  
Old 20th August 2003, 09:18 PM
Stevenli's Avatar
Stevenli Stevenli is offline
E-Mails Invalid or Rejected

Registration Date: May 2003
Location: Shanghai/China
Age: 34
 
Posts: 18
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 10
Stevenli has less than 100 Karma points so far.
Default

Hi, Atul

Thank you for your information.

Because some consultants said if we can collect the data from the machine itself, then it's better to calculate the Cmk. Otherwise we can collect production characterisitic data to get Cmk.

According your post and reference if I ensure the process variation only from machine, then can I say Cmk is equal to short-term Cpk?

Best regards,
Steven
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.

Bookmarks

Tags
cmk, cpk, machine capability


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
How to conduct machine capability (Cmk) study? maximillen010 SPC Monitoring and Statistical Analysis Techniques 5 3rd October 2009 03:54 AM
Machine Capability Study - Cpk (Cmk) of an R/F testing machine qamobile Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 5 27th May 2009 07:04 PM
Cmk (Machine Capability) - Case study michu Capability, Accuracy and Stability - Process, Machine, etc. 5 27th June 2008 09:05 PM
A question about Cpk and Cmk - Can we use Cpk to replace Cmk? sunwen Capability, Accuracy and Stability - Process, Machine, etc. 1 11th April 2007 08:45 AM
Confused about the machine capability index Cmk qualityengineer Capability, Accuracy and Stability - Process, Machine, etc. 1 9th May 2006 02:17 PM



The time now is 10:08 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts