Management Review Minutes/Pareto Charts
Hello All!
I'm getting ready to "host" my first Management Review meeting next week and have been reviewing the minutes from previous meetings.
All Mgt. Review minutes are kept in a binder. ALSO in this binder are the pareto charts from our monthly pareto meetings only from the month that the Mgt. Review meeting was held. That was confusing - we have 4 Mgt. Review meetings per year and 12 Joint Supervisors (pareto) meetings. Right now there are 3 sets of pareto chart information in the Management Review Minutes binder along with the 3 previous meeting minutes from 2003. <a href='http://www.smileycentral.com/?partner=ZSzeb008' target='_blank'><img src='http://smileys.smileycentral.com/cat/4/4_12_2.gif' border=0></a>
I cannot find anything that requires me to keep pareto charts. I could start a separate folder/binder for them if this is necessary but I'd like to keep the Management Review minutes "pure" and not include extra information.
Does anyone else keep pareto charts? Our Management Responsibility procedure dictates that I save the Mgt. Review minutes. Thanks for any help.
|

10th December 2003, 11:13 AM
|
 |
qualitas ad nauseam
Registration Date: Sep 2003
Location: Saginaw, Michigan
Age: 50
|
|
Posts: 653
Thanks Given to Others: 3
Thanked 34 Times in 15 Posts
Karma Power: 79
|
|
It seems you should do a pareto analysis on your use of pareto charts.
Remember that pareto analysis is a tool, not a meeting title. At first that confused me, when you mentioned pareto meetings - but then I thought that must just be your local vernacular for supervisory reviews of performance. Is that correct?
Please provide more information as to what is discussed at these "pareto meetings", then maybe we can add more.
__________________
Rob - The sum of anecdotes is not data. -Roger Brinner
|

10th December 2003, 11:19 AM
|
 |
Super Moderator
Registration Date: Feb 2001
Location: Wellington, OH USA
Age: 69
|
|
Posts: 1,604
Thanks Given to Others: 80
Thanked 289 Times in 172 Posts
Karma Power: 149
|
|
I think I would keep any documentation used in the Management Review process. Not necessarily in the same folder/file but if you make reference to them as part of the review, you should have them. I keep all my MR data (agenda, overheads, charts, graphs, minutes etc.) in a file for each year. We have 24 review meetings and one summary review meeting every year. All the supporting documentation is kept in the annual MR file.
Dave
|

10th December 2003, 11:20 AM
|
 |
Part-Timer
Registration Date: Oct 2003
Location: Pennsylvania
|
|
Posts: 297
Thanks Given to Others: 13
Thanked 10 Times in 8 Posts
Karma Power: 38
|
|
Correct!
You are correct - we call our Joint Supervisors Meeting "The Pareto Meeting" because it is a meeting when all supervisors (office and shop) get together once a month and present their pareto chart information for each department.
I didn't think the information from that meeting needed to be associated with Management Review. Hope that helps. <a href='http://www.smileycentral.com/?partner=ZSzeb008' target='_blank'><img src='http://smileys.smileycentral.com/cat/4/4_12_3.gif' border=0></a>
|

10th December 2003, 12:39 PM
|
 |
Where's the shall?
Registration Date: Jul 2001
Location: Plymouth, MI
Age: 53
|
|
Posts: 2,202
Thanks Given to Others: 208
Thanked 166 Times in 128 Posts
Karma Power: 129
|
|
Quote:
|
Originally Posted by little__cee
I didn't think the information from that meeting needed to be associated with Management Review.
|
I hope that some of the information will make it into management reveiw, much the same way audit results and other data does. Other than that, I would agree with Dave Scott. Keep them handy, and reference them. As far as how long to keep the, that would be part of your overall recordkeeping scheme.
__________________
Dave B (the other Dave)
|

10th December 2003, 03:47 PM
|
 |
Courtesy Access
Registration Date: Jun 2002
Location: Ithaca, NY
Age: 59
|
|
Posts: 541
Thanks Given to Others: 21
Thanked 25 Times in 17 Posts
Karma Power: 66
|
|
Hi Little cee,
I guess I'd back up and look at what you want (or is required) to share with management. My own rule of thumb is to show top management a dashboard of metrics from a 50,000 ft. level, but also bring details in case I am asked for them. I always include the details in my "official minutes" but send just the meeting minutes themsleves to the attendees.
__________________
Rosie A
Warrior Goddess of Quality
|

1st June 2004, 04:22 PM
|
|
Inactive Registered Visitor
Registration Date: Jun 2004
Location: USA
|
|
Posts: 1
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 23 Karma: 10 
|
|
Special process
I understand special processes are what can only be measured by destructive testing. However, in the manufacture of discrete parts (say bolts), can the destructive test of one part in the lot make it so that its properties apply to the rest of the population, hence rendering the process no longer a "special process"? Or does the process remain special until 100% of the population is tested thru detructive testing and only at that point is it no longer a special process per ISO?  ?
|

1st June 2004, 04:45 PM
|
 |
Courtesy Access
Registration Date: Nov 2003
Location: Connecticut
Age: 59
|
|
Posts: 493
Thanks Given to Others: 1
Thanked 4 Times in 3 Posts
Karma Power: 46
|
|
Quote:
|
Originally Posted by nmay2k
I understand special processes are what can only be measured by destructive testing. However, in the manufacture of discrete parts (say bolts), can the destructive test of one part in the lot make it so that its properties apply to the rest of the population, hence rendering the process no longer a "special process"? Or does the process remain special until 100% of the population is tested thru detructive testing and only at that point is it no longer a special process per ISO?  ?
|
You certainly have me confused. . . and I came out of 15 years in the fastener industry. . . the Special process I think you may be referring to would be Heat Treating. . . where you would sample a heat treated lot of parts for destructive testing (Hardness, Tensile, Elong, R/A, etc) . . . they should also be of the same material heat lot. If my memory serves me correctly, the magic number is 5 samples for destructive testing from a lot. . .
But to get back to the the post. . . IMHO, A Special Process is a special process. . . it does not change.
I think you posted this in the wrong thread anyway. . . BTW. . . Welcome to the Cove!
__________________
If something is over engineered. . . it will probably be under manufactured! (Jim Eustace 1993)
Last edited by The Taz!; 1st June 2004 at 04:50 PM.
|
Lower Navigation Bar
|
|
|
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|