The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > APQP and PPAP


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 25th February 2000, 10:16 AM
Sarang
Unregistered Guest

 
Posts: n/a
Question PPAP Process Requirements-Significant Production Run

We have just started working towards getting QS in the company. We have never done any PPAP before and our knowledge base in that area is very limited. I plan to start off with PPAP in a couple of weeks. I went through the manual and it seemed too ambiguous to me. The very first requirement:

"I.2.1 Significant Production Run:
Product shall be taken from a specific production run. Production run shall be from one hour to eight hours of production, and with specific production quantity to total a minimum of 300 consecutive parts. "

is eating my guts out for the last few days. Could someone explain this requirements to me in plain and simple english? PLEASE!!!

Thanks in advance.
Reply With Quote

Sponsored Links
  #2  
Old 25th February 2000, 12:18 PM
Sam's Avatar
Sam Sam is offline

Registration Date: Sep 1999
Location: Oklahoma
Age: 67
 
Posts: 1,437
Thanks Given to Others: 1
Thanked 29 Times in 17 Posts
Karma Power: 90
Karma: 1020
Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.
My understanding;
When all required customer approvals have been received,i.e.,Engr. Samples, Prototypes,Pre-launch and production is scheduled, then production runs 300 consecutive parts. From these 300 parts the required data for the PPAP is generated.
Depending the type of product you are producing you may get some relief from your customer on the quantity of parts to run.
At a previous company we called this run a "Pilot Lot" which we would place on hold until the PSW was approved.
Reply With Quote
Sponsored Links

  #3  
Old 25th February 2000, 12:27 PM
Sarang
Unregistered Guest

 
Posts: n/a
I Say...

Thanks Sam,
We make custom truck bodies and trailers. Most of our customers have altogether different specifications. Some of our customers do order in bulk, say 50 bodies or so. Where do I get 300 production parts from??? What kind of relief do I ask my customers for?? Is there any specific way to get something relieved?
Help me before I bang my head into a wall!!
Reply With Quote
  #4  
Old 25th February 2000, 12:47 PM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,567 Times in 1,019 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11564
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Money

I'd really like to hear from someone who has gone through this myself.
Reply With Quote
  #5  
Old 25th February 2000, 02:08 PM
Laura M's Avatar
Laura M Laura M is offline
Courtesy Access

Registration Date: Aug 1999
Location: Rochester, NY US
 
Posts: 759
Thanks Given to Others: 3
Thanked 17 Times in 15 Posts
Karma Power: 70
Karma: 656
Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.
Send a message via AIM to Laura M Send a message via Skype™ to Laura M
We had a product with less than a 300 piece order. The customer waived the 300 piece requirement. The 1 to 8 hour run is because some processes can produce 300 pieces in 5 minutes...you may manufacture several months worth if you run 8 hours. On the other hand, if you run at a rate of 300 pieces a day, the "significant production run" must represent a full days production. Partly to ensure "typical" variation is accounted for in your sample. Not looking for "special cause" variation at this point, but that your process is "capable" of producing parts to specification. Correct establishment of controls in the control plan make sure the process stays there....or, more at, that any shifts are detected, set-up is correct, etc.

As far as the specifics of collecting 300 parts, if your processes are similar, and you can group them into "families" then you probably do not need 300 of each kind, just 300 process samples. Depending on how "custom" the truck bodies and trailers are...it sounds like families is the way to go. You can probably PPAP your process using 300 pieces...mixed models. You may need to do specific Layouts for the different models. Do your customers require PPAP? Hopefully they at least know about it, so you can ask for the waiver and they know what you are talking about!
Reply With Quote
  #6  
Old 25th February 2000, 02:13 PM
Sam's Avatar
Sam Sam is offline

Registration Date: Sep 1999
Location: Oklahoma
Age: 67
 
Posts: 1,437
Thanks Given to Others: 1
Thanked 29 Times in 17 Posts
Karma Power: 90
Karma: 1020
Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.
Our present PPAP sample/production run consists of four (4) pieces max. We keep one as the sample and send three (3) to the customer with level II PPAP(modified). We have a letter on file from the customer approving this quanity.


Reply With Quote
  #7  
Old 25th February 2000, 02:30 PM
Sarang
Unregistered Guest

 
Posts: n/a
Read This!

Thanks Laura, Sam and Marc,
I get some idea about what I should be doing. Now to clarify some stuff for you guys so that you can pass on any more ideas you have:

Laura "Do your customers require PPAP? Hopefully they at least know about it, so you can ask for the waiver and they know what you are talking about!"

None of our customers require PPAP at this time. Infact no one has ever asked us about it and I am sure not many of them have the slightest idea about the topic. But we are going for QS9K because we plan to supply the B3 in the near future.

Marc: "I'd really like to hear from someone who has gone through this myself"

What exactly did you mean Marc?? I am sorry I am all messed up today, so I might not really be able to grasp things quickly.
Reply With Quote
  #8  
Old 25th February 2000, 11:27 PM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,567 Times in 1,019 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11564
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Yin Yang

Quote:
Originally posted by Sarang:

Marc: "I'd really like to hear from someone who has gone through this myself"

What exactly did you mean Marc?? I am sorry I am all messed up today, so I might not really be able to grasp things quickly.
I have not experienced a situation (or had a client who) only made 4 or 5 pieces - or even 50 - a year and had to do PPAP. I am saying I would like those who have to tell us their experience(s).
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > APQP and PPAP

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Production rate demonstration? APQP Manual 4.1 – Significant Production Run Gilberto APQP and PPAP 7 30th July 2009 10:44 AM
Requirement to follow Control Plan for serial production in a PPAP run Gajo4 APQP and PPAP 4 8th April 2009 09:50 AM
Production Trial Run/ Production Proveout Methodology and Key Checkpoints abhinav_sj APQP and PPAP 6 15th September 2007 12:51 PM
Significant environmental aspects for rubber printer roller production process Yasunari Kuo ISO 14001 and Environmental Related Standards 30 16th May 2007 02:16 PM
PPAP and Run @ Rate - We have a run at rate coming up soon for a visiting customer rotwang APQP and PPAP 1 12th October 2000 02:05 AM



The time now is 11:51 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts