The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > National and International Business Standards > Customer and Company Specific Requirements


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 1 votes, 5.00 average. Display Modes
  #1  
Old 19th December 2003, 11:34 PM
WALLACE's Avatar
WALLACE WALLACE is offline
Courtesy Access

Registration Date: Nov 2000
Location: CANADA / ONTARIO
Age: 49
 
Posts: 750
Thanks Given to Others: 1
Thanked 13 Times in 10 Posts
Karma Power: 67
Karma: 771
WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.
Send a message via Skype™ to WALLACE
Default Business management measurables

I believe I have posted a similar thread some time ago when writing of the FPS (Ford Production Sytem) performance measurables of SQDCME (Safety, Quality, Delivery, Cost, Morale, Environment).
I want to encourage some discussion regarding the validity of using these measurables within a business management system in general.
I firmly believe that the SQDCME measurables are valid measures that can be adapted from the Ford FPS into Business management in general.
The SQDCME measures, processes and procedures that Ford use, may not be applicable to other businesses yet, I believe it's clear that the FPS measures are a good benchmark for cloning, using and adapting the principles of the measures to encourage a structured approach to business processes that may encourage a universal business management operating structure.
Any tackers on this one?
Wallace.
__________________
Ask, Seek, Knock.
Reply With Quote

Sponsored Links
  #2  
Old 19th December 2003, 11:36 PM
WALLACE's Avatar
WALLACE WALLACE is offline
Courtesy Access

Registration Date: Nov 2000
Location: CANADA / ONTARIO
Age: 49
 
Posts: 750
Thanks Given to Others: 1
Thanked 13 Times in 10 Posts
Karma Power: 67
Karma: 771
WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.
Send a message via Skype™ to WALLACE
Default Sqdcme Template

Attached is an SQDCME image.
Wallace.
Attached Thumbnails
SQDCME measurables.jpg  
__________________
Ask, Seek, Knock.
Reply With Quote
Sponsored Links

  #3  
Old 20th December 2003, 02:12 AM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,852
Thanks Given to Others: 1,892
Thanked 1,563 Times in 1,016 Posts
Blog Entries: 4
Karma Power: 604
Karma: 11544
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Default

I'd love to hear about how you come up with - how you define - Morale.
__________________
A Search is a terrible thing to waste!
One Test is Worth 1000 Expert Opinions - The plural of anecdote is not data.
We can't solve problems by using the same kind of thinking we used when we created them. - Unknown
Reply With Quote
  #4  
Old 20th December 2003, 03:11 AM
WALLACE's Avatar
WALLACE WALLACE is offline
Courtesy Access

Registration Date: Nov 2000
Location: CANADA / ONTARIO
Age: 49
 
Posts: 750
Thanks Given to Others: 1
Thanked 13 Times in 10 Posts
Karma Power: 67
Karma: 771
WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.
Send a message via Skype™ to WALLACE
Default Morale?!

Marc,
I can give you my particular interpretation and take on the Morale part of the SQDCME measures.
I hope all readers of this thread understand that, the purpose of this thread isn't to analyze the SQDCME measurables outwith the Ford interpretations.
I happen to believe the, SQDCME measures are a good benchmark for [B]"posible" adoption into business practices.
Attached is an image expanding the Morale branch. I certainly believe the Morale branch should be named differently.
Wallace.
Attached Thumbnails
Morale.jpg  
__________________
Ask, Seek, Knock.
Reply With Quote
  #5  
Old 20th December 2003, 06:23 AM
Peter Fraser's Avatar
Peter Fraser Peter Fraser is offline
Involved - Posts

Registration Date: Sep 2003
Location: ABERDEEN, SCOTLAND UK
 
Posts: 303
Thanks Given to Others: 5
Thanked 57 Times in 43 Posts
Karma Power: 48
Peter Fraser has disabled his/her Karma.
Default

Quote:
Originally Posted by WALLACE

I believe I have posted a similar thread some time ago when writing of the FPS (Ford Production Sytem) performance measurables of SQDCME (Safety, Quality, Delivery, Cost, Morale, Environment).
I want to encourage some discussion regarding the validity of using these measurables within a business management system in general.
Wallace.
Wallace

This fits well with what some call "Integrated Management", what I would call "good management" and what is, I believe, "Business Process Management".

My view is that the performance of a process ("running the business" is a mega-process) depends on how it is designed and managed. This (should) involve the recognition and management of all the factors that can influence the process, or that the process can affect, such as:
- the objective(s) of the process and of the organisation
- internal policies and values
- external standards and legislation
- risks and critical success factors
- the need (or desire) to measure performance
- customer and other stakeholder requirements and expectations
- assumptions, attitudes and prejudices
- the need to make best use of available resources
- the need to manage other outcomes from (ie consequences of) the process.

It looks as though your SQDCME can measure how well most of these are managed.
__________________
Peter
"Insight through Clarity"
Reply With Quote
  #6  
Old 20th December 2003, 01:14 PM
WALLACE's Avatar
WALLACE WALLACE is offline
Courtesy Access

Registration Date: Nov 2000
Location: CANADA / ONTARIO
Age: 49
 
Posts: 750
Thanks Given to Others: 1
Thanked 13 Times in 10 Posts
Karma Power: 67
Karma: 771
WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.
Send a message via Skype™ to WALLACE
Default Sqdcme

I agree with your take Peter.
The SQDCME measurables could be customized to fit any organization.
I have structured a quality manual around the SQDCME processes. The measures are forward thinking, in the sense that, Quality, Safety, Environment and business practices relating to Cost, Delivery and HR (Morale) may indeed be a structured in this manner in future revisions of Business standards. The by-product of using the SQDCME measures to communicate the specific attached branches causes the beginings of systems thinking.
Attached are a couple of example images of the SQDCME at work.
Wallace.
Attached Files: 1. Scan for viruses before using, 2. Please report any 'bad' files by Reporting the post it is in, 3. Use at your Own Risk.
File Type: zip SQDCME Critical priorities X1.zip (336.1 KB, 350 views)
File Type: zip The S,Q,D,C,M,E measurable's at work..zip (253.9 KB, 418 views)
__________________
Ask, Seek, Knock.
Reply With Quote
Thanks to WALLACE for your informative Post and/or Attachment!
  #7  
Old 20th December 2003, 02:29 PM
WALLACE's Avatar
WALLACE WALLACE is offline
Courtesy Access

Registration Date: Nov 2000
Location: CANADA / ONTARIO
Age: 49
 
Posts: 750
Thanks Given to Others: 1
Thanked 13 Times in 10 Posts
Karma Power: 67
Karma: 771
WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.WALLACE is appreciated, and has over 700 Karma points.
Send a message via Skype™ to WALLACE
Default

Marc,
I made a mistake in my reply to you.
It should have read: this thread is to analyze the SQDCME measurables outwith the Ford interpretations.
Wallace.
__________________
Ask, Seek, Knock.
Reply With Quote
  #8  
Old 21st December 2003, 11:25 AM
energy
Unregistered Guest

 
Posts: n/a
Default I thought "huh?", too.

Quote:
Originally Posted by Marc

I'd love to hear about how you come up with - how you define - Morale.
Very difficult, if not impossible, to accurately measure morale. You know when it's down. Why? Absenteeism, employee turnover are a good starting point. I looks like by including it as a measurable that the originator really wants it to appear that they care about morale. How about the morale of their Suppliers?
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > National and International Business Standards > Customer and Company Specific Requirements

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Potential Field Failures and their Impact on Quality, Safety and the Environment rexlee ISO/TS 16949 - International Automotive Quality Systems Standard 19 2nd August 2008 05:23 AM
Employee Morale Boosters - Low cost, quick, and easy ideas to boost morale little__cee Preventive Action and Continuous Improvement 31 17th August 2007 05:48 PM
Quality, Cost, Delivery, Safety, Morale/Man, Machine, Material, Method Spread Sheet Jerri Starrett Quality Tools, Improvement and Analysis 6 18th October 2006 12:40 PM
Quality Cost - Rework Cost Vs. Production Costs sxbalasu Misc. Quality Assurance and Business Systems Related Topics 10 3rd June 2006 03:03 AM
7.5.1 Control of production and service - Release, delivery, post-delivery activities disheppa ISO/TS 16949 - International Automotive Quality Systems Standard 3 20th April 2005 05:18 PM



The time now is 12:46 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts