The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 10013 - Quality Management System (QMS) Manuals


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 1 votes, 4.00 average. Display Modes
  #1  
Old 2nd September 2003, 03:03 PM
Gman2's Avatar
Gman2 Gman2 is offline
Involved - Posts

Registration Date: Aug 2003
Location: Michigan
Age: 38
 
Posts: 51
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 27
Karma: 10
Gman2 has less than 100 Karma points so far.
Please Help! How BIG is Your Quality Manual? Now that I have your attention, Big = # of Pages

Your Quality Manual that is!
Anyway I just took a look at the manual I have inherited (2000 standard)
and it is a whopping 91 PAGES!!!!!
DAAAAAAAA!!!!!
It's killing me to read it, I keep waiting for Gandalf to appear in it somewhere or some Hobbits or someting!
Is it just me or is this thing a little looong??
We are not that large of a company either, around 35 employes.
I'm having a nervous breakdown, I have taken over this QM position from a disgruntled old guy who left so much undone and neglected.
Oh and also I ws left with 3 Majors and 4 minors to respond to by next week and to fix by Mid November.
The noncons should not be a huge problem but this long winded redunant mess will be.

Also none of the (QP's) quality procedures are numbered to the new standard, or the WI's, and they are all done in some 1980 software that no one uses anymore.
Oh yeah and there are like 14 copys of the procedure and WI books floating around, and 7 copys of the Quality Manual (Bible).

Okay now here is the part where you all can help me
Anyone have any examples of compliant manuals that have NOT been written by Tolken??
Bacially he had his set up like evey ELEMENT (like 5.4.2, 5.5.1, 5.5.2) has it's own page, own title block and sign off area (with matching matrix in front of each Clause)

I would like to re-vamp this thing but it might be a little more than I can do right now having to fix these noncons up.

I need a prozac!


G.
Reply With Quote

Sponsored Links
  #2  
Old 2nd September 2003, 03:17 PM
Sean Kelley's Avatar
Sean Kelley Sean Kelley is offline
Involved - Posts

Registration Date: May 2003
Location: Glasgow, KY
Age: 38
 
Posts: 117
Thanks Given to Others: 25
Thanked 5 Times in 5 Posts
Karma Power: 32
Karma: 168
Sean Kelley is appreciated, and has over 100 Karma points.Sean Kelley is appreciated, and has over 100 Karma points.
Default

We have a manual that is likely bigger than that if you count QM and procedures. We also have over 900 people and are a fullly integrated steel mill. As far as needing an example, we just took the standard and put it into our own terms. If you read the standard it would read very closely to our QM. Our procedures break down more of who wil do what by when. Then there are the supporting work instructions that say how we will do it. Hope this helps.
__________________
MILO2000
Reply With Quote
Sponsored Links

  #3  
Old 2nd September 2003, 03:23 PM
Jimmy Olson Jimmy Olson is offline
E-Mails Invalid or Rejected

Registration Date: Jul 2002
Location: WA
 
Posts: 331
Thanks Given to Others: 0
Thanked 5 Times in 5 Posts
Karma Power: 0
Karma: 226
Jimmy Olson is appreciated, and has over 200 Karma points.Jimmy Olson is appreciated, and has over 200 Karma points.Jimmy Olson is appreciated, and has over 200 Karma points.
Default

Welcome to the cove

91 pages is defiantely way too long. There are several examples posted here that you can look over to get ideas.

Here is one thread that has discussions about the structure of the manual:
http://Elsmar.com/Forums/showthread.php?t=3734

If you do a search you can find examples posted in various threads (they're scattered around, otherwise I would post a link)
Reply With Quote
  #4  
Old 2nd September 2003, 03:35 PM
Aaron Lupo's Avatar
Aaron Lupo Aaron Lupo is offline
QA-LA

Registration Date: Jan 2000
Location: Rochester, NY
Age: 39
 
Posts: 897
Thanks Given to Others: 5
Thanked 37 Times in 30 Posts
Karma Power: 71
Karma: 722
Aaron Lupo is appreciated, and has over 700 Karma points.Aaron Lupo is appreciated, and has over 700 Karma points.Aaron Lupo is appreciated, and has over 700 Karma points.Aaron Lupo is appreciated, and has over 700 Karma points.Aaron Lupo is appreciated, and has over 700 Karma points.Aaron Lupo is appreciated, and has over 700 Karma points.Aaron Lupo is appreciated, and has over 700 Karma points.
Default

Our Quality Manual is now about 21 pages long, it used to be 7 pages until my boss got his hands on it! 91 pages is a killer, is that just your QM or does it include your procedures as well?
Reply With Quote
  #5  
Old 2nd September 2003, 03:57 PM
Bob_M's Avatar
Bob_M Bob_M is offline
Metal Bob

Registration Date: Oct 2002
Location: Bourbonnais, IL - South of Chicago
Age: 36
 
Posts: 351
Thanks Given to Others: 1
Thanked 6 Times in 4 Posts
Karma Power: 45
Karma: 452
Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.Bob_M is appreciated, and has over 400 Karma points.
Default

Quote:
Your Quality Manual that is!
Anyway I just took a look at the manual I have inherited (2000 standard)
and it is a whopping 91 PAGES!!!!!
Is it just me or is this thing a little looong??
We are not that large of a company either, around 35 employes.
I'm having a nervous breakdown, I have taken over this QM position from a disgruntled old guy who left so much undone and neglected.
First: Take a breath or crackle your knuckles. I can semi-relate to being left with a F*#'ed system by the last QM.

The lenght does SOUND excessive. Does the manual include ALL of your procedures? If it does, you'll have to discuss with the appropriate people, if this is were you WANT the procedures published.
Quote:
Also none of the (QP's) quality procedures are numbered to the new standard, or the WI's, and they are all done in some 1980 software that no one uses anymore.
Oh yeah and there are like 14 copys of the procedure and WI books floating around, and 7 copys of the Quality Manual (Bible).
STOP! The procedures and Work Instructions DO NOT need to be renumbered unless you want/need them to be for internal reasons. Don't give your self more work! The old software may be a problem as you need to update.
Are the copies of the books and manuals a problem? If not work on that later. If yes, figure out who really needs what, and create a simple distribution LOG so you that future retrevial of the books will be easier (not ISO required but a good/simple idea).
Quote:
Okay now here is the part where you all can help me
Anyone have any examples of compliant manuals that have NOT been written by Tolken??
Bacially he had his set up like evey ELEMENT (like 5.4.2, 5.5.1, 5.5.2) has it's own page, own title block and sign off area (with matching matrix in front of each Clause)
A page for each clause is rediculous, UNLESS you have a narative for each section and how it applys to your company. Our 1994 based manual had a new page for each of the 20 element, but NOT one for each clause. Our new manual just keeps flowing (no page breaks).
Quote:
I would like to re-vamp this thing but it might be a little more than I can do right now having to fix these noncons up.
What are the NonCons? Are any of the them related to the manual and/or its distribution? Fix the NonCons then the manual if not.
Quote:
I need a prozac!
That's how I felt for about a year, and probably will again at some point!

----------
Our "new" manual has:
Cover Page, Table of Contents, brief company introduction, a section where management signed the manual, then I basically rewrote the entire ISO standard and inserted a few "company" specific details and reference to seperate procedures/documents, revision history, organization chart (1page), process map (1page), and a Procedure listing with an ISO 1994 and 2000 cross reference. TOTAL Pages = 19
(We have a seperated Printed binder for procedures that is only used by the auditor. Additional documented are distributed as needed one at time).

I did not have time to make a "user-friendly" or very customized manual, so I kept it simple. I do need to do some tweaking per our Pre-Asssessment audit, but overall it covers the ISO requirements for a manual. NOTE: Our manual structure is NOT what ISO requires, it was just the simplest/quickest way to update it for ME.

Try to keep it simple and fix one problem at a time. Then keep visiting this site for help and ideas!
__________________
What exactly am I signing for here? Where's the packing list? PO? Customer Requirements? - Want to play some Xbox360 on Live?
Reply With Quote
  #6  
Old 2nd September 2003, 04:18 PM
Randy Stewart's Avatar
Randy Stewart Randy Stewart is offline
VINI, VIDI, DORMIVI

Registration Date: Feb 2002
Location: Walled Lake, Michigan
 
Posts: 1,153
Thanks Given to Others: 20
Thanked 79 Times in 51 Posts
Karma Power: 84
Karma: 1481
Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.
Default

Currently ours is 18 pages, it was 97 for the QS model (rehash of the standard). The current "Operations Manual" is an integrated manual for ops (of course), 14001, 5S, TS, 9K2K, etc. It took awhile to map out the cross connects but once that was complete the rest seemed to fall into place.

My suggestion would be to leave the manual alone for now (you're probably the only one whose looked at it since Gandolph) so focus on your system. Work the bugs out of process, procedures, etc. then concern yourself with that manual. IMO, if US Steel can get away with a 15 pager no one should have more than 30 pages!
__________________
"What this country needs is more unemployed politicians." Edward Langley
Reply With Quote
  #7  
Old 2nd September 2003, 04:38 PM
Claes Gefvenberg's Avatar
Claes Gefvenberg Claes Gefvenberg is offline
Forum Administrator

Registration Date: May 2000
Location: Eskilstuna, Sweden
Age: 49
 
Posts: 3,771
Thanks Given to Others: 246
Thanked 244 Times in 172 Posts
Blog Entries: 13
Karma Power: 213
Karma: 4951
Claes Gefvenberg is appreciated, and has over 1700 Karma points.
Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by Gman2

Your Quality Manual that is!
Anyway I just took a look at the manual I have inherited (2000 standard)
and it is a whopping 91 PAGES!!!!!
---

I need a prozac!

G.
Hullo G,

Stay off the Prozac and have a look in the thread HELP - Tips on updating Manual (1994 - 2000)

There are ways to stay off the ulcer candidates list. Our manual is nine pages with room to spare.

/Claes
__________________
Hanlon's Razor.
Never attribute to malice that which can be adequately explained by stupidity.
User Groups: Elsmar Cove Cycling Enthusiasts Formula 1 fanatics Photo freaks Readers Corner
Reply With Quote
  #8  
Old 2nd September 2003, 05:15 PM
Sean Kelley's Avatar
Sean Kelley Sean Kelley is offline
Involved - Posts

Registration Date: May 2003
Location: Glasgow, KY
Age: 38
 
Posts: 117
Thanks Given to Others: 25
Thanked 5 Times in 5 Posts
Karma Power: 32
Karma: 168
Sean Kelley is appreciated, and has over 100 Karma points.Sean Kelley is appreciated, and has over 100 Karma points.
Default

What is Marc's famous quote

"One size does not fit all"

So I can defintely say that if a small QM works for you that is great and more manageable. However some combine QM and PM into one and for many that do it this way I don't think you can say how many pages it should or should not be. General rule of thumb is that the QM says why yuo are going to do something and closely mimics the standard. The PM is where more details tend to go. If you separate these then it is easier to keep small but easier to forget to update the other manual. Pluses and minuses to each but you must do what will work for you. Never use one of those PJ template QM. That is just a great sales tool for PJ to sucker in those who are uninformed.
__________________
MILO2000
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 10013 - Quality Management System (QMS) Manuals

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Last ad from The BIG 3 sorin Controversial Discussion Topics 15 22nd December 2008 09:48 AM
ASQ's (American Society for Quality) Next Big Thing...... Stijloor ASQ, IRCA, IATF, RABQSA, and Related Organizations 16 18th June 2008 04:40 PM
Aftermarket and Big Three Supplier - How does this affect the quality system? Mike Smith ISO/TS 16949 - International Automotive Quality Systems Standard 3 7th August 2006 03:36 AM
Difficult to do according to PPAP Manual? Big plastic parts, over 100 dimensions Mobobo APQP and PPAP 5 28th August 2005 05:20 AM
Big Thanks neonshades Coffee Break and Water Cooler Discussions 3 21st December 2004 03:02 AM



The time now is 12:19 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts