The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > APQP and PPAP


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 6th May 1999, 12:10 PM
Daryl MacNeil
Unregistered Guest

 
Posts: n/a
Default PPAP for Electronics

Hello all,
My company is an electronics manufacturer currently supplying a division of GM. The inclusion of PPAP requirements has been slowly mandated to us, but we are having some confusion as to the application of some of the elements.
The confusion involves the inclusion of dimensional data for items without true finished product dimensions (i.e. wiring harnesses) and how to determine which material specifications are required for a circuit card assembly (i.e. would we require material specifications for every resisitor on a card?)
We have asked our customer contact for some clarification, but any feedback on how to apply the PPAP requirements to electronics would be appreciated.

Thanks in advance,
Daryl
Reply With Quote

Sponsored Links
  #2  
Old 9th May 1999, 12:40 AM
Batman
Unregistered Guest

 
Posts: n/a
Default

PPAP is the final step of your project development, where you swear to have accomplished all features on a customer's specification or drawing. You have developed the process, the controls, the instructions; you purchased the correct raw materials for your assembly. The PPAP submission is verifying all this.

There must be some features or specifications that were required by the customer so he will purchase the items you are producing. The wiring harness, for example, must have some length requirement, or gage size, or something. These requirements must be verified and presented as either certifications with data (in the case of raw material supplied, for example, one of the requirements of QS9000) and / or data you generate from your manufacturing process. If you do APQP well, most of the information is ready by the time of PPAP submission.

But be sure to take the guidance of your customer. I do not have the PPAP manual here, but I think you may be required to have a level III for all new projects, but the actual submission may be a level I or II depending upon your customer's requirement. If APQP is done well, most of the required documentatiom is done as the project is brought on.
Reply With Quote
Sponsored Links

  #3  
Old 16th May 1999, 08:01 AM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,567 Times in 1,019 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11564
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Default

Take a good look at the customer's stated requirements. Wire length, type of connector(s), etc. As far as dimensional issues, are there 'prints' of your finished product? Dimensional requirements would be (should be) defined there.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > APQP and PPAP

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
PPAP etiquette - Full PPAP Requested for Minor Dimensional Change Carl Pease APQP and PPAP 15 19th November 2007 05:35 PM
PPAP and the IMDS (International Material Data System) - What did I get myself into? silentrunning RoHS, REACH, ELV, IMDS and Restricted Substances Related Regulations 10 25th September 2007 02:32 PM
TS 16949 PPAP Material Breakdown Analysis - Steel specifications for WSD-MIA333-A2 trainer ISO/TS 16949 - International Automotive Quality Systems Standard 4 9th February 2006 10:23 PM
AIAG's PPAP Reference Material - Seeking an electronics copy such as a .pdf file DAHLIA APQP and PPAP 4 19th January 2005 04:07 AM
PPAP Evidence - Material Results or Dimensional results Bigfoot APQP and PPAP 6 30th June 2004 10:46 AM



The time now is 10:33 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts