The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 14th February 2000, 11:01 AM
SRTipton
Unregistered Guest

 
Posts: n/a
I Say... PPAP Rev 3 Cpk/Ppk - Bulk Suppliers - Aluminum, ingot, coil

There appears to be some leeway for bulk suppliers like my company(ie, aluminum, ingot, coil) regarding PPAP Rev 3 Cpk/Ppk requirements. I'm not sure that my interpretation is correct but if a supplier-designated key characteristic is not in statistical control, then the reporting for PPAP should be by Ppk. We use a monthly Cpk/Ppk report to satisfy ongoing process capability (since our customer has no key characteristics identified for us). We have a prior interal audit nonconformance written against a process with a Cpk < 1.33. For the last 8 months the Cpk has been > 2 but this past month, the process was not in control (out of control points were investigeated with no assignable cause found)so, Ppk was used on the capability report. Now, the Ppk is < 1.33. Can I close the nonconformance based on the prior 8 months or should I leave it open and shoot for > 1.33 on both Cpk and Ppk, even though this is a supplier designated key characterstics.
Reply With Quote

Sponsored Links
  #2  
Old 15th February 2000, 07:55 AM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,853
Thanks Given to Others: 1,892
Thanked 1,563 Times in 1,016 Posts
Blog Entries: 4
Karma Power: 604
Karma: 11544
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Yin Yang

Quote:
Now, the Ppk is < 1.33. Can I close the nonconformance based on the prior 8 months or should I leave it open and shoot for > 1.33 on both Cpk and Ppk
I would think that if the process has been in control for 8 months and only briefly went out and is now back in and your investigation turned up nothing (we know we missed something, no?) I would think you could close it out. Problem is, we know there is an assignable cause - it's not noise - what will you do if it happens again in 8 months? Will anything 'trigger' you to come back to this incident (recurrence)?

Do see http://Elsmar.com/ubb/Forum10/HTML/000001.html

Cpk or Ppk: Which should you use?

Your customer has asked you to report the Cpk of the product you are sending. You know that to compute the Cpk, you need to have the product specifications, and that you need to have the mean and sigma. As you gather the information, someone asks, "which sigma do they want?"

You know that Cpk is calculated by dividing by 3 sigma. But which sigma should you use, estimated or calculated? Which is correct? Which would you report? Naturally, most of us would use the sigma that makes the Cpk look the best. But the sigma that makes the Cpk look best may not accurately reflect what you or your customer need to know about the process.

Confusion over calculating Cpk by two different methods is one reason that a new index, Ppk, was developed. Ppk uses the calculated sigma from the individual data.

Given that Ppk uses the calculated sigma, it is no longer necessary to use the calculated sigma in Cpk. The only acceptable formula for Cpk uses the estimated sigma.

In 1991, the ASQC/AIAG Task Force published the "Fundamental Statistical Process Control" reference manual, which shows the calculations for Cpk as well as Ppk. These should be used to eliminate confusion about calculating Cpk. So which value is best to report, Cpk or Ppk? Although they show similar information, they have slightly different uses.

Estimated sigma and the related capability indices (Cp, Cpk, and Cr) are used to measure the potential capability of a system to meet customer needs. Use it when you want to analyze a system's aptitude to perform.

Actual or calculated sigma (sigma of the individuals) and the related indices (pp, Ppk, and Pr) are used to measure the performance of a system to meet customer needs. Use it when you want to measure a system's actual process performance.

[This message has been edited by Marc Smith (edited 23 February 2001).]
Reply With Quote
Sponsored Links

  #3  
Old 15th February 2000, 08:45 AM
SRTipton
Unregistered Guest

 
Posts: n/a
Quote:
Problem is, we know there is an assignable cause - it's not noise - what will you do if it happens again in 8 months? Will anything 'trigger' you to come back to this incident (recurrence)?
The Trigger would again be the monthly ongoing capability report. If the out of control condition continues in the next report, then we know we have lost our in-control process.

[This message has been edited by Marc Smith (edited 15 February 2000).]
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Questions on use of SPC, Ppk, Cpk during PPAP narakorn Capability, Accuracy and Stability - Process, Machine, etc. 10 27th February 2009 06:32 PM
Bulk Material PPAP (Resin Suppliers) pmwong APQP and PPAP 3 26th April 2008 12:41 PM
Machine issue in Cpk/Ppk and Control Plan - PPAP Submissions Jimmy_Nie APQP and PPAP 5 4th January 2007 01:45 AM
Validation of Cpk and Ppk calculations - Sheet to check Cpk and Ppk values Howard Atkins SPC Monitoring and Statistical Analysis Techniques 0 20th February 2006 03:41 AM
PPAP Appendix F.3 "Customer Plant Connection" - Bulk Materials - Steel Coil Supplier Tim M APQP and PPAP 4 27th March 2000 04:25 PM



The time now is 07:04 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts