29th June 1999, 12:53 PM
|
|
|
The new revsion of PPAP (May 1999) is now avaliable
FYI-The new revsion of PPAP (May 1999) is now avaliable and the old revsion becomes obsolete Septemeber 1, 1999
|

30th June 1999, 01:04 AM
|
 |
Forum Administrator
Registration Date: Jul 1997
Location: Revivim, Israel
|
|
Posts: 2,412
Thanks Given to Others: 100
Thanked 448 Times in 253 Posts
Karma Power: 195
|
|
Have you got a copy yet.
What are the changes.
Thanks
|

30th June 1999, 01:14 AM
|
|
|
I have my copy ordered from the aiag. In a nutshell the changes involve: reordering of PPAP requirements to align them with typical process flow, clarification of when submission is required, an appendix for heavy truck manufacturers, and most important for my purposes an appendix for bulk material suppliers. For more info, www.aiag.org - Link was: /pub/dcxfordgm.html gives a summary of the changes and ordering information
|

9th August 1999, 10:59 AM
|
|
|
|
I just called AIAG and the lady I spoke with said the 3rd ed PPAP manual WILL NOT BE AVAILABLE UNTIL I SEPT 99. So, if the 2nd ed bcomes obsolete 1 Sept. 99, and the new edition isn't available until 1 Sept. 99....what's wrong with this picture?
|

11th October 1999, 10:58 AM
|
|
|
|
I ordered mine and it will be sent as soon as its complete. I have not seen it yet.
FYI- from the AIAG...
_________________________
Coming Soon...Check Availability with AIAG’s Customer Service Department
PPAP-3 . . . Production Part Approval Process (PPAP Third Edition)
This manual is a requirement for production parts suppliers to DaimlerChrysler, Ford and General Motors. The Third Edition incorporates a number of revisions, which include:
Use of “auditable” language and a format consistent with QS-9000 Third Edition to support third party audit;
A reordering of the PPAP requirements aligned with the typical process flow;
Revision of “Preliminary Process Capability Requirements,” now called “Initial Process Studies,” to provide for the use of either Cpk or Ppk, depending on the amount and type of data available, consistent with the Statistical Process Control, SPC, reference manual;
Clarification of when customer notification and/or submission is required;
Incorporation of IASG Sanctioned Interpretations specific to PPAP;
Requirements for bulk material (see Bulk Material-Specific Appendix);
A Heavy Truck Manufacturer-Specific Appendix;
An enhanced glossary
|

11th October 1999, 12:23 PM
|
|
|
|
You may continue to use the old PPAP manual, even though technically obsolete until the new one comes out (This info came from our consultant).
|

15th December 1999, 11:07 PM
|
|
E-Mails Invalid or Rejected
Registration Date: Sep 1998
Location: St. Marys, PA
|
|
Posts: 302
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0 Karma: 40 
|
|
|
The new one is out and the old one will be obsolete Feb. 1, 20000. I am not all the way through it, but I am trouble finding anything that needs changed from what we already do in teh second edition unless we would be a bulk supplier. Am I missing something?
|

16th December 1999, 01:05 AM
|
 |
Forum Administrator
Registration Date: Jul 1997
Location: Revivim, Israel
|
|
Posts: 2,412
Thanks Given to Others: 100
Thanked 448 Times in 253 Posts
Karma Power: 195
|
|
|
Mine should arrive in the next day or two.
I will see what I can find
|
Lower Navigation Bar
|
|
|
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|