The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > APQP and PPAP


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 13th June 2000, 12:14 PM
Thom Trimborn
Unregistered Guest

 
Posts: n/a
Please Help! PPAPs for job shops that produce short run assemblies (i.e 100 to 10,000 units)

While I understand the applications of PPAPs in contract manufacturing, I am curious if there is a scaled down version for job shops that produce short run assemblies (i.e 100 to 10,000 units). I would appriciate any guideance in this matter.
Reply With Quote

Sponsored Links
  #2  
Old 13th June 2000, 04:35 PM
BWoods
Unregistered Guest

 
Posts: n/a
BIG Smile

Quote:
Originally posted by Thom Trimborn:
While I understand the applications of PPAPs in contract manufacturing, I am curious if there is a scaled down version for job shops that produce short run assemblies (i.e 100 to 10,000 units). I would appriciate any guideance in this matter.

As you can see in the standard, the only senerio close to what you discribe is for the trucking industry. I agree that you have to have your customer "buy in" to your plan.

Also if you have families of parts, you may try the idea of doing PPAPs on families rather than part numbers. That is the way we do it.

Reply With Quote
Sponsored Links

  #3  
Old 14th June 2000, 01:09 AM
Jim Biz's Avatar
Jim Biz Jim Biz is offline
Forum Moderator

Registration Date: Mar 2000
Location: MID-WEST USA
 
Posts: 486
Thanks Given to Others: 0
Thanked 4 Times in 3 Posts
Karma Power: 51
Karma: 114
Jim Biz is appreciated, and has over 100 Karma points.Jim Biz is appreciated, and has over 100 Karma points.
I Say...

Annual usage as far as I know is not a factor. No scaled down versions in my expierience we folow PPAP individual customer instructins for designated level 1 2 or 3 parts (unless you can negotiate something directly with your customer)

We have completed PPAP documentation for as few as 3 parts -1 time run prototypes... then gone back & upgraded the same documentation forms & formats for each change as they come up...

Regards
Jim

[This message has been edited by Jim Biz (edited 13 June 2000).]
Reply With Quote
  #4  
Old 4th June 2006, 09:13 PM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Default Re: PPAPs for job shops that produce short run assemblies (i.e 100 to 10,000 units)

Just wondering if anyone currently visiting here is from a job shop producing such small 'lots'. If any of you are in this scenario, what are you doing about PPAPs these days under TS 16949??
__________________
A Search is a terrible thing to waste!
One Test is Worth 1000 Expert Opinions - The plural of anecdote is not data.
We can't solve problems by using the same kind of thinking we used when we created them. - Unknown
Reply With Quote
  #5  
Old 8th June 2006, 01:42 PM
gaugefixer gaugefixer is offline
E-Mails Invalid or Rejected

Registration Date: Jul 2004
Location: Ontario, Canada
 
Posts: 30
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 48
gaugefixer has less than 100 Karma points so far.
Default Re: PPAPs for job shops that produce short run assemblies (i.e 100 to 10,000 units)

Quote:
Originally Posted by Marc

Just wondering if anyone currently visiting here is from a job shop producing such small 'lots'. If any of you are in this scenario, what are you doing about PPAPs these days under TS 16949??
We are doing everything required under the standard; generally because the auditors will get us otherwise. The customers don't care whether you have GR&R and everything else-they just want good parts on time. Imagine making 100 parts a year: The paperwork can take more time than making the parts!
TS16949 is not friendly to small run manufacturers at all, it's definitely a burden.
Reply With Quote
  #6  
Old 22nd May 2007, 04:01 AM
Raffy's Avatar
Raffy Raffy is offline
Courtesy Access

Registration Date: Mar 2001
Location: Manila, Philippines
Age: 38
 
Posts: 639
Thanks Given to Others: 225
Thanked 63 Times in 49 Posts
Karma Power: 73
Karma: 1270
Raffy is appreciated, and has over 1100 Karma points.Raffy is appreciated, and has over 1100 Karma points.Raffy is appreciated, and has over 1100 Karma points.Raffy is appreciated, and has over 1100 Karma points.Raffy is appreciated, and has over 1100 Karma points.Raffy is appreciated, and has over 1100 Karma points.Raffy is appreciated, and has over 1100 Karma points.Raffy is appreciated, and has over 1100 Karma points.Raffy is appreciated, and has over 1100 Karma points.
Question Re: PPAPs for job shops that produce short run assemblies (i.e 100 to 10,000 units)

I agree, our personnel in our manufacturing company is less than 25 persons, and we are having some problem in documenting the TS16949 requirements. Not to mention, the APQP requirements, we are do not have product design responsibility.
My concern are the following: How are we going to document the APQP requirements:
1. Packaging Evaluation – Do we need a procedure on how are we going to evaluate packaging? What does packaging evaluation means in APQP? Is this a drop test requirement? Puncture test? Shear test? Please advice.
2. Floor Plan Layout – Do we also need a separate procedure on how to create a layout or can we just prepare a plant layout of the manufacturing process? Please advise.
3. Characteristics Matrix – basically, I’m having some confusion with regard to this, because what I understand these are customer dictated characteristics? Please comment. If not, how are we going to generate our own special characteristics? In our current process, in our FMEA, we do not specify our special characteristics? Please advise.
Thank you very much for the usual prompt attention you will give this request.
Best regards,
Raffy
Reply With Quote
  #7  
Old 22nd May 2007, 01:23 PM
Russ's Avatar
Russ Russ is offline

Registration Date: Apr 2001
Location: Tipton, IN USA
 
Posts: 222
Thanks Given to Others: 1
Thanked 22 Times in 16 Posts
Karma Power: 42
Karma: 172
Russ is appreciated, and has over 100 Karma points.Russ is appreciated, and has over 100 Karma points.
Send a message via AIM to Russ
Default Re: PPAPs for job shops that produce short run assemblies (i.e 100 to 10,000 units)

We are fortunate we only have a few customers that require a full blown PPAP. One customer who has unloaded dozens of new jobs on us in the last year decided the price wasn't worth it and conceded to a 1 pc. ISIR with documentation. This we give them for free just so we don't have to invest the hours it takes for full PPAP's. This has really lightened our PPAP load for that customer. Very few are open to this method though.
Reply With Quote
  #8  
Old 22nd May 2007, 10:57 PM
Helmut Jilling Helmut Jilling is offline
Auditor/Consultant

Registration Date: Aug 2005
Location: Ohio
Age: 55
 
Posts: 3,415
Thanks Given to Others: 389
Thanked 680 Times in 473 Posts
Karma Power: 188
Karma: 5128
Helmut Jilling is appreciated, and has over 1700 Karma points.
Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.
Default Re: PPAPs for job shops that produce short run assemblies (i.e 100 to 10,000 units)

Quote:
Originally Posted by gaugefixer View Post

We are doing everything required under the standard; generally because the auditors will get us otherwise. The customers don't care whether you have GR&R and everything else-they just want good parts on time. Imagine making 100 parts a year: The paperwork can take more time than making the parts!
TS16949 is not friendly to small run manufacturers at all, it's definitely a burden.
If the customer just wants good parts, then ask them to waive the PPAP requirement. It is their choice, after all. Then you will have evidence for the auditor that you don't have to do it...

You agreed to comply with the TS program, and asked the auditor to assess whether you met your commitment. Then you get mad at the auditor for assessing whether you met your commitment?
__________________
Relentlessly Pursue Excellence!
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > APQP and PPAP

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Congratulations Cove and Marc - 100,000 posts in 10,000 Threads AllanJ Old Forum News and Issues Threads Archive 7 8th July 2009 12:15 PM
Job Router examples? - Job routing systems small aerospace jobbing shops use Roopak AS9100 Aerospace Standard and Requirements 2 8th March 2008 02:14 PM
Weight Calculations - What is 100-600 u/ft2? What are these units of measurement? dbulak Misc. Quality Assurance and Business Systems Related Topics 12 16th December 2004 04:43 PM
Short Run Capability - Batch quantity is 15,000 to 20,000 Andrews SPC Monitoring and Statistical Analysis Techniques 5 11th March 2003 11:38 AM
Short run SPC Seminars? sulkinsf SPC Monitoring and Statistical Analysis Techniques 1 10th May 2002 10:13 AM



The time now is 11:48 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts