The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > APQP and PPAP


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 23rd February 1999, 10:30 AM
JeanMichel
Unregistered Guest

 
Posts: n/a
Lurker APQP Checklists - Process Flow Chart Checklist, PFMEA Checklist, Floor Plan Checklist

Does anyone know if all APQP checklists (for example: Process Flow Chart Cheklist, PFMEA Checklist, Floor Plan Cheklist, etc.) are required in the new QS 9000 edition.

My registrar asked me to at least comply with the forms.

I've not seen this requirement in the new Edition and in the APQP documentation.

For my point of view those checklists are just tools that you have to use as needed, except for Team Feasability Commitment Form wich we must use.

If the Registrar is right, we are introducing a lot of new parts each year. So we have done a lot a PFC, PFMEA, Control Plan. It's like asking my people to confirm each time that they still know how to do their job...

Any opinion or experience with audit with QS 9000 3rd Edition.


Regards
Reply With Quote

Sponsored Links
  #2  
Old 23rd February 1999, 11:45 PM
Howard Atkins's Avatar
Howard Atkins Howard Atkins is offline
Forum Administrator

Registration Date: Jul 1997
Location: Revivim, Israel
 
Posts: 2,412
Thanks Given to Others: 100
Thanked 448 Times in 253 Posts
Blog Entries: 8
Karma Power: 195
Karma: 4817
Howard Atkins is appreciated, and has over 1700 Karma points.
Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.
Send a message via Skype™ to Howard Atkins
Default

I cant see anything in QS that changes what is written in the APQP booklet.
Most checklists are refered to as "can be used" 3.3, 3.7 etc, despite this 2.1 "The design FMEA checklist in Appendix A-1 should also be reviewed"
The connection between using these checklists and the PPAP documentation is non existent, you must have the PPAP in place.
I agree that repeated use of the checklists makes for tiresome work and gives a feeling that we already know it all.
Try once every 6 months going over the checklists to see if you can get anything new out of them. There is always a cjance that a review will give a different perspective.
Build your procedures so that you can check them with the various reviews that you do, we have added the Feasability commitment into our contract review checklist.
We have occassionaly been requested to submit the checklists by our customers.
Reply With Quote
Sponsored Links

  #3  
Old 24th February 1999, 01:54 AM
B. Maynard
Unregistered Guest

 
Posts: n/a
Default

We do products for a wide range of customers and even if not required I still have
all of the items you listed posted at every machine.Control Plans,Gage R.&.R., Flow charts, X-Bar, p-Charts, Operator and Q.C. special instructions, Copy of Controlled B/P etc. I Use Qual-Tec Stands to hold all this Info.
Even If not required it shows you have your Total System in place. It makes the Registrar
As Clint says " Make my Day." Right Mark


[This message has been edited by B. Maynard (edited 02-23-99).]
Reply With Quote
  #4  
Old 12th March 1999, 10:17 AM
JeanMichel
Unregistered Guest

 
Posts: n/a
Default

Howard, I agree with your comments.

We are not Design Responsible. For the Team Feasability Commitment, we doing the exercice before going in PPAP to be sure that everything is OK before going further.
The idea to link it we Contract Review is interesting.

In the same idea, does someone use the Product Quality Summary and Sign-off (APQP Appendix F). Does your Registrar look for this form? We use something different, little bit less detailed but meeting the intent.

It's mostly a production release. We are looking the Run at Rate results, Scrap rate, Cpk, PPAP results. It is signed by our President (who is also reviewing our quotations (4.3) - we have linked our Contract Review Procedure with our New Product Launch Procedure)and also the Plant Manager.

What do you think about this approach?


Regards

JM
Reply With Quote
  #5  
Old 13th March 1999, 03:47 AM
Howard Atkins's Avatar
Howard Atkins Howard Atkins is offline
Forum Administrator

Registration Date: Jul 1997
Location: Revivim, Israel
 
Posts: 2,412
Thanks Given to Others: 100
Thanked 448 Times in 253 Posts
Blog Entries: 8
Karma Power: 195
Karma: 4817
Howard Atkins is appreciated, and has over 1700 Karma points.
Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.
Send a message via Skype™ to Howard Atkins
Default

We have a procedure that the engineering department are responsible for the part untill the end of 0 series.
We then have a meeting in which the production takes responsibility for the part. During this meeting we have a check list that includes parameters such as work procedures, part production sucess etc, etc. If the production do not feel that the part is really ready and the process stable they can refuse to take it. We then produce an action plan to correct the issues.
This is not excactly appendix F but similar.It is the last meeting of the APQP team.
Reply With Quote
  #6  
Old 3rd July 2002, 02:17 PM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Default

Anyone have a 'standard' PPAP ' submission checklist in excel?
__________________
A Search is a terrible thing to waste!
One Test is Worth 1000 Expert Opinions - The plural of anecdote is not data.
We can't solve problems by using the same kind of thinking we used when we created them. - Unknown
Reply With Quote
  #7  
Old 4th July 2002, 03:52 AM
IGORTS IGORTS is offline
Involved - Posts

Registration Date: Feb 2002
Location: SPAIN
Age: 32
 
Posts: 51
Thanks Given to Others: 0
Thanked 6 Times in 4 Posts
Karma Power: 33
Karma: 40
IGORTS has less than 100 Karma points so far.
Default

Marc,

I think that you have it in the Partcertall.xls file. ( See the last sheet )

Igor
Reply With Quote
  #8  
Old 8th July 2002, 09:24 AM
Sam's Avatar
Sam Sam is offline

Registration Date: Sep 1999
Location: Oklahoma
Age: 67
 
Posts: 1,437
Thanks Given to Others: 1
Thanked 29 Times in 17 Posts
Karma Power: 90
Karma: 1020
Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.
Default

Marc, Check this.
Attached Files: 1. Scan for viruses before using, 2. Please report any 'bad' files by Reporting the post it is in, 3. Use at your Own Risk.
File Type: xls apqp_status_log.xls (30.0 KB, 984 views)
__________________
Sam Goody
Reply With Quote
Thanks to Sam for your informative Post and/or Attachment!
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > APQP and PPAP

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
AIAG APQP Checklist - AIAG APQP Checklist (A1~A8) for every new part? qalsang APQP and PPAP 1 19th September 2008 07:00 AM
A-2 Design Information Checklist - Does anyone have the A-2 checklist in Word format? steve f Design and Development - Process and Product 3 4th August 2005 04:30 PM
Supplier audit checklists for special processes - Plating Process audit Checklist E0029626 Process Audits and Layered Process Audits 2 13th June 2005 11:57 PM
Chrysler PFMEA Audit Criteria Checklist to evaluate your Process FMEA Bigfoot FMEA and Control Plans 3 31st March 2005 01:52 PM
APQP Checklists - A5 (Floor Plan Checklist) - A7 (PFMEA checklist) MSAFAI APQP and PPAP 2 8th May 2001 08:49 AM



The time now is 12:30 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts