The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Manufacturing and Related Processes


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 20th January 2004, 01:41 PM
Jimmy Olson Jimmy Olson is offline
E-Mails Invalid or Rejected

Registration Date: Jul 2002
Location: WA
 
Posts: 331
Thanks Given to Others: 0
Thanked 5 Times in 5 Posts
Karma Power: 0
Karma: 226
Jimmy Olson is appreciated, and has over 200 Karma points.Jimmy Olson is appreciated, and has over 200 Karma points.Jimmy Olson is appreciated, and has over 200 Karma points.
Default Product/Process Qualification Plan

Hello Everybody.

We are currently in the process of opening a manufacturing facility in Mexico and I have been asked to supply information or guidelines for a qualification plan. We have some information (mainly based on FDA qualification framework) but managment wants something simple and easy to comprehend. So I figured who better to ask

If anybody has anything in 'laymen' terms or knows of a good resource I would appreciate it. Sorry that I'm not being more specific in what I'm looking for, but management isn't really being specific either I figured I will get some things together to show them and hopefully get a better idea of what they are looking for. Thanks

Last edited by Jimmy Olson; 11th February 2004 at 03:04 AM.
Reply With Quote

Sponsored Links
  #2  
Old 20th January 2004, 02:09 PM
Al Rosen's Avatar
Al Rosen Al Rosen is offline
Forum Moderator

Registration Date: Jun 2002
Location: Lawn Guyland
Age: 59
 
Posts: 3,101
Thanks Given to Others: 48
Thanked 390 Times in 272 Posts
Karma Power: 192
Karma: 4968
Al Rosen is appreciated, and has over 1700 Karma points.
Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.
Send a message via AIM to Al Rosen
Default Re: Product/Process Qualification Plan

Quote:
Originally Posted by Richard Olson

Hello Everybody.

We are currently in the process of opening a manufacturing facility in Mexico and I have been asked to supply information or guidelines for a qualification plan. We have some information (mainly based on FDA qualification framework) but managment wants something simple and easy to comprehend. So I figured who better to ask

If anybody has anything in 'laymen' terms or knows of a good resource I would appreciate it. Sorry that I'm not being more specific in what I'm looking for, but management isn't really being specific either I figured I will get some things together to show them and hopefully get a better idea of what they are looking for. Thanks
Hi Richard:

Are you qualifying a process or a product? What are the specifications or requirements you need to meet? A qualification plan should show that you are able to meet the specs or requirements. If you you have a product spec, the plan should show conformance to each spec requirement. If you have a process, you would show that you can perform to geach process spec. I don't know if this is any help? If you do a google search on "qualification test plan" you will find examples.
__________________
Al
Reply With Quote
Sponsored Links

  #3  
Old 20th January 2004, 02:22 PM
Jimmy Olson Jimmy Olson is offline
E-Mails Invalid or Rejected

Registration Date: Jul 2002
Location: WA
 
Posts: 331
Thanks Given to Others: 0
Thanked 5 Times in 5 Posts
Karma Power: 0
Karma: 226
Jimmy Olson is appreciated, and has over 200 Karma points.Jimmy Olson is appreciated, and has over 200 Karma points.Jimmy Olson is appreciated, and has over 200 Karma points.
Default Re: Product/Process Qualification Plan

Hi Al,

In a nutshell, they want me to come up with a qualification plan for the whole factory. I tried telling them that we just need to follow the ISO requirements and our own quality system, but was told that's not enough. I think they are confused about what they want, and I'm confused by proxy.

Basically we are setting up a facilitiy from scratch and they want a qualification plan that shows the steps and requirements for setting it up. As far as I can tell I think they are expecting some sort of checklist that they can hand off to someone in Mexico. I mentioned product qualification, equipment qualification, etc., but they want something that covers the whole thing (again, back to ISO requirements). I was hoping that maybe someone has experienced a similar situation and might have ideas.

I apologize for confusing everyone, but I need to stop writing now before I get too frustrated over the whole thing.
Reply With Quote
  #4  
Old 20th January 2004, 02:33 PM
Cari Spears's Avatar
Cari Spears Cari Spears is offline
Super Moderator

Registration Date: May 2003
Location: Clinton Township, MI USA
Age: 41
 
Posts: 1,600
Thanks Given to Others: 389
Thanked 134 Times in 80 Posts
Karma Power: 128
Karma: 3499
Cari Spears is appreciated, and has over 1700 Karma points.
Cari Spears is appreciated, and has over 1700 Karma points.Cari Spears is appreciated, and has over 1700 Karma points.Cari Spears is appreciated, and has over 1700 Karma points.Cari Spears is appreciated, and has over 1700 Karma points.Cari Spears is appreciated, and has over 1700 Karma points.
Default Re: Product/Process Qualification Plan

Holey Mackerel!! That's some task you've been given! I wish I could offer some suggestion - but I think I agree with you that the ISO standard and the QMS are indeed what they are kinda asking for.
__________________
First thing each morning, I try on my bathing suit. Then, nothing worse can happen the rest of the day.
Reply With Quote
  #5  
Old 20th January 2004, 03:30 PM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

Registration Date: Sep 2003
Location: Illinois
 
Posts: 7,534
Thanks Given to Others: 182
Thanked 1,127 Times in 762 Posts
Karma Power: 397
Karma: 11090
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Default Re: Product/Process Qualification Plan

Quote:
Originally Posted by Richard Olson

Hi Al,

In a nutshell, they want me to come up with a qualification plan for the whole factory. I tried telling them that we just need to follow the ISO requirements and our own quality system, but was told that's not enough. I think they are confused about what they want, and I'm confused by proxy.

Basically we are setting up a facilitiy from scratch and they want a qualification plan that shows the steps and requirements for setting it up. As far as I can tell I think they are expecting some sort of checklist that they can hand off to someone in Mexico. I mentioned product qualification, equipment qualification, etc., but they want something that covers the whole thing (again, back to ISO requirements). I was hoping that maybe someone has experienced a similar situation and might have ideas.

I apologize for confusing everyone, but I need to stop writing now before I get too frustrated over the whole thing.
I note your company is in the business of creating "turn key" manufacturing facilities for other companies.
  1. What is the basic checklist you work with?
  2. How many facilities have you [either the organization and/or you, personally]set up before?
  3. Has your organization ever set up facilities outside the USA before?
  4. Is the primary problem related to the type of facility or to the location?
With some answers to these basic questions, you may be able to get more pertinent input from The Cove members.

I note your organization was registered to the 1994 version of ISO. Have you updated to 2000?
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
Reply With Quote
  #6  
Old 20th January 2004, 03:35 PM
Jimmy Olson Jimmy Olson is offline
E-Mails Invalid or Rejected

Registration Date: Jul 2002
Location: WA
 
Posts: 331
Thanks Given to Others: 0
Thanked 5 Times in 5 Posts
Karma Power: 0
Karma: 226
Jimmy Olson is appreciated, and has over 200 Karma points.Jimmy Olson is appreciated, and has over 200 Karma points.Jimmy Olson is appreciated, and has over 200 Karma points.
Default Re: Product/Process Qualification Plan

Hi Wes,

Not entirely sure where you got the information, but it's not accurate.

We are a contract manufacturer of circuit board assemblies and currently only have the one facility (located outside of Seattle). We have also been registered to 9001:2000 since October of 2002.
Reply With Quote
  #7  
Old 20th January 2004, 03:52 PM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

Registration Date: Sep 2003
Location: Illinois
 
Posts: 7,534
Thanks Given to Others: 182
Thanked 1,127 Times in 762 Posts
Karma Power: 397
Karma: 11090
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Default Re: Product/Process Qualification Plan

Quote:
Originally Posted by Richard Olson

Hi Wes,

Not entirely sure where you got the information, but it's not accurate.

We are a contract manufacturer of circuit board assemblies and currently only have the one facility (located outside of Seattle). We have also been registered to 9001:2000 since October of 2002.
Your organization's web site says:
"A Focus on Partnerships

When you work with Applied Technical Services, you really work with us. Emphasizing working partnerships with our customers and OEMs enables us to be more responsive and flexible while delivering a higher quality product at a very competitive cost.


We provide turnkey and consignment manufacturing solutions and both SMT and Thru-hole PCB assembly and test services. You’ll find we offer the skills and expertise of a much larger contract manufacturer, but with the flexibility and service they simply can’t deliver.

Above all we are devoted to quality and we are proud of our quality system which is ISO 9002 certified."

"Turn key" has meaning to me of setting up independent facility for new owner who literally "turns key" to begin operation in new facility.

I based my thought about '94 vs. 2000 on statement "ISO 9002 certified"

What about answers to remaining 2 questions:
  1. What is the basic checklist you work with? (for taking on any new product line)
  2. Is the primary problem related to the type of facility or to the location?
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Manufacturing and Related Processes

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Where to put Product and Process Characteristics on the Control Plan. kemble FMEA and Control Plans 1 11th February 2009 12:54 PM
Process vs. Product on Control Plan - Weld a nut attachment on the subassembly Pudge FMEA and Control Plans 3 13th January 2009 04:48 PM
NPI (New Product Introduction) Process Qualification System Required Yew Jin Documentation Control Systems, Procedures, Forms and Templates 8 23rd April 2008 11:13 PM
APQP and Dod Product Qualification Program (Production Line Qualification) Robinn APQP and PPAP 4 7th May 2001 05:05 PM
APQP Requirements - Product/Process Assumptions and Product Assurance Plan JSmith APQP and PPAP 4 22nd February 2001 12:57 PM



The time now is 09:47 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts