The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > APQP and PPAP


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 18th January 2000, 05:32 AM
Nikos
Unregistered Guest

 
Posts: n/a
Question Containment Plan - When is a containment plan required and what should be included?

When is it required to conduct a containment plan and what should be included in that?

If containment plan is required should a run@rate be conducted????
Reply With Quote

Sponsored Links
  #2  
Old 18th January 2000, 07:51 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Yin Yang

I'm going to first suggest that you read: http://Elsmar.com/ubb/Forum12/HTML/000022.html - it has some discussion on containment.

Containment is the many things a company does when a problem is identified - internally or externally. Containment is just that - to contain. To keep from getting out.
Including:

* Identify part number and determine what has been shipped, when, what is in the hands of customers (in their stock - requires close contact with a customer 'point of contact'), what is enroute, etc.

* Determine when the 'event' occurred (like lot number).

* Isolate in-house and warehoused suspect product.

* Determine earliest and latest. Eg. Did test fail? When? Is this a 'standard' that went bad? In the case of a test instrument calibration, when was the last calibration? Can you test interim product to see if stuff in between is OK or where the calibration went far enough out as to allow nonconforming product to be 'passed' and shipped. What shipped product lots are 'suspect' and 'what's in the pipeline'?

* Close communication with customers to ensure 'timely' update on possible (suspect) lots or known 'contaminated' lots.

* The customer has to have knowledge of lots - what may they have shipped that was assembled with your suspect component.


What you do to ensure that product shipped from the point at which you know of the problem is 'Conforming' [HOLD EVERYTHING!!!! - What have we got here?] (often 100% inspection/test for the specific defect and then you 'certify' [as per the SS requirement, but typical outside the sector as well - can you say SORT?] each shipment for an agreed upon time period - which depends upon the problem identified, etc., as I'm sure you know). This is what you ship to the customer within X hours (not always considering reality). The intent here with the stated hours is to avoid interrupting a customer's manufacturing schedule.

You might also want to wade through: http://Elsmar.com/ubb/Forum4/HTML/000109.html

Run-at-Rate: if you change your process, this *may* be a part of the associated rePPAP.

[This message has been edited by Marc Smith (edited 15 February 2001).]
Reply With Quote
Sponsored Links

Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > APQP and PPAP

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Reference or recommendation of items to be included in the Business Plan Pancharee ISO/TS 16949 - International Automotive Quality Systems Standard 3 26th March 2009 10:21 AM
I need help with containment practices - First off/coil change containment lovingquality Manufacturing and Related Processes 4 18th August 2008 05:34 AM
Secondary Containment - What are the Requirements for Secondary Containment? elkel ISO 14001 and Environmental Related Standards 16 19th August 2007 11:23 PM
Containment FMEA and GP-12 (GM procedure for early production containment) Marc FMEA and Control Plans 9 17th November 2006 02:06 PM
What is the GP 12 Containment Procedure? bocky APQP and PPAP 3 7th March 2002 09:35 AM



The time now is 04:01 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts